Anhui Jingxian Longxin Iron and Steel Co Ltd (安徽省泾县隆鑫钢铁有限公司), also known as Jingxian Longxin Foundry Co., Ltd., is an electric arc furnace (EAF) steel plant operating in Xuancheng, Anhui, China.

Location

The map below shows the exact location of the plant in Xuancheng, Anhui, China:

Loading map...
  • Location: No. 1 Zhangjiawa Road, Jingxian Economic Development District, Xuancheng City, Anhui Province
  • Coordinates (WGS 84): 30.709058, 118.436638 (exact)

Background

According to the announcement of the production capacity replacement plan in April 2022, the company plans to build a new 70-tonne electric furnace to replace the existing 70-tonne electric furnace, which is planned to be put into operation in 2024.[1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Pre-retirement announcement date Retired date Workforce size Power source
Main plant Operating[2] 2008[3] 275[4] 5.9 MW roof photovoltaic power generation-Phase I[5][6]
Closure Operating pre-retirement[2] 2022-04-21[2] 2024[2] 5.9 MW roof photovoltaic power generation-Phase I[5][6]
Expansion Announced[2] 2022-04[2] 2023-08[7] 2024[2] 5.9 MW roof photovoltaic power generation-Phase I[5][6]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company GEM ID
Main plant Anhui Jingxian Longxin Iron and Steel Co Ltd [100%] E100000123261 [100%] Anhui Jingxian Longxin Iron and Steel Co., Ltd.[3] E100000126157

Table 3: Process and Products

Phase Steel product category Steel products ISO 50001 Main production equipment Detailed production equipment
Main plant finished rolled[8] rebar[8] 2022-04-08 00:00:00[9] EAF[2] 1 EAF (1x70-tonne)[7][2]
Closure finished rolled[8] rebar[8] EAF[2] 1 EAF (1x70-tonne)[7][2]
Expansion finished rolled[8] rebar[8] EAF[2] 1 EAF (1x70-tonne)[7][2]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating
Closure operating pre-retirement 500 TTPA[2] 500 TTPA[2]
Expansion announced 500 TTPA[2][10] 500 TTPA[2][10]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status*
Main plant operating
Closure operating pre-retirement
Expansion announced

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 安徽省泾县隆鑫钢铁70吨电炉升级改造项目产能置换方案公示,安徽省工业和信息化厅,April 21, 2022
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 https://news.mysteel.com/22/0421/15/717876735A48529B.html. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.qcc.com/firm/1069cf6f3af11861de75cced73ad072d.html. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20231002135129/http://cx.cnca.cn/CertECloud/result/skipDetail?rzjgId=CNCA-R-2002-044&certNumber=04421CX0008R0M&showtemp=1&etlId=&lot_number=0cb59a6f3bb24b109b023d2d86811ed7&pass_token=a7e947c364e98a5a62af2db6d8839fc465e51a5e84a71d8d6d61ba728cbbe67c&gen_time=1696254608&captcha_output=sDNe0yZW5lU3WYq1nI3vWDXQhOqKYeXmbiO4aSoDue88kkOBEzpNZHFMMrG37YzY95VGw1xiru0nyzUFBzD2CnUZAwNYa0qKcHNopMRPCXmgyxPnkf4yZn71LfDPLSGZd3HxYcNpUKYieik95dyiajGNVvEV6jLn6cfWhtjqOfDXMZXwhyPR0BZExRz97W-u3Qj_kTMKw-0CpcYS14OsIVgjMkbIEFmZKMzubsL0M0QJo4cwLE_vxSnHUzO5NzN7vtsYh5iSy71QNILgfnaaBw==. Archived from the original on 02 October 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20240115072134/https://fgw.xuancheng.gov.cn/News/show/1497039.html. Archived from the original on 15 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://www.xuancheng.gov.cn/OpennessContent/show/2776061.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 https://www.bdlanpeng.com/hangye/841.html. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 https://web.archive.org/web/20211017121017/https://www.ccn.com.cn/zt/wcrd2021/62143.html. Archived from the original on 17 October 2021. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20240119093101/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%AE%89%E5%BE%BD%E7%9C%81%E6%B3%BE%E5%8E%BF%E9%9A%86%E9%91%AB%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://www.ahjx.gov.cn/News/show/1446976.html. {{cite web}}: Missing or empty |title= (help)

Resources