Aceros Arequipa Pisco steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Aceros Arequipa Pisco steel plant (Planta siderúrgica de Pisco (Spanish)) is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in Pisco, Ica, Peru.

Location

The map below shows the exact location of the plant in Pisco, Ica, Peru:

Loading map...
  • Location: Carretera Panamericana Sur Km 241. Paracas. Pisco - Ica, Peru
  • Coordinates (WGS 84): -13.788622, -76.168172 (exact)

Background

Founded in 1964, Aceros Arequipa is Peru's largest steel maker. The company began producing finished steel products for the Peruvian market in 1966 with the opening of its new rolling mill in the city of Arequipa.[1] A second lamination facility was launched in Pisco in 1983, and the company began producing its own crude steel in 1987 following a merger with Laminadora del Pacífico.[1] In 1996, DRI operations were added at the Pisco plant, and a year later the company incorporated itself as Aceros Arequipa S.A. following the acquisition of another competitor, Aceros Calibrados S.A.[1] In 2015, Aceros Arequipa consolidated its position as Peru's market leader with the opening of a second rolling mill at Pisco.[1] A year later, the company shut down its original plant in Arequipa, signaling its intention to concentrate future operations at the Pisco location.[2]

2021 capacity expansion and transition from EAF 1 to EAF 2

In July 2021, Aceros Arequipa Pisco raised its nominal steel production capacity from 850 ttpa (thousand tonnes per annum) to 2.1 million tpa with the inauguration of a new SMS electric arc furnace.[1][3]

In February 2022, the plant's older Danieli EAF was deactivated and placed on standby pending an increase in domestic or international steel demand.[4][5][6] Aceros Arequipa's annual reports confirmed that melt shop #2 was responsible for all subsequent steel making at the plant in 2022 and 2023.[5][6]

As of December 2024, EAF 1 remained idle. While Aceros Arequipa has announced its intention to eventually make improvements to EAF 1 and achieve the plant's full production capacity of 2100 ttpa, recent company reports have offered no timeline or other specific details regarding the reactivation of the older furnace.[6]

Plant Details

Table 1: General Plant Details

Phase Plant status Start date Workforce size
Main plant Operating[7][8] 1987[9]
Main plant Operating[7][8] 1987[9]
Expansion Operating[10][7] 2021[10][11] 745[8]

Table 2: Ownership and Parent Company Information

Phase Owner Owner company PermID Owner company GEM ID
Main plant Corporacion Aceros Arequipa SA[12][13][14] 4295886029 E100000130730

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
Main plant finished rolled[13] corrugated bars, structures, wire rods, angles, U channels plates, tees, square bars, round bars, helical rounds[13] building and infrastructure; tools and machinery; transport[15] 2022[16] DRI, EAF[13][17][18] 1 Danieli EAF (80-tonne, 2004); 2 SIIL rotary kiln DRI plants (1996)[19][13][20][21]
Main plant finished rolled[13] corrugated bars, structures, wire rods, angles, U channels plates, tees, square bars, round bars, helical rounds[13] building and infrastructure; tools and machinery; transport[15] 2022[16] DRI, EAF[13][17][18] 1 Danieli EAF (80-tonne, 2004); 2 SIIL rotary kiln DRI plants (1996)[19][13][20][21]
Expansion finished rolled[13] corrugated bars, structures, wire rods, angles, U channels plates, tees, square bars, round bars, helical rounds[13] building and infrastructure; tools and machinery; transport[15] 2022[16] EAF[13][17] 1 SMS EAF (120-tonne, 2021)[22]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant mothballed 850 TTPA[8] 850 TTPA[8]
Main plant operating [8] [8]
Expansion operating 1250 TTPA[8] 1250 TTPA[8]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant mothballed [23][23] [23][23]
Main plant operating 80 TTPA[23][23] 80 TTPA[23][23]
Expansion operating

Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year EAF Production Total (all routes)
2020 388 TTPA 388 TTPA[24][14]
2021 850 TTPA[25] 850 TTPA[25]
2022 0 TTPA[8] 0 TTPA

Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year DRI Production Total (all routes)
2020 0 TTPA[18][26] 0 TTPA[24]
2021 0 TTPA[18][27] 0 TTPA
2022 0 TTPA[28][23] 0 TTPA

