Zinia 2 Oil Phase (Angola)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

Zinia 2 Oil Phase is an operating oil phase in Angola.

Along with Acacia Oil and Gas Field (Angola), Hortensia Oil and Gas Field (Angola), Perpetua Oil and Gas Field (Angola), and Zinia Oil and Gas Field (Angola), Zinia 2 Oil Phase is a part of the Pazflor Oil Project (Angola).

Project Details

Main Data

Table 1: Phase-level project details for Zinia 2 Oil Phase

1Final Investment Decision
2If a country or region is known to not produce any hydrocarbons in an unconventional method, this production type is assumed to be conventional
Unit name Status Operator Owner Discovery year FID1 year Production start year Production type2
Zinia 2 Operating[1] TotalEnergies E&P Angola[2] TotalEnergies (38.0%); Equinor (22.16%); ExxonMobil (19.0%); Azule Energy (15.84%); Sonangol Pesquisa e Produção (5.0%)[2][3][4][5][6] 2017[7] 2018[8] 2021[1][3] Conventional

Production and Reserves

Table 2: Reserves of Zinia 2 Oil Phase

million bbl = million barrels of oil
Fuel description Reserves classification Quantity Units Data year Source
crude oil reserves 75 million bbl 2022 [9]
oil reserves 65 million bbl 2021 [1][3][10]

Table 3: Production from Zinia 2 Oil Phase

million bbl/y = million barrels of oil per year
Category Fuel description Quantity Units Data year Source
production design capacity oil 14.6 million bbl/y 2022 [1][3]

Location

Table 4: Phase-level location details for Zinia 2 Oil Phase

Concession/Block Location Onshore/Offshore Coordinates (WGS 84)
Block 17[2] Offshore, Angola[11] Offshore[7] -7.563, 12.1271 (exact)[11]

The map below shows the exact location of the phase(s) within the Pazflor complex:

Loading map...

Articles and Resources

Additional Data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20210829234047/https://www.businesswire.com/news/home/20210505006266/en/Angola-Total-Starts-Production-From-Zinia-Phase-2-Successful-Short-cycle-Development-on-Block-17. Archived from the original on 29 August 2021. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20220516161815/https://www.nsenergybusiness.com/projects/zinia-2-deepwater-offshore-project-angola/. Archived from the original on 16 May 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20221202030007/https://totalenergies.com/media/news/press-releases/angola-total-starts-production-zinia-phase-2-successful-short-cycle. Archived from the original on 02 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20221209100502/http://www.offshore-technology.com/projects/pazflorangola/. Archived from the original on 09 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. https://www.equinor.com/where-we-are/angola. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20250118005658/https://find-and-update.company-information.service.gov.uk/company/00615393. Archived from the original on 18 January 2025. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://www.aventa.fr/projects/zinia-2/. {{cite web}}: Missing or empty |title= (help)
  8. https://www.aa.com.tr/en/energy/finance/total-to-start-offshore-oil-development-in-angola/20259. {{cite web}}: Missing or empty |title= (help)
  9. African Energy Commission (44835). "Africa and Just Energy Transition: Considerations for the Expansion of the African Oil & Gas Domestic Market" (PDF). African Energy Commission. Archived from the original (PDF) on 44972. Retrieved 44972. {{cite web}}: Check date values in: |access-date=, |date=, and |archive-date= (help); Invalid |url-status=Live (help)
  10. https://web.archive.org/web/20221130232605/https://www.offshore-technology.com/news/total-production-zinia-phase-2-field/. Archived from the original on 30 November 2022. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://www.nsenergybusiness.com/projects/zinia-2-deepwater-offshore-project-angola/ https://www.offshore-mag.com/production/article/16782158/total-starts-clov-oil-production-offshore-angola, https://www.nsenergybusiness.com/projects/zinia-2-deepwater-offshore-project-angola/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)