Anhui Jingxian Longxin Iron and Steel Co Ltd
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Anhui Jingxian Longxin Iron and Steel Co Ltd (安徽省泾县隆鑫钢铁有限公司), also known as Jingxian Longxin Foundry Co., Ltd., is an electric arc furnace (EAF) steel plant operating in Xuancheng, Anhui, China.
Location
The map below shows the exact location of the plant in Xuancheng, Anhui, China:
- Location: No. 1 Zhangjiawa Road, Jingxian Economic Development District, Xuancheng City, Anhui Province
- Coordinates (WGS 84): 30.709058, 118.436638 (exact)
Background
According to the announcement of the production capacity replacement plan in April 2022, the company plans to build a new 70-tonne electric furnace to replace the existing 70-tonne electric furnace, which is planned to be put into operation in 2024.[1]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Retired date | Workforce size | Power source |
---|---|---|---|---|---|---|---|---|
Main plant | Operating[2] | – | – | 2008[3] | – | – | 275[4] | 5.9 MW roof photovoltaic power generation-Phase I[5][6] |
Closure | Operating pre-retirement[2] | – | – | – | 2022-04-21[2] | 2024[2] | – | 5.9 MW roof photovoltaic power generation-Phase I[5][6] |
Expansion | Announced[2] | 2022-04[2] | 2023-08[7] | 2024[2] | – | – | – | 5.9 MW roof photovoltaic power generation-Phase I[5][6] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | Anhui Jingxian Longxin Iron and Steel Co Ltd [100%] | E100000123261 [100%] | Anhui Jingxian Longxin Iron and Steel Co., Ltd.[3] | E100000126157 |
Table 3: Process and Products
Phase | Steel product category | Steel products | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
Main plant | finished rolled[8] | rebar[8] | 2022-04-08 00:00:00[9] | EAF[2] | 1 EAF (1x70-tonne)[7][2] |
Closure | finished rolled[8] | rebar[8] | – | EAF[2] | 1 EAF (1x70-tonne)[7][2] |
Expansion | finished rolled[8] | rebar[8] | – | EAF[2] | 1 EAF (1x70-tonne)[7][2] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Closure | operating pre-retirement | 500 TTPA[2] | 500 TTPA[2] |
Expansion | announced | 500 TTPA[2][10] | 500 TTPA[2][10] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* |
---|---|
Main plant | operating |
Closure | operating pre-retirement |
Expansion | announced |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 安徽省泾县隆鑫钢铁70吨电炉升级改造项目产能置换方案公示,安徽省工业和信息化厅,April 21, 2022
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 https://news.mysteel.com/22/0421/15/717876735A48529B.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.qcc.com/firm/1069cf6f3af11861de75cced73ad072d.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20231002135129/http://cx.cnca.cn/CertECloud/result/skipDetail?rzjgId=CNCA-R-2002-044&certNumber=04421CX0008R0M&showtemp=1&etlId=&lot_number=0cb59a6f3bb24b109b023d2d86811ed7&pass_token=a7e947c364e98a5a62af2db6d8839fc465e51a5e84a71d8d6d61ba728cbbe67c&gen_time=1696254608&captcha_output=sDNe0yZW5lU3WYq1nI3vWDXQhOqKYeXmbiO4aSoDue88kkOBEzpNZHFMMrG37YzY95VGw1xiru0nyzUFBzD2CnUZAwNYa0qKcHNopMRPCXmgyxPnkf4yZn71LfDPLSGZd3HxYcNpUKYieik95dyiajGNVvEV6jLn6cfWhtjqOfDXMZXwhyPR0BZExRz97W-u3Qj_kTMKw-0CpcYS14OsIVgjMkbIEFmZKMzubsL0M0QJo4cwLE_vxSnHUzO5NzN7vtsYh5iSy71QNILgfnaaBw==. Archived from the original on 02 October 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20240115072134/https://fgw.xuancheng.gov.cn/News/show/1497039.html. Archived from the original on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://www.xuancheng.gov.cn/OpennessContent/show/2776061.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 https://www.bdlanpeng.com/hangye/841.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 https://web.archive.org/web/20211017121017/https://www.ccn.com.cn/zt/wcrd2021/62143.html. Archived from the original on 17 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119093101/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%AE%89%E5%BE%BD%E7%9C%81%E6%B3%BE%E5%8E%BF%E9%9A%86%E9%91%AB%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://www.ahjx.gov.cn/News/show/1446976.html.
{{cite web}}
: Missing or empty|title=
(help)