Zunhua-2 power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Zunhua-2 power station (河北建投遵化热电联产项目) is an operating power station of at least 700-megawatts (MW) in Xindianzi Town, Zunhua, Tangshan, Hebei, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Zunhua-2 power station | Xindianzi Town, Zunhua, Tangshan, Hebei, China | 40.0765209, 117.9789085 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 40.0765209, 117.9789085
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | operating | coal: bituminous | 350 | supercritical | 2019 |
Unit 2 | operating | coal: bituminous | 350 | supercritical | 2019 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Construction Investment Zunhua Thermal Power Co Ltd [100%] | Hebei Construction Investment Energy Investment Co Ltd [51.0%]; Zunhua North Mining Group Co Ltd [49.0%] |
Unit 2 | Construction Investment Zunhua Thermal Power Co Ltd [100%] | Hebei Construction Investment Energy Investment Co Ltd [51.0%]; Zunhua North Mining Group Co Ltd [49.0%] |
Background on Project
Hebei Construction & Investment Group is currently planning to build a two-unit coal-fired power plant with a total planned capacity of 700 MW in Hebei Province.[1][2][3]
The project was permitted in January 2016.[4] Construction is planned to begin in December 2016. The units are planned to come online in 2018.[5]
Planet satellite photos show construction progress from November 2017 to November 2019.
Unit 1 was commissioned in July 2019.[6]
Unit 2 was commissioned in December 2019.[7]
Articles and Resources
References
- ↑ "国电电力签约遵化2×350MW热电联产项目," 2011-5-19
- ↑ "国电电力签约遵化2×350MW热电联产项目", 中国国电, 2014-04-30
- ↑ "我市召开国电电力热电联产项目调度会议," 2015-05-12
- ↑ "投资35.67亿元 河北发改委核准国电电力遵化热电联产项目(附文)," 北极星电力, 2016/1/4
- ↑ "河北建投遵化热电联产工程EPC总承包合同签订," CEEC, 9-26-2016
- ↑ "河北建投遵化2×350MW热电联产工程1号机组通过168小时满负荷试运行," BJX, 2019/7/11
- ↑ "河北建投遵化热电联产项目2号机组高质量移交," China Power, 2020-01-03