Aktobe Generatsiya steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Aktobe Generatsiya steel plant (Cталеплавильный завод ТОО «Актобе Генерация»), also known as Aktobe Generatsia steel plant, is a blast furnace-basic oxygen furnace (BF-BOF) announced steel plant in Aktobe, Kazakhstan.

Location

The map below shows the approximate location of the plant in Aktobe, Kazakhstan:

Loading map...
  • Location: Aktobe, Kazakhstan
  • Coordinates (WGS 84): 50.355117, 57.145119 (approximate)

Background

Construction of the plant was initially announced in 2022, but the project was delayed due to insufficient technical conditions for connecting to the gas pipeline network. In early 2024, it was reported that construction efforts had resumed. Aktobe Generatsiya stated that they were working with potential equipment and energy resource suppliers, as well as addressing key technical and economic factors. The construction of the plant is expected to commence in 2025.[1][2]

Plant Details

Table 1: General Plant Details

Plant status Announced date Construction date Start date Power source
Announced[1] 2022[3] 2023[3] 2026[3] Captive gas-fired power plant[1]

Table 2: Ownership and Parent Company Information

Owner Owner company GEM ID
Aktobe Generatsiya LLC[4] E100001012067

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
crude; semi-finished[1] blooms[1] BF, BOF[1] 1 sinter plant; 1 BF; 2 BOFs[1]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
announced 665 TTPA[1][1] 665 TTPA[1][1]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
announced 728 TTPA[1] 728 TTPA[1]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter
1300 TTPA[1]

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Most recent relining
unknown announced[4] 2022[3][4] 2023[4] 2026-02[4] 800 m³[1] 728[1] unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 (PDF) https://web.archive.org/web/20240119094225/https://www.gov.kz/uploads/2023/1/4/1e32591c375b8c5d0b54ac60fdce5cf5_original.5251522.pdf. Archived from the original (PDF) on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. "В Казахстане вернулись к строительству уникального производства". LS. March 20, 2024. Retrieved October 2, 2024.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20221108102841/https://aktobetimes.kz/novosti/9189-jekspert-novyj-zavod-v-aktobe-mozhet-ostavit-ilek-bez-vody.html. Archived from the original on 08 November 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)