Ajaokuta Steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Ajaokuta Steel plant is a steel plant in Ajaokuta, Kogi State, Nigeria that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.

Location

The map below shows the exact location of the plant in Ajaokuta, Kogi State, Nigeria:

Loading map...
  • Location: Ajaokuta Steel Company Ltd, 263106, Ajaokuta, Nigeria
  • Coordinates (WGS 84): 7.511336, 6.689364 (exact)

Plant Details

Table 1: General Plant Details

Construction date Workforce size Power source Iron ore source Coal source
1979[1] 10000[2] Captive Power Plant (110 mw)[3][4] Itakpe Iron Ore Mine[5][6] unknown

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Full Ajaokuta Steel Co Ltd 5040059767 E100000002408 Ajaokuta Steel Co Ltd[7] 5040059767 E100000002408

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment
semi-finished, finished rolled[4] rebar, sections, square, rod, billet, channel, angle, beam[8] unknown unknown unknown BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
construction 1300[4] 1300[4]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
construction 1355[4][9] 1355[4][9]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF[4] 2610[8][4] 880[4] NF[4]

Unit Details

Table 7: Blast Furnace Details

Unit name Status Construction date Current size Current capacity (ttpa) Decarbonization technology
unknown BF (1) construction[10] 1979[1] 2000.0[9] 1355[9][4] not found; not found

Table 8: Basic Oxygen Furnace Details

Unit name Status Construction date Current capacity (ttpa) Current size
unknown BOF (1) construction[11][1][12] 1979[1] 650[4] 130.0 tonnes[4]
unknown BOF (2) construction[4] 1979[1] 650[4] 130.0 tonnes[4]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20230124215732/https://guardian.ng/business-services/ajaokuta-steel-plant-like-refineries-a-story-retold-promises-unkept/. Archived from the original on 2023-01-24. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240124203708/https://www.ajaokutasteel.com.ng/about. Archived from the original on 2024-01-24. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://www.ijmer.com/papers/Vol3_Issue6/CI3637333739.pdf. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 https://web.archive.org/web/20240124203615/https://www.ajaokutasteel.com.ng/company-overview. Archived from the original on 2024-01-24. {{cite web}}: Missing or empty |title= (help)
  5. https://newscentral.africa/ajaokuta-steel-company-ready-for-december-takeoff/. {{cite web}}: Missing or empty |title= (help)
  6. https://www.gem.wiki/NIMCO_Itakpe_Mine. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240124201626/https://www.ajaokutasteel.com.ng/. Archived from the original on 2024-01-24. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20240124203640/https://www.ajaokutasteel.com.ng/products. Archived from the original on 2024-01-24. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 (PDF) https://web.archive.org/web/20221002011936/https://idl-bnc-idrc.dspacedirect.org/bitstream/handle/10625/8420/IDL-8420.pdf. Archived from the original (PDF) on 2022-10-02. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20221127084003/https://nairametrics.com/2018/08/23/why-ajaokuta-steel-company-cannot-produce-steel/. Archived from the original on 2022-11-27. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20220320165010/https://www.ajaokutasteel.com/site/pagef.php?cnt. Archived from the original on 2022-03-20. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20240320053704/https://nairametrics.com/2023/12/06/ajaokuta-steel-company-fg-budgets-n4-45-billion-seeks-n35-billion-from-investors/. Archived from the original on 2024-03-20. {{cite web}}: Missing or empty |title= (help)

Resources