Zhezkazgan-2 power station (ТЭЦ Жезказгана, Жезказганская ТЭЦ-2) is an announced power station in Kengir, Jezkazgan (Zhezkazgan), Ulytau, Kazakhstan.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Zhezkazgan-2 power station | Kengir, Jezkazgan (Zhezkazgan), Ulytau, Kazakhstan | 47.8402877, 67.6137144 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
Unit 1 | announced | coal: unknown, fossil gas: natural gas | 500[2] | unknown | yes | 2029 (planned)[2] |
Table 3: Unit-level ownership and operator details
Unit name |
---|
Unit 1 |
Background
The plan to build Zhezkazgan-2 power station was announced in February 2024 and confirmed in the government order on the 'Program for power sector development until 2035' released in February 2024.[3][4] Target completion date is 2029 and the plant would be built in the village of Kengir, close to Zhezkazgan city.[3]
The plant would be either coal-fired or gas-fired.[3] The government order does not specify the fuel type.[4] As of April 2024 it was assumed that the plant will be mostly coal-fired.
The plant would be built using investors' funds, not from the state budget funds.[3]
As of September 2024, there was no further news on the proposal.
Articles and Resources
References
- ↑ https://vlast.kz/novosti/59023-novuu-tec-v-oblasti-ulytau-postroat-za-scet-investorov.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 "Новую ТЭЦ в области Улытау построят за счет инвесторов". vlast.kz. February 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 "Приказ "Об утверждении Плана мероприятий по развитию электроэнергетической отрасли до 2035 года"" (PDF). /www.gov.kz. February 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.