Ajaokuta Steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Ajaokuta Steel plant is a blast furnace-basic oxygen furnace (BF-BOF) steel plant under construction in Ajaokuta, Kogi State, Nigeria.

Location

The map below shows the exact location of the plant in Ajaokuta, Kogi State, Nigeria:

Loading map...
  • Location: Ajaokuta Steel Company Ltd, 263106, Ajaokuta, Nigeria
  • Coordinates (WGS 84): 7.511336, 6.689364 (exact)

Plant Details

Table 1: General Plant Details

Plant status Construction date Workforce size
Construction[1][2][3] 1979[2] 10000[4]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Full Ajaokuta Steel Co Ltd [100%] 5040059767 [100%] E100001000296 [100%] Ajaokuta Steel Company Ltd[5] 5040059767 E100000002408

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
semi-finished; finished rolled[6] billets; beam; channels; angles; rebar; squares; hexagon; sections; rod[7] BF, BOF[6] coking plant; sinter plant; BOF[6]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
construction 1300 TTPA[6] 1300 TTPA[6]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
construction 1355 TTPA[8][6] 1355 TTPA[8][6]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke
2600 TTPA[6] 880 TTPA[6]

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown construction[9] unknown 1979[2] unknown 2000 m³[8] 1355[8][6] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240320053704/https://nairametrics.com/2023/12/06/ajaokuta-steel-company-fg-budgets-n4-45-billion-seeks-n35-billion-from-investors/. Archived from the original on 20 March 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20230124215732/https://guardian.ng/business-services/ajaokuta-steel-plant-like-refineries-a-story-retold-promises-unkept/. Archived from the original on 24 January 2023. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20220320165010/https://www.ajaokutasteel.com/site/pagef.php?cnt. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240124203708/https://www.ajaokutasteel.com.ng/about. Archived from the original on 24 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240124201626/https://www.ajaokutasteel.com.ng/. Archived from the original on 24 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://web.archive.org/web/20240124203615/https://www.ajaokutasteel.com.ng/company-overview. Archived from the original on 24 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240124203640/https://www.ajaokutasteel.com.ng/products. Archived from the original on 24 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 (PDF) https://web.archive.org/web/20221002011936/https://idl-bnc-idrc.dspacedirect.org/bitstream/handle/10625/8420/IDL-8420.pdf. Archived from the original (PDF) on 02 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. https://web.archive.org/web/20221127084003/https://nairametrics.com/2018/08/23/why-ajaokuta-steel-company-cannot-produce-steel/. Archived from the original on 27 November 2022. {{cite web}}: Missing or empty |title= (help)

Resources