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 Conócenos, Aceros Arequipa, Retrieved on: 2022-02-09
  2. "Aceros Arequipa cierra su planta en Arequipa y concentra sus operaciones en Pisco". Gato Encerrado. July 25, 2016.{{cite web}}: CS1 maint: url-status (link)
  3. "Primera colada en la nueva acería de Aceros Arequipa". Energiminas. July 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  4. "Memoria Anual Integrada 2021 (p 47)" (PDF). Aceros Arequipa. February 24, 2022.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 "Memoria Anual Integrada 2022 (pp 25-26)" (PDF). Aceros Arequipa. March 30, 2023.{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 6.2 Aceros Arequipa (2024-04-30). "Memoria integrada 2023 (p 35)" (PDF).{{cite web}}: CS1 maint: url-status (link)
  7. 7.0 7.1 7.2 (PDF) https://investors.acerosarequipa.com/storage/memoriasintegradas/April2022/NOzbrfRtKEmp84DjfqmJ.pdf. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 (PDF) https://investors.acerosarequipa.com/storage/memorias/April2023/AinBaivBV0R0kjhPuiND.pdf. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20220318144951/https://www.acerosarequipa.com/en/conocenos. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20220319015653/https://energiminas.com/primera-colada-en-la-nueva-aceria-de-aceros-arequipa. Archived from the original on 19 March 2022. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20220112204403/https://www.acerosarequipa.com/conocenos. Archived from the original on 12 January 2022. {{cite web}}: Missing or empty |title= (help)
  12. (PDF) https://web.archive.org/web/20210807133859/http://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2020.pdf. Archived from the original (PDF) on 07 August 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  13. 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 13.11 https://web.archive.org/web/20220120111219/https://www.acerosarequipa.com/procesos-de-produccion. Archived from the original on 20 January 2022. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 (PDF) https://web.archive.org/web/20220319005436/https://investors.acerosarequipa.com/storage/memorias/March2021/uth9Ucr0uLTxOJMjeVYl.pdf. Archived from the original (PDF) on 19 March 2022. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 https://web.archive.org/web/20220308140609/https://www.acerosarequipa.com/. Archived from the original on 08 March 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  16. 16.0 16.1 16.2 (PDF) https://mail.acerosarequipa.com/sites/default/files/certificaciones/2023-05/ISO_14001_12_05_2023.pdf?fv=oylverdk. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 17.2 (PDF) https://www.smv.gob.pe/ConsultasP8/temp/Memoria%20Integrada%20CAASA%202021.pdf. {{cite web}}: Missing or empty |title= (help)
  18. 18.0 18.1 18.2 18.3 (PDF) https://web.archive.org/web/20221008040524/https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2021.pdf. Archived from the original (PDF) on 08 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  19. 19.0 19.1 (PDF) https://web.archive.org/web/20220320142013/https://dspace.unitru.edu.pe/bitstream/handle/UNITRU/3422/ChambergoVargas_J.pdf?sequence. Archived from the original (PDF) on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  20. 20.0 20.1 (PDF) https://web.archive.org/web/20211129195124/https://www.midrex.com/wp-content/uploads/Midrex-STATSbookprint-2020.Final_.pdf. Archived from the original (PDF) on 29 November 2021. {{cite web}}: Missing or empty |title= (help)
  21. 21.0 21.1 AIST Electric Arc Furnace Roundup https://www.acerosarequipa.com/conocenos2022 AIST Electric Arc Furnace Roundup. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  22. https://www.sms-group.com/en-lu/press-and-media/press-releases/press-release-detail/aceros-arequipa-orders-steel-mill-and-continuous-billet-caster-from-sms-group. {{cite web}}: Missing or empty |title= (help)
  23. 23.0 23.1 23.2 23.3 23.4 23.5 23.6 23.7 23.8 (PDF) https://web.archive.org/web/20231103031625/https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2022.pdf. Archived from the original (PDF) on 03 November 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  24. 24.0 24.1 (PDF) https://web.archive.org/web/20210810153606/https://www.alacero.org/sites/default/files/publicacion/america_latina_en_cifras_2020_es-en_09nov.pdf. Archived from the original (PDF) on 10 August 2021. {{cite web}}: Missing or empty |title= (help)
  25. 25.0 25.1 (PDF) https://web.archive.org/web/20220621081540/https://investors.acerosarequipa.com/storage/memoriasintegradas/May2022/oMrjpG0K6GsRPXezQMN3.pdf. Archived from the original (PDF) on 21 June 2022. {{cite web}}: Missing or empty |title= (help)
  26. (PDF) https://web.archive.org/web/20210124142651/http://www.acero.org.ar/wp-content/uploads/2020/11/america_latina_en_cifras_2020_es-en_09nov.pdf. Archived from the original (PDF) on 24 January 2021. {{cite web}}: Missing or empty |title= (help)
  27. (PDF) https://web.archive.org/web/20220117191258/http://www.acero.org.ar/wp-content/uploads/2021/12/america_latina_en_cifras_2021_es-en_capa2_0.pdf. Archived from the original (PDF) on 17 January 2022. {{cite web}}: Missing or empty |title= (help)
  28. (PDF) https://web.archive.org/web/20230307003012/https://cms.alacero.org/uploads/Alacero_America_latina_en_cifras_Espanhol_47683530c0.pdf. Archived from the original (PDF) on 07 March 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Resources