Zonda Photovoltaic Solar Park
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Zonda Photovoltaic Solar Park (Parque Solar Fotovoltaico Zonda) is an operating solar photovoltaic (PV) farm in Bella Vista, San Juan, Argentina.
Project Details
Table 1: Phase-level project details for Zonda Photovoltaic Solar Park
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2023[2] | 100 MWac[3] | PV[4] | YPF Energía Eléctrica SA [100%][5] | YPF Energía Eléctrica SA[5] |
2 | Pre-construction[3] | – | 100 MW[3] | PV[4] | YPF Energía Eléctrica SA [100%][5] | YPF Energía Eléctrica SA[5] |
3 | Pre-construction[3] | – | 100 MW[3] | PV[4] | YPF Energía Eléctrica SA [100%][5] | YPF Energía Eléctrica SA[5] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Zonda Photovoltaic Solar Park
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Bella Vista, San Juan, Argentina[3] | -30.4312, -69.2456 (approximate)[3] |
2 | San Juan, Argentina[3] | -30.4312, -69.2456 (approximate)[3] |
3 | San Juan, Argentina[3] | -30.4312, -69.2456 (approximate)[3] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240207161929/https://www.pv-tech.org/argentinian-utility-ypf-luz-powers-first-phase-of-300mw-solar-pv-project/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206162523/https://www.petrolplaza.com/news/29221. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 https://web.archive.org/web/20240201152811/https://renewablesnow.com/news/argentinas-ypf-luz-cuts-first-sod-on-100-mw-solar-project-772405/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 (PDF) https://web.archive.org/web/20220405135541/https://www.fixscr.com/site/download?file=9hmGdb4Vs_QlzEjqbyARmnyMGLdRwtEc.pdf. Archived from the original (PDF) on 05 April 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20240206162409/https://cordobainteriorinforma.com/2022/05/31/villa-de-maria-del-rio-seco-el-parque-solar-comenzara-a-funcionar-con-90-mil-paneles/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)