Angang Group Xinyang Iron and Steel Co Ltd
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Angang Group Xinyang Iron and Steel Co Ltd (安钢集团信阳钢铁有限责任公司) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Xinyang, Henan, China.
Location
The map below shows the exact location of the plant in Xinyang, Henan, China:
- Location: No. 34 Xinmin Road, Minggang Town, Pingqiao District, Xinyang City, Henan Province
- Coordinates (WGS 84): 32.488704, 114.038243 (exact)
Background
According to the capacity replacement plan in April 2022, Angang Group Xinyang Iron and Steel Co., Ltd. plans to build one 1250m3 blast furnace and one 1220m3 blast furnace to replace the existing four 600-cubic-meter blast furnaces.[1]
One 600m3 ferromanganese furnace held an ignition and commissioning ceremony on Aug.22nd 2022.[2]
The 1250m3 blast furnace officially began production in January 2023, and two 600m3 blast furnaces were phased out.[3][4]
On June 14, 2024, the hot blast stoves for the blast furnace project of Angang Group Xinyang Iron & Steel Co., Ltd. were successfully ignited, marking the countdown to the project's commissioning.[5]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Retired date | Workforce size |
---|---|---|---|---|---|---|---|
Main plant | Operating[6] | – | – | 1970[7] | – | – | 4363[8] |
Expansion | Construction[9] | 2022-04-01[10] | 2023-07[11] | – | – | – | – |
Expansion | Announced[10] | 2022-04-01[10] | 2023-12-01[12] | 2024[10] | – | – | – |
Closure | Retired[13][10] | – | – | – | 2022-04[10] | 2023[13] | – |
Closure | Operating pre-retirement[10] | – | – | – | 2022-04[10] | 2024[10] | – |
Table 2: Ownership and Parent Company Information
Phase | State-owned entity status | Parent company | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | Partial | persons [65.2%]; Henan PROVINCE HENGCHANG Trading Co Ltd [15.8%]; other [10.4%]; Henan State Owned Capital Operation Group Co Ltd [8.6%] | E100000123261 [81.1%]; E100000001753 [10.4%]; E100000125490 [8.6%] | Angang Group Xinyang Iron and Steel Co., Ltd.[6] | 5000540428 | E100000127277 |
Table 3: Process and Products
Phase | Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
Main plant | finished rolled[14] | hot rolled ribbed rebar, shock-resistant rebar, slabs, billet, strip, round steel[14] | 2010-12-02 00:00:00[15][16] | 2018-08-10 00:00:00[15][16] | BF, BOF[17] | 3 BOF (3x100-tonne)[17] |
Expansion | finished rolled[14] | hot rolled ribbed rebar, shock-resistant rebar, slabs, billet, strip, round steel[14] | Yes[15] | Yes[15] | BF[18] | –[10] |
Expansion | finished rolled[14] | hot rolled ribbed rebar, shock-resistant rebar, slabs, billet, strip, round steel[14] | Yes[15] | Yes[15] | BF[18] | –[10] |
Closure | finished rolled[14] | hot rolled ribbed rebar, shock-resistant rebar, slabs, billet, strip, round steel[14] | Yes[15] | Yes[15] | BF[10] | –[10] |
Closure | finished rolled[14] | hot rolled ribbed rebar, shock-resistant rebar, slabs, billet, strip, round steel[14] | Yes[15] | Yes[15] | BF[10] | –[10] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | 3600 TTPA[15][15][15] | 3600 TTPA[15][15][15] |
Expansion | construction | – | – |
Expansion | announced | – | – |
Closure | retired | – | – |
Closure | operating pre-retirement | – | – |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 700 TTPA[10] | 700 TTPA[10] |
Expansion | construction | 1150 TTPA[10] | 1150 TTPA[10] |
Expansion | announced | 1138 TTPA[10] | 1138 TTPA[10] |
Closure | retired | 1400 TTPA[10][10] | 1400 TTPA[10][10] |
Closure | operating pre-retirement | 1400 TTPA[10][10] | 1400 TTPA[10][10] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Coke |
---|---|
Main plant | 600 TTPA[15] |
Expansion | – |
Expansion | – |
Closure | – |
Closure | – |
Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | 3652 TTPA[19] | 3652 TTPA[19] |
2021 | –[19] | –[19] |
2022 | –[20] | –[20] |
Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | 3301 TTPA[19] | 3301 TTPA[19] |
2021 | –[19] | –[19] |
2022 | – | – |
Blast Furnace Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
1 | retired[18] | unknown | unknown | unknown | 2023[11] | 600 m³[17] | 700[10] | unknown | unknown |
2 | retired[18] | unknown | unknown | unknown | 2023[11] | 600 m³[17] | 700[10] | unknown | unknown |
3 | operating pre-retirement[10] | unknown | unknown | unknown | 2024[10] | 600 m³[17] | 700[10] | unknown | unknown |
4 | operating pre-retirement[10] | unknown | unknown | unknown | 2024[10] | 600 m³[17] | 700[10] | unknown | unknown |
New 1 | operating[17] | unknown | unknown | 2022-08-22 00:00:00[18] | – | 600 m³[21] | 700[10] | unknown | unknown |
New 2 | construction[9] | 2022-04[10] | 2022-07-01 00:00:00[9] | unknown | – | 1250 m³[10] | 1150[10] | unknown | unknown |
unknown | announced[10] | 2022-04[10] | unknown | unknown | – | 1220 m³[10] | 1138[10] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "安钢集团信阳钢铁高炉建设项目产能置换方案公告",河南省工信厅,April 25, 2022
- ↑ "安钢集团信阳钢铁有限公司新1#高炉顺利点火投产". 中国网. 2022-9-13.
{{cite news}}
: Check date values in:|date=
(help) - ↑ "安钢集团信阳钢铁有限公司新1#高炉顺利点火投产 - 综合 - 中国网•东海资讯". jiangsu.china.com.cn. 2022-09-13. Retrieved 2022-12-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "信钢公司炼铁节能技改项目二期工程主体完工". 2024-01-16.
- ↑ "信阳钢铁炼铁高炉节能技改项目热风炉顺利烘炉". 中钢网. 2024-06-25.
- ↑ 6.0 6.1 https://www.qcc.com/firm/e35bd95d61a9adbc979340e258312822.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220113203353/http://www.xyisco.com/. Archived from the original on 13 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119065727/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 https://www.cet.com.cn/wzsy/kjzx/cygdzx/3492571.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 10.14 10.15 10.16 10.17 10.18 10.19 10.20 10.21 10.22 10.23 10.24 10.25 10.26 10.27 10.28 10.29 10.30 10.31 10.32 10.33 10.34 10.35 10.36 10.37 10.38 10.39 10.40 10.41 10.42 10.43 10.44 https://m.mysteel.com/22/0425/10/9F3B92FBB3E3AD7F_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 http://www.xyisco.com/company/554.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119035205/https://baijiahao.baidu.com/s?id=1729961569954000852&wfr=spider&for=pc. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 https://web.archive.org/web/20230913143535/http://admin.xyisco.com/company/554.html. Archived from the original on 13 September 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 14.8 14.9 https://web.archive.org/web/20220120021859/http://www.xyisco.com/catalog/. Archived from the original on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.00 15.01 15.02 15.03 15.04 15.05 15.06 15.07 15.08 15.09 15.10 15.11 15.12 15.13 15.14 15.15 15.16 https://web.archive.org/web/20220114143959/http://www.xyisco.com/about.html. Archived from the original on 14 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 https://web.archive.org/web/20240115063917/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%AE%89%E9%92%A2%E9%9B%86%E5%9B%A2%E4%BF%A1%E9%98%B3%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E8%B4%A3%E4%BB%BB%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 17.5 17.6 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 18.4 http://jiangsu.china.com.cn/html/finance/zh/11010407_1.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 19.5 19.6 19.7 https://web.archive.org/web/20231211195647/https://www.chyxx.com/shuju/202103/940747.html. Archived from the original on 11 December 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 https://web.archive.org/web/20230207211309/https://worldsteel.org/zh-hans/steel-topics/statistics/top-producers/. Archived from the original on 07 February 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230913143921/http://admin.xyisco.com/company/542.html. Archived from the original on 13 September 2023.
{{cite web}}
: Missing or empty|title=
(help)