Zhengzhou Taixiang cogen power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Zhengzhou Taixiang cogen power station (郑州泰祥热电厂) is a retired power station in Huagong Road, Zhongyuan District, Zhengzhou, Henan, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Zhengzhou Taixiang cogen power station Huagong Road, Zhongyuan District, Zhengzhou, Henan, China 34.792588, 113.501699 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 34.792588, 113.501699

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 retired coal: unknown 135 subcritical 2008 2020
Unit 2 retired coal: unknown 135 subcritical 2008 2020

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Zhengzhou Taixiang Thermal Power Co Ltd [100%] Henan Kaixiang Industrial Group Co Ltd [31.8%]; Henan Kaixiang Technology Development Co Ltd [30.8%]; Hao Bo International Development [22.7%]; Good Shing Development [9.3%]; other [3.9%]; Shenzhen Haobo Xiangrui Investment Co Ltd [1.5%]
Unit 2 Zhengzhou Taixiang Thermal Power Co Ltd [100%] Henan Kaixiang Industrial Group Co Ltd [31.8%]; Henan Kaixiang Technology Development Co Ltd [30.8%]; Hao Bo International Development [22.7%]; Good Shing Development [9.3%]; other [3.9%]; Shenzhen Haobo Xiangrui Investment Co Ltd [1.5%]

Background

The Zhengzhou Taixiang power plant was commissioned in 2009 by Zhengzhou Taxiang Cogen Power. In 2019, the the Zhengzhou Municipal Bureau of Ecology and Environment issued the "Zhengzhou City Air Pollution Comprehensive Control Action Plan for the Autumn and Winter of 2019~2020" to fight urban pollution. Compared with the previous plan, 2019's action plan was more stringent, and included the suspension of several factories and increased restrictions on motor vehicles to strengthen pollution control measures.[1] One of the action items of this plan was closing the Zhengzhou Taixiang Plant, which was shut down after March 15, 2020, when the winter heating season ended. In 2020, at least one of the units was demolished.[2]

To make up for the new decrease in electricity supply, the company decided to construct a gas-fired heating plant on the site, consisting of 5 units of 58-MW. It is unclear if this new gas-fired plant will replace the Taixiang plant indefinitely.[3]

Zhengzhou Taixiang Cogen Power is also planning their second phase of a 2×600MW coal-fired heating unit, which has been included in Zhengzhou city’s central heating plan.[4]

Articles and Resources

References

  1. 嵩安环保管家 (November 17, 2019). "河南为了治理污染拼了,这个行业被停产4个月". 知乎专栏 (in 中文). Retrieved 2021-05-26.
  2. 网易 (July 25, 2020). "郑州泰祥热电厂爆破拆除,未来高新区供热由谁来替代补充?". 163. Retrieved 2021-05-26.{{cite web}}: CS1 maint: url-status (link)
  3. "高新区隔压能源站建设工作全面启动". 郑州热力集团有限公司. June 10, 2020. Retrieved 2021-05-26.{{cite web}}: CS1 maint: url-status (link)
  4. "郑州泰祥热电股份有限公司招聘信息-泰祥热电招聘-2021年招聘信息-北极星火电招聘网". hr.bjx.com.cn (in 中文(中国大陆)). 2019. Retrieved 2021-05-26.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.