Almaty-Bayserke-Talgar Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Almaty-Bayserke-Talgar Gas Pipeline (Russian: магистральный газопровод "Алматы-Байсерке-Талгар") is an operating gas pipeline in Kazakhstan.[1][2]

Location

The pipeline runs from the city of Almaty to Talgar, Almaty region, Kazakhstan.[1]

Project details

Almaty-Bayserke-Talgar I Gas Pipeline

Almaty-Bayserke-Talgar II Gas Pipeline

Background

The investment project to construct the Almaty-Baiserke-Talgar I Gas Pipeline was implemented in 2014 in pursuance of the Presidential State-of-the-National Address to develop the gas infrastructure of the Almaty region.[1] Construction of the Almaty-Baiserke-Talgar II Gas Pipeline commenced in 2023 in accordance with an order of the president to convert the operating power stations of Almaty to gas.[2] The new pipeline will also allow to avoid emergency situations associated with the shutdown of the existing single-line gas pipeline. In addition, it is expected that the Almaty-Baiserke-Talgar II Gas Pipeline will allow to realize full-scale gas supply to Almaty city through the Talgar Gas Distribution Station as well as to carry out overhaul on the Almaty-Baiserke-Talgar I without stopping gas supply to the connected gas distribution stations.[2] Both segments will run parallel to each other.[7]

As of May 2024, 56.5 km of the pipeline have been built. The project is expected to be completed in September 2024. In addition to that, a connecting pipeline was built between the Almaty-Bayserke-Talgar and Central Asia-China (C) gas pipelines in 2023.[2]

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "Almaty-Baiserke-Talgar gas pipeline has started working in Almaty Oblast in southern Kazakhstan, Tengrinews reports citing the regional Akimat (local authorities)". en.tengrinews.kz. October 28, 2014. Retrieved August 15, 2024.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 "Строительство магистрального газопровода в Казахстане. Вторая нитка - "Алматы - Байсерке - Талгар"". dzen.ru. January 11, 2024. Retrieved August 15, 2024.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 3.3 "About the company". Intergas Central Asia. Retrieved 2022-07-15.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "National company QazaqGaz JSC (KZTG) - Kazakhstan Stock Exchange (KASE)". kase.kz (in русский). Retrieved 2022-07-15.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 "СТРОИТЕЛЬСТВО 2-ОЙ НИТКИ МГ «АЛМАТЫ-БАЙСЕРКЕ-ТАЛГАР» ИДЕТ С ОПЕРЕЖЕНИЕМ СРОКА". intergas.kz. May 29, 2024. Retrieved August 15, 2024.{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 "В Казахстане реализуют газовые проекты на 100 млрд тенге Источник: https://lsm.kz/v-kazahstane-realizuyut-gazovye-proekty-na-106-mlrd-tenge © LS Все права защищены. При использовании материалов LS в любых целях, кроме личных, гиперссылка на web-site LSM.kz обязательна". lsm.kz. January 22, 2024. Retrieved August 15, 2024. {{cite web}}: External link in |title= (help); line feed character in |title= at position 57 (help)CS1 maint: url-status (link)
  7. "На газификацию Алматы выделили больше 15 млрд тенге". bes.media. November 3, 2023. Retrieved August 15, 2024.{{cite web}}: CS1 maint: url-status (link)