Aktobe-Kostanay Gas Pipeline
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Aktobe-Kostanay Gas Pipeline (Russian: Газопровод "Актобе- Костанай", "КС-14 – Рудный") is a proposed gas pipeline in Kazakhstan.[1]
Location
The pipeline will run from from the Compressor Station 14 near Aktobe, Aktobe region, to Kostanay, Kostanay region, Kazakhstan.[1]
Project Details
- Operator: Intergas Central Asia[2]
- Owner: Qazaqgaz, UCC Holding[3]
- Parent Company: Samruk-Kazyna SWF JSC[4], Power International Holding[5]
- Capacity: 4.1 bcm/year[1]
- Length: 630 km[1]
- Diameter:
- Status: Proposed[1]
- Start Year: 2026[1]
- Cost: USD 1 billion[6]
- Financing: Qazaqgaz, UCC Holding[6]
- Associated Infrastructure: Bukhara-Ural Gas Pipeline (Aktobe Branch Pipelines I, II, III), Kartaly-Rudny-Kosatanay Gas Pipeline
Background
In February 2024, it was reported that an agreement had been signed with Qatari investors, specifically with Power International Holding, to jointly implement the project for construction of the Aktobe-Kostanay Gas Pipeline.[7] In May 2024, the terms of the deal with Qatar, including for implementation of three other joint gas projects, were approved at a government meeting. According to the agreement, Qatari UCC Holding (a subsidiary of Power International Holding) will build two gas processing plants, a new compressor station KS-14, and the main gas pipeline KS-14 - Kostanay - Aktobe, as well as the second line of the Beineu-Bozoy-Shymkent pipeline. QazaqGaz and UCC Holding reached a consensus on all four projects. Their joint implementation is expected to begin in the near future.[3]
In July 2024, it was reported that the feasibility study was expected to be completed in 2024. Construction is scheduled to begin at the end of the year.[6] In August 2024, the construction of the pipeline was announced at a meeting with population of the Kostanay region. The pipeline will supply gas to individual and industrial consumers in the region.[1] The Kostanay region, currently supplied by the Kartaly-Rudny-Kostanay Gas Pipeline built in 1965, is facing gas shortages.[6]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Строительство газопровода «Актобе- Костанай» анонсировал на встрече с населением Костанайского района аким Костанайской области Кумар Аксакалов". arna-news.kz. August 8, 2024. Retrieved August 19, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "About the Company". ICA. 2024. Retrieved August 19, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 "Строительство газоперерабатывающих заводов в РК: условия сделки с Катаром утвердили в правительстве". www.kt.kz. May 3, 2024. Retrieved August 19, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "National company QazaqGaz JSC (KZTG) - Kazakhstan Stock Exchange (KASE)". kase.kz (in русский). Retrieved 2022-07-22.
- ↑ "Our Group of Companies". Power International Holding. Retrieved August 19, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 6.0 6.1 6.2 6.3 "В конце 2024 года начнут строить новый газопровод «Актобе-Костанай»". top-news.kz. July 29, 2024. Retrieved August 19,2024.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Саткалиев назвал газовые проекты, которые планируется реализовать в Казахстане с инвесторами". Forbes. February 23, 2024. Retrieved August 19, 2024.
{{cite web}}
: CS1 maint: url-status (link)