Zhong Neng wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: ZhongNeng - phase 2 Offshore wind farm (Phase 2), ZhongNeng - phase 1 Offshore wind farm (Phase 1)

Zhong Neng wind farm (中能風場, 中能離岸風電計畫) is an announced wind farm in Changhua County, Taiwan.

Project Details

Table 1: Phase-level project details for Zhong Neng wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Construction[1][2] 2024 (planned)[3][1] 300 MW[1][2] Offshore hard mount[1][2] Copenhagen Infrastructure Partners; China Steel CO LTD; Diamond Generating Asia LTD (DGA)[3][4][2][3][4][2][3][4][2] Zhongneng Energy CO LTD (中能發電股份有限公司)[5]
2 Announced[6] 180 MW[6] Offshore mount unknown[6] Taiwan Life Insurance CO LTD; Diamond Generating Asia LTD (DGA); Copenhagen Infrastructure Partners[6][6][6]

Location

Table 2: Phase-level location details for Zhong Neng wind farm

Phase Name Location Coordinates (WGS 84)
1 Changhua County, Taiwan[3][2][7] 23.9671, 120.217 (approximate)[3][2][7]
2 Taiwan[6] 23.8978, 120.217 (approximate)[6]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240125200321/https://www.ramboll.com/news/ramboll-to-deliver-full-jacket-foundation-design-for-the-zhong-neng-offshore-wind-farm-in-taiwan. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20240125200200/https://money.udn.com/money/story/5612/7055008. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240126162219/https://www.offshorewind.biz/2023/10/04/all-locally-made-pin-piles-in-place-at-zhong-neng-wind-farm-offshore-taiwan/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240131114124/https://www.4coffshore.com/windfarms/taiwan/zhongneng---phase-1-taiwan-tw52.html. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://money.udn.com/money/story/5612/7055008 https://www.4coffshore.com/windfarms/taiwan/zhongneng---phase-1-taiwan-tw52.html https://money.udn.com/money/story/5612/7055008. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 https://web.archive.org/web/20240125200312/https://www.4coffshore.com/windfarms/taiwan/zhongneng---phase-2-taiwan-tw78.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20240131191805/https://znwp.com.tw/offshore-info/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)