Aktobe Generatsiya steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Aktobe Generatsiya steel plant (Cталеплавильный завод ТОО «Актобе Генерация»), also known as Aktobe Generatsia steel plant, is a blast furnace-basic oxygen furnace (BF-BOF) announced steel plant in Aktobe, Kazakhstan.
Location
The map below shows the approximate location of the plant in Aktobe, Kazakhstan:
- Location: Aktobe, Kazakhstan
- Coordinates (WGS 84): 50.355117, 57.145119 (approximate)
Background
Construction of the plant was initially announced in 2022, but the project was delayed due to insufficient technical conditions for connecting to the gas pipeline network. In early 2024, it was reported that construction efforts had resumed. Aktobe Generatsiya stated that they were working with potential equipment and energy resource suppliers, as well as addressing key technical and economic factors. The construction of the plant is expected to commence in 2025.[1][2]
Plant Details
Table 1: General Plant Details
Plant status | Announced date | Construction date | Start date | Power source |
---|---|---|---|---|
Announced[1] | 2022[3] | 2023[3] | 2026[3] | Captive gas-fired power plant[1] |
Table 2: Ownership and Parent Company Information
Owner | Owner company GEM ID |
---|---|
Aktobe Generatsiya LLC[4] | E100001012067 |
Table 3: Process and Products
Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|
crude; semi-finished[1] | blooms[1] | BF, BOF[1] | 1 sinter plant; 1 BF; 2 BOFs[1] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
announced | 665 TTPA[1][1] | 665 TTPA[1][1] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
announced | 728 TTPA[1] | 728 TTPA[1] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter |
---|
1300 TTPA[1] |
Blast Furnace Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Most recent relining |
---|---|---|---|---|---|---|---|
unknown | announced[4] | 2022[3][4] | 2023[4] | 2026-02[4] | 800 m³[1] | 728[1] | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 (PDF) https://web.archive.org/web/20240119094225/https://www.gov.kz/uploads/2023/1/4/1e32591c375b8c5d0b54ac60fdce5cf5_original.5251522.pdf. Archived from the original (PDF) on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "В Казахстане вернулись к строительству уникального производства". LS. March 20, 2024. Retrieved October 2, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20221108102841/https://aktobetimes.kz/novosti/9189-jekspert-novyj-zavod-v-aktobe-mozhet-ostavit-ilek-bez-vody.html. Archived from the original on 08 November 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20231113194938/https://www.gov.kz/memleket/entities/aktobe-zher-paidalanuy/press/article/details/106958?lang=ru. Archived from the original on 13 November 2023.
{{cite web}}
: Missing or empty|title=
(help)
Resources