ArcelorMittal Olaberria-Bergara (Olaberria) steel plant, also known as ArcelorMittal Gipuzkoa (Olaberria), is an electric arc furnace (EAF) steel plant operating in Olaberria, Gipuzkoa, Spain.
Location
The map below shows the exact location of the plant in Olaberria, Gipuzkoa, Spain:
- Location: Ctra. Madrid - Irún Km 417, 20212 Olaberria, Gipuzkoa, Spain
- Coordinates (WGS 84): 43.038290, -2.219625 (exact)
Background
ArcelorMittal Olaberria-Bergara operates two facilities, one located near Olaberria and one located near Bergara. The Bergara site is a rolling mill that has not produced steel since 2009 but continuous to process steel to create finished products[1][2]. The Olaberria site is tracked here.
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size |
---|---|---|
Operating[3] | 1992[4] | 500[5] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
ArcelorMittal SA [99.8%]; other [0.2%] | 5000030092 [99.8%]; unknown [0.2%] | E100001000348 [5%]; E100000001753 [0.2%] | Arcelormittal Olaberria-Bergara SL[3] | 4296799155 | E100001000509 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
semi-finished; finished rolled[6][7] | profiles; blanks; blooms; sections; billets[6][7] | automotive; building and infrastructure; tools and machinery; transport[3][7] | 2022[7] | 2022[7] | EAF[6] | 1 EAF (rebuilt in 2005 and 2019)[6][8][9] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1450 TTPA[3] | 1450 TTPA[3] |
Table 5: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF Production | Total (all routes) |
---|---|---|
2020 | 900 TTPA[10] | 900 TTPA |
2021 | 1100 TTPA[11] | 1100 TTPA |
2022 | 1000 TTPA[12] | 1000 TTPA |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "Olaberría". sections.arcelormittal.com. Retrieved 2023-10-16.
- ↑ "Bergara". sections.arcelormittal.com. Retrieved 2023-10-16.
- ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20240125041510/https://spain.arcelormittal.com/que-hacemos/productos-largos/olaberria-bergara/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220114002828/https://www.bloomberg.com/tosv2.html?vid. Archived from the original on 14 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111034246/https://www.diariovasco.com/economia/arcelormittal-erte-bergara-olaberria-20220404191345-nt.html. Archived from the original on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20211223071759/https://spain.arcelormittal.com/what-we-do/lce/gipuzkoa.aspx. Archived from the original on 23 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 https://web.archive.org/web/20220322202403/https://sections.arcelormittal.com/about_us/production_sites/Olaberria/EN. Archived from the original on 22 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220207220751/https://www.fastmarkets.com/insights/steel-industry-seeks-clarity-on-spanish-order-for-non-essential-production-shutdown. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220127004228/https://www.sarralle.com/en/news/view/sarralle-improves-the-consumption-and-efficiency-and-reduces-the-downtime-at-arcelormittal-olaberria-spain. Archived from the original on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220129220418/https://corporate-media.arcelormittal.com/media/kl3iewkk/fact-book-2020.pdf. Archived from the original (PDF) on 29 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://corporate.arcelormittal.com/media/3z1ozw5h/arcelor-mittal-fact-book-2021.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20231029182836/https://corporate.arcelormittal.com/media/pfwpkrrw/arcelor-mittal-fact-book-2022.pdf. Archived from the original (PDF) on 29 October 2023.
{{cite web}}
: Missing or empty|title=
(help)