Ahdeb-PS-2 oil pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Ahdeb-PS-2 oil pipeline is an existing oil pipeline, running from Ahdeb oilfield to PS-2 pumping station, Iraq.
Location
The pipeline runs from Ahdeb oilfield, Wasit governorate, to PS-2 pumping station, along the Iraq Strategic Pipeline, Muthanna governorate, Iraq.
Background
Pipeline Details
- Operator: South Oil Company
- Parent Company: Iraq National Oil Company
- Current capacity: 24 inches
- Length: 216 kilometers
- Status: Operating
- Start Year:
Articles and resources
References
- ↑ Table 6.9: Main crude oil pipelines in OPEC members, 2016, OPEC Annual Statistical Bulletin 2017, pp. 87-94.
- ↑ Ahdeb Oil Field, Wikimapia, accessed July 2018.