Al-Ezz Dekheila Steel Alexandria plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Al-Ezz Dekheila Steel Alexandria plant (Ezz Steel Alexandria, العز الدخيلة للصلب - الاسكندرية), also known as EZDK, is a steel plant in Alexandria, Egypt that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Alexandria, Egypt:

Loading map...
  • Location: Beside Bank Of Alexandria Al Ezz Dekheila Steel Co Building, Alexandria-Marsa Matroh Road, El-Dekheila, Al Ajami, Alexandria, 21537, Egypt
  • Coordinates (WGS 84): 31.123467, 29.80987 (exact)

Background

Al-Ezz Dekheila Steel plant in Alexandria (EZDK), is a subsidiary of Ezz Steel, one of the largest steel manufacturing facility in Egypt, with a total capacity of 3.2 million tons of finished steel products per annum, comprising 2.1 million tpa of long products (Rebar and Wire Rod) and 1.1 million tpa of Hot Rolled Coil. It is located in Dekheila, west of Alexandria, Egypt's second biggest city and its main port.[1]

Plant Details

Table 1: General Plant Details

Start date Workforce size
1986[2] 2000[3][4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Al Ezz Dekheila Steel Company Alexandria SAE [100.0%] 4295866236 [100.0%] E100000130693 [100.0%] Al Ezz Dekheila Steel Company Alexandria SAE [100%][5] 4295866236 E100000130693 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Main production equipment
semi-finished, finished rolled[6] rebar, wire, flat[6] 2018[7] 2021[7] DRI; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 3200[6] 3200[6]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
operating 2320[8] 2320[8]

Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production Total (all routes)
2019 unknown unknown
2020 unknown unknown
2021 2530[9] [9] 2530[9]
2022 unknown unknown

Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year DRI production Other/unknown iron production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown

Unit Details

Table 8: Direct Reduced Iron Furnace Details

Unit name Status Start date Furnace manufacturer and model Furnace type Current capacity (ttpa) Reductant
DRI Midrex 1 operating[6] 1986[10][11] Midrex Midrex[6][8] shaft furnace[8] 720[8] methane[6]
DRI Midrex 2 operating[6] 1997[10][11] Midrex Midrex[6][8] shaft furnace[8] 800[8] methane[6]
DRI Midrex 3 operating[6] 2000[10][11] Midrex Midrex[6][8] shaft furnace[8] 800[8] methane[6]

Table 9: Electric Arc Furnace Details

Unit name Status Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[6] 800[6] 80.0[12][6]
unknown EAF (2) operating[6] 800[6] 80.0[12][6]
unknown EAF (3) operating[6] 800[6] 80.0[12][6]
unknown EAF (4) operating[6] 800[6] 80.0[12][6]

Table 10: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI % sponge iron (unknown if DRI or HBI) % basic/merchant pig iron % granulated pig iron % pig iron (unknown if basic/merchant or granulated % other iron
unknown EAF (1) yes[6] 20.00[6] 80.00 unknown unknown unknown unknown unknown unknown
unknown EAF (2) yes[6] 20.00[6] 80.00 unknown unknown unknown unknown unknown unknown
unknown EAF (3) yes[6] 20.00[6] 80.00 unknown unknown unknown unknown unknown unknown
unknown EAF (4) yes[6] 20.00[6] 80.00 unknown unknown unknown unknown unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "EZDK AT A GLANCE". ezzsteel. Retrieved 09/26/2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. https://web.archive.org/web/20220809012422/https://www.ezzsteel.com/investor-relations/al-ezz-dekheila-steel-co-alexandria-s-a-e-ezdk. Archived from the original on 2022-08-09. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20230304235159/https://www.ezzsteel.com/. Archived from the original on 2023-03-04. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20220120170117/https://www.industrialenergyaccelerator.org/wp-content/uploads/REVISED-18-Nov-EnMS_case-study-021-1.pdf. Archived from the original (PDF) on 2022-01-20. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20220112160525/https://www.ezzsteel.com/about-ezz-steel. Archived from the original on 2022-01-12. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 6.24 6.25 6.26 6.27 6.28 6.29 6.30 6.31 6.32 https://web.archive.org/web/20220319000830/https://www.ezzsteel.com/ezz-steel-plants/alexandria-steelmaking-plant. Archived from the original on 2022-03-19. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20220127200901/https://www.ezzsteel.com/about-ezz-steel/quality-assured-steel/certifications. Archived from the original on 2022-01-27. {{cite web}}: Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 "2022 World Direct Reduction Statistics" (PDF). Midrex. 2023-09-12. Archived from the original (PDF) on 2023-11-03.
  9. 9.0 9.1 9.2 https://web.archive.org/web/20220610135713/https://dailynewsegypt.com/2022/06/09/ezz-steel-ranks-top-producer-in-africa-and-arab-region-in-2021/. Archived from the original on 2022-06-10. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 https://web.archive.org/web/20221006005834/http://www.ezzsteel.com/about-ezz-steel/growth-history. Archived from the original on 2022-10-06. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 https://web.archive.org/web/20240123002915/https://www.midrex.com/about-midrex/midrex-plants/. Archived from the original on 2024-01-23. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 https://web.archive.org/web/20220320173526/https://www.midrex.com/about-midrex/midrex-plants/. Archived from the original on 2022-03-20. {{cite web}}: Missing or empty |title= (help)

Resources