ArcelorMittal Duisburg steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
ArcelorMittal Duisburg steel plant, also known as ArcelorMittal Ruhrort, ArcelorMittal Hochfeld GmbH, ISPAT Stahlwerk Ruhrort GmbH (predecