Zheneng Wenzhou power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Zheneng Wenzhou power station (浙能温州发电厂) is an operating power station of at least 2520-megawatts (MW) in Panshi, Yueqing, Wenzhou, Zhejiang, China with multiple units, some of which are not currently operating. It is also known as 温州电厂一期 (Phase I Unit 1, Phase I Unit 2), 温州电厂四期 (Phase IV Unit 7, Phase IV Unit 8), 温州电厂二期 (Phase II Unit 3, Phase II Unit 4), 温州电厂三期 (Phase III Unit 5, Phase III Unit 6).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Zheneng Wenzhou power station | Panshi, Yueqing, Wenzhou, Zhejiang, China | 27.9957103, 120.8358582 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 27.9957103, 120.8358582
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase I Unit 1 | retired | coal: bituminous | 135 | subcritical | 1990 | 2016 |
Phase I Unit 2 | retired | coal: bituminous | 135 | subcritical | 1991 | 2016 |
Phase II Unit 3 | operating | coal: bituminous | 300 | subcritical | 2001 | – |
Phase II Unit 4 | operating | coal: bituminous | 300 | subcritical | 2001 | – |
Phase III Unit 5 | operating | coal: bituminous | 300 | subcritical | 2005 | – |
Phase III Unit 6 | operating | coal: bituminous | 300 | subcritical | 2005 | – |
Phase IV Unit 7 | operating | coal: bituminous | 660 | ultra-supercritical | 2015 | – |
Phase IV Unit 8 | operating | coal: bituminous | 660 | ultra-supercritical | 2015 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Zhejiang Zheneng Wenzhou Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [67.0%]; Wenzhou Industry Investment Group [30.3%]; Zhejiang Financial Development Co Ltd [2.8%] |
Phase I Unit 2 | Zhejiang Zheneng Wenzhou Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [67.0%]; Wenzhou Industry Investment Group [30.3%]; Zhejiang Financial Development Co Ltd [2.8%] |
Phase II Unit 3 | Zhejiang Zheneng Wenzhou Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [67.0%]; Wenzhou Industry Investment Group [30.3%]; Zhejiang Financial Development Co Ltd [2.8%] |
Phase II Unit 4 | Zhejiang Zheneng Wenzhou Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [67.0%]; Wenzhou Industry Investment Group [30.3%]; Zhejiang Financial Development Co Ltd [2.8%] |
Phase III Unit 5 | Zhejiang Zheneng Wenzhou Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [67.0%]; Wenzhou Industry Investment Group [30.3%]; Zhejiang Financial Development Co Ltd [2.8%] |
Phase III Unit 6 | Zhejiang Zheneng Wenzhou Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [67.0%]; Wenzhou Industry Investment Group [30.3%]; Zhejiang Financial Development Co Ltd [2.8%] |
Phase IV Unit 7 | Zhejiang Zheneng Wenzhou Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [67.0%]; Wenzhou Industry Investment Group [30.3%]; Zhejiang Financial Development Co Ltd [2.8%] |
Phase IV Unit 8 | Zhejiang Zheneng Wenzhou Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [67.0%]; Wenzhou Industry Investment Group [30.3%]; Zhejiang Financial Development Co Ltd [2.8%] |
Background
Two older units of 135 MW each were commissioned in 1990 and 1991, retired in 2010[1]. Units 3-6 of Zheneng Wenzhou power station, totaling 1,200 MW, were brought online between 2000 and 2004. The plant is owned by Zhejiang Provincial Energy Group.[2][3]
Background on Unit 3&4
The second phase of the power plant, unit 3&4 with 300 MW of each, began its construction in 1998, and completed in 2001. It was reportedly the first Project in Zhejiang Province that had foreign investment involved. [4]The operating company was registered as 浙江温州特鲁莱发电有限责任公司(Zhejiang Wenzhou Telulai (transcription) Power Generation Company Ltd). The shareholders of the company are 美国赛德中国控股有限公司 (America Sithe China Holdings Company Limited., a subsidiary of Sithe Energies, Inc, a grandson Subsidiary of Vivendi SA) 40%; 浙江浙能电力股份有限公司 (Zhejiang Zheneng Electric Power Co,. Ltd)30%; 温州电力投资有限公司 (Wenzhou Power Investment Co., Ltd.) 30.00%. [5]In 2003, China Resources Power Holdings co.,Ltd. purchased 40% shares from America Sithe China Holdings, becoming the major shareholder of the company. [6][7]
Expansion
Zhejiang Provincial Energy Group proposed the two-unit coal-fired Zheneng Wenzhou-4 power station, with a total planned capacity of 1,320 MW. The new units were completed in 2015.[8][9][10]
Units 7-8 began operating in 2015.[11]
Articles and Resources
References
- ↑ 浙能温州发电210米高烟囱爆破 关停小火电节能减排 BJX 北极星电力网新闻中心 来源:杨冰杰 9-25-2012
- ↑ "Coal-Fired Plants in China: Zhejiang," Power Plants Around the World, accessed November 2014
- ↑ 浙江浙能温州发电有限公司 Yueqing Daily, 04-03-2014
- ↑ 中美合作建设温州电厂二期扩建工程 People's Daily《人民日报》 06-29-1998
- ↑ 温州发电有限责任公司 Baidu Baike
- ↑ 外资电力独立开发商纷纷退出中国电力市场 12-23-2004, 中国经济时报
- ↑ 华润150亿挑战五大电力公司 南方日报报业集团-21世纪经济报道, 2-19-2003
- ↑ "温州发电厂四期“上大压小”工程", 浙江省发改委, 2014-02-11
- ↑ "浙江院设计温州电厂四期“上大压小”扩建工程8号机组点火一次成功," CEEC, 2015-09-06
- ↑ "中国能建设计建设的温州电厂8号机组通过168试运," China Engineering Corporation Limited, 2015-11-11
- ↑ "项目|中国能建温州电厂8号机组通过168试运," 中国能源建设集团有限公司, 2015.11.13