ArcelorMittal Olaberria-Bergara (Olaberria) steel plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
ArcelorMittal Olaberria-Bergara (Olaberria) steel plant, also known as ArcelorMittal Gipuzkoa (Olaberria), is a steel plant in Olaberria, Gipuzkoa, Spain that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Olaberria, Gipuzkoa, Spain:
- Location: Ctra. Madrid - Irún Km 417, 20212 Olaberria, Gipuzkoa, Spain
- Coordinates (WGS 84): 43.03829, -2.219625 (exact)
Background
ArcelorMittal Olaberria-Bergara operates two facilities, one located near Olaberria and one located near Bergara. The Bergara site is a rolling mill that has not produced steel since 2009 but continuous to process steel to create finished products[1][2]. The Olaberria site is tracked here.
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
1992[3] | 500[4] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
ArcelorMittal SA; small shareholder(s) | 5000030092; not applicable | E100000000687; E100001015587 | Arcelormittal Olaberria-Bergara SL [100%][5] | 4296799155 | E100001000509 [100%] |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
---|---|---|---|---|---|---|
semi-finished, finished rolled[6][7] | sections, bloom, billet, blanks, profile[6][7] | automotive, building and infrastructure, tools and machinery, transport[6][5] | 2022-06-16[6] | 2022-06-21[6] | unknown[8] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1450[5] | 1450[5] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Total (all routes) |
---|---|---|
2019 | 1000[9] | 1000[9] |
2020 | 900[10] | 900[10] |
2021 | 1100[11] | 1100[11] |
2022 | 1000[12] | 1000[12] |
2023 | 1000[13] | 1000[13] |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Current capacity (ttpa) |
---|---|---|
unknown EAF (1) | operating[6] | 1450[5] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated | % other iron |
---|---|---|---|---|---|---|---|---|---|
unknown EAF (1) | yes[14] | 98.70[14] | unknown | unknown | unknown | unknown | unknown | unknown | 1.30[14] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Olaberría". sections.arcelormittal.com. Retrieved 2023-10-16.
- ↑ "Bergara". sections.arcelormittal.com. Retrieved 2023-10-16.
- ↑ https://web.archive.org/web/20220114002828/https://www.bloomberg.com/tosv2.html?vid. Archived from the original on 2022-01-14.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111034246/https://www.diariovasco.com/economia/arcelormittal-erte-bergara-olaberria-20220404191345-nt.html. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 "ArcelorMittal Olaberria - Bergara". Archived from the original on 2024-01-25. Retrieved 2023-06-28.
- ↑ 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20220322202403/https://sections.arcelormittal.com/about_us/production_sites/Olaberria/EN. Archived from the original on 2022-03-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20211223071759/https://spain.arcelormittal.com/what-we-do/lce/gipuzkoa.aspx. Archived from the original on 2021-12-23.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Issued and Ongoing Certifications". Responsible Steel. Archived from the original on 2022-03-19.
- ↑ 9.0 9.1 "Fact Book 2019" (PDF). ArcelorMittal. Archived from the original (PDF) on 2021-11-03.
- ↑ 10.0 10.1 (PDF) https://web.archive.org/web/20220129220418/https://corporate-media.arcelormittal.com/media/kl3iewkk/fact-book-2020.pdf. Archived from the original (PDF) on 2022-01-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 (PDF) https://corporate.arcelormittal.com/media/3z1ozw5h/arcelor-mittal-fact-book-2021.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 "Fact Book 2022" (PDF). ArcelorMittal. 2023-04-25. Archived from the original (PDF) on 2023-10-29.
- ↑ 13.0 13.1 (PDF) https://corporate.arcelormittal.com/media/zsmpkwx2/arcelormittal-factbook-2023-web_interactive_april-30th.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 (PDF) https://web.archive.org/web/20240905155030/https://sections.arcelormittal.com/repository2/Sections/6_69_Scrap%2520Content.pdf. Archived from the original (PDF) on 2024-09-05.
{{cite web}}
: Missing or empty|title=
(help)