Al-Ezz Dekheila Steel Alexandria plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Al-Ezz Dekheila Steel Alexandria plant (العز الدخيلة للصلب - الاسكندرية (Arabic)), also known as EZDK, is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in Alexandria, Egypt.
Location
The map below shows the exact location of the plant in Alexandria, Egypt:
- Location: Beside Bank Of Alexandria Al Ezz Dekheila Steel Co Building, Alexandria-Marsa Matroh Road, El-Dekheila, Al Ajami, Alexandria, 21537, Egypt
- Coordinates (WGS 84): 31.123467, 29.809870 (exact)
Background
Al-Ezz Dekheila Steel plant in Alexandria (EZDK), is a subsidiary of Ezz Steel, one of the largest steel manufacturing facility in Egypt, with a total capacity of 3.2 million tons of finished steel products per annum, comprising 2.1 million tpa of long products (Rebar and Wire Rod) and 1.1 million tpa of Hot Rolled Coil. It is located in Dekheila, west of Alexandria, Egypt's second biggest city and its main port.[1]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size |
---|---|---|
Operating[2] | 1986[3] | 2000[4][5] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Al Ezz Dekheila Steel Company Alexandria SAE [100%] | 4295866236 [100%] | E100000130695 [64%] | Al Ezz Dekheila Steel Company Alexandria SAE[6] | 4295866236 | E100000130693 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
semi-finished; finished rolled[7] | rebar, wire, flat[7] | 2018[8] | 2021[8] | DRI, EAF[7] | 3 Midrex DRI plants (Midrex 1 (0.72 MTPA, began in 1986), Midrex 2 (0.8 MTPA, began in 1997), Midrex 3 (0.8 MTPA, began in 2000)); 4 EAF (4x80-tonne)[7][9] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 3200 TTPA[7][7][7][7] | 3200 TTPA[7][7][7][7] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|
operating | 2320 TTPA[10][10][10] | 2320 TTPA[10][10][10] |
Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF Production | Total (all routes) |
---|---|---|
2020 | – | – |
2021 | 2530 TTPA[11] | 2530 TTPA |
2022 | – | – |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "EZDK AT A GLANCE". ezzsteel. Retrieved 09/26/2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20220121151959/https://english.mubasher.info/markets/EGX/stocks/IRAX. Archived from the original on 21 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220809012422/https://www.ezzsteel.com/investor-relations/al-ezz-dekheila-steel-co-alexandria-s-a-e-ezdk. Archived from the original on 09 August 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220120170117/https://www.industrialenergyaccelerator.org/wp-content/uploads/REVISED-18-Nov-EnMS_case-study-021-1.pdf. Archived from the original (PDF) on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230304235159/https://www.ezzsteel.com/. Archived from the original on 04 March 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220112160525/https://www.ezzsteel.com/about-ezz-steel. Archived from the original on 12 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 https://web.archive.org/web/20220319000830/https://www.ezzsteel.com/ezz-steel-plants/alexandria-steelmaking-plant. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20220127200901/https://www.ezzsteel.com/about-ezz-steel/quality-assured-steel/certifications. Archived from the original on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220320173526/https://www.midrex.com/about-midrex/midrex-plants/. Archived from the original on 20 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 (PDF) https://web.archive.org/web/20231103031625/https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2022.pdf. Archived from the original (PDF) on 03 November 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220610135713/https://dailynewsegypt.com/2022/06/09/ezz-steel-ranks-top-producer-in-africa-and-arab-region-in-2021/. Archived from the original on 10 June 2022.
{{cite web}}
: Missing or empty|title=
(help)