Almaty-Bayserke-Talgar Gas Pipeline
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Almaty-Bayserke-Talgar Gas Pipeline (Russian: магистральный газопровод "Алматы-Байсерке-Талгар") is an operating gas pipeline in Kazakhstan.[1][2]
Location
The pipeline runs from the city of Almaty to Talgar, Almaty region, Kazakhstan.[1]
Project details
Almaty-Bayserke-Talgar I Gas Pipeline
- Operator: Intergas Central Asia[3]
- Owner: QazaqGaz[3]
- Parent company: Samruk-Kazyna SWF JSC[4]
- Capacity: 2.4 bcm/year[1]
- Length: 64.6 km[1]
- Diameter:
- Status: Operating[2]
- Construction year: 2010[1]
- Start year: 2014[1]
- Cost: USD 428 million[1]
- Financing:
- Associated infrastructure: Central Asia-China Gas Pipeline, Almaty-Taldykorgan Gas Pipeline
Almaty-Bayserke-Talgar II Gas Pipeline
- Operator: Intergas Central Asia[3][5]
- Owner: QazaqGaz[3]
- Parent company: Samruk-Kazyna SWF JSC[4]
- Capacity: 8.8 bcm/year[5]
- Length: 62.4km[5]
- Diameter: 530 mm[5]
- Status: Operating[5][6]
- Construction year: 2023[5]
- Start year: 2024[5]
- Cost: KZT 31 billion[7]
- Financing: QazaqGaz[7]
- Associated infrastructure: Central Asia-China Gas Pipeline, Almaty-Taldykorgan Gas Pipeline
Background
The investment project to construct the Almaty-Baiserke-Talgar I Gas Pipeline was implemented in 2014 in pursuance of the Presidential State-of-the-National Address to develop the gas infrastructure of the Almaty region.[1] Construction of the Almaty-Baiserke-Talgar II Gas Pipeline commenced in 2023 in accordance with an order of the president to convert the operating power stations of Almaty to gas.[2] The new pipeline will also allow to avoid emergency situations associated with the shutdown of the existing single-line gas pipeline. In addition, it is expected that the Almaty-Baiserke-Talgar II Gas Pipeline will allow to realize full-scale gas supply to Almaty city through the Talgar Gas Distribution Station as well as to carry out overhaul on the Almaty-Baiserke-Talgar I without stopping gas supply to the connected gas distribution stations.[2] Both segments will run parallel to each other.[8]
As of May 2024, 56.5 km of the pipeline have been built. The project is expected to be completed in September 2024. In addition to that, a connecting pipeline was built between the Almaty-Bayserke-Talgar and Central Asia-China (C) gas pipelines in 2023.[2]
In October 2024, QazaqGaz's board chair briefed the Kazakhstani head of state and noted the Almaty-Bayserke-Talgar II pipeline was completed.[6]
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "Almaty-Baiserke-Talgar gas pipeline has started working in Almaty Oblast in southern Kazakhstan, Tengrinews reports citing the regional Akimat (local authorities)". en.tengrinews.kz. October 28, 2014. Retrieved August 15, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 2.4 "Строительство магистрального газопровода в Казахстане. Вторая нитка - "Алматы - Байсерке - Талгар"". dzen.ru. January 11, 2024. Retrieved August 15, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 3.3 "About the company". Intergas Central Asia. Retrieved 2022-07-15.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 "National company QazaqGaz JSC (KZTG) - Kazakhstan Stock Exchange (KASE)". kase.kz (in русский). Retrieved 2022-07-15.
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 "СТРОИТЕЛЬСТВО 2-ОЙ НИТКИ МГ «АЛМАТЫ-БАЙСЕРКЕ-ТАЛГАР» ИДЕТ С ОПЕРЕЖЕНИЕМ СРОКА". intergas.kz. May 29, 2024. Retrieved August 15, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 6.0 6.1 "Kazakhstan's QazaqGaz Completes Major Gas Pipeline Projects | Pipeline Technology Journal". www.pipeline-journal.net. Retrieved 2024-10-31.
- ↑ 7.0 7.1 "В Казахстане реализуют газовые проекты на 100 млрд тенге Источник: https://lsm.kz/v-kazahstane-realizuyut-gazovye-proekty-na-106-mlrd-tenge © LS Все права защищены. При использовании материалов LS в любых целях, кроме личных, гиперссылка на web-site LSM.kz обязательна". lsm.kz. January 22, 2024. Retrieved August 15, 2024.
{{cite web}}
: External link in
(help); line feed character in|title=
|title=
at position 57 (help)CS1 maint: url-status (link) - ↑ "На газификацию Алматы выделили больше 15 млрд тенге". bes.media. November 3, 2023. Retrieved August 15, 2024.
{{cite web}}
: CS1 maint: url-status (link)