Almaty-Taldykorgan Gas Pipeline
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Almaty-Taldykorgan Gas Pipeline (Russian: МГ Алматы-Талдыкорган, Kazakh: Алматы-Талдықорған МГҚ) is an operating gas pipeline in Kazakhstan.[1]
Location
The pipeline runs from Almaty to Taldykorgan, Almaty Region, Kazakhstan.[2]
Project details
- Operator: Intergas Central Asia[1]
- Owner: Qazaqgaz[3]
- Parent company: Samruk-Kazyna SWF JSC[4]
- Capacity:
- Length: 264 km[2]
- Diameter: 530 mm[5]
- Status: Operating[5]
- Start year: 2017[5]
- Cost: 20 billion KZT[6]
- Financing:
- Associated infrastructure: Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline, Taldykorgan-Usharal Gas Pipeline
Background
The construction of the Almaty-Taldykorgan gas pipeline and automatic gas distribution station was carried out on behalf of the Head of State and was under the personal control of the akim (governor) of the Almaty region.[2] The pipeline connects to the Central Asia-China Gas Pipeline (A, B, C) and the Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline.[7][8] In October 2022, President of Kazakhstan Kassym-Jomart Tokayev gave an order to build another segment of the pipeline to Usharal (Taldykorgan-Usharal Gas Pipeline) by 2025 in order provide residents of the Jetisu Region with gas.[9] The construction will begin in the second half of 2024.[10] Once built, the pipeline will become part of the Almaty-Taldykorgan gas transmission system.[11]
Articles and resources
References
- ↑ 1.0 1.1 "Общая информация". Intergas Central Asia. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 "Голубое топливо идет в Жетысу". kazpravda.kz (in русский). Retrieved 2022-07-19.
{{cite web}}
: zero width space character in|title=
at position 1 (help) - ↑ "About the company". Intergas Central Asia. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "National company QazaqGaz JSC (KZTG) - Kazakhstan Stock Exchange (KASE)". kase.kz (in русский). Retrieved 2022-07-19.
- ↑ 5.0 5.1 5.2 "Годовой отчет АО Интергаз Центральная Азия за 2020 год". Intergas Central Asia. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "В Алматинской области запущено строительство газопровода «Алматы-Талдыкорган»". KazTag. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Об утверждении Генеральной схемы газификации Республики Казахстан на 2023 – 2030 годы". adilet.zan.kz. September 29, 2023. Retrieved August 13, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "ДОСТУП И ДОСТУПНОСТЬ". livingasia.online. April 23, 2021. Retrieved August 13, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Построить газопровод «Талдыкорган – Ушарал» поручил Токаев". ВЛАСТЬ. Ocotber 20, 2022. Retrieved September 5, 2023.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ "Более 70 населенных пунктов подключат к газу в области Жетысу". el.kz. February 9, 2023. Retrieved September 5, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Объявление общественных слушаний в форме открытых собраний". OSCE. September 3, 2022. Retrieved September 5, 2023.
{{cite web}}
: CS1 maint: url-status (link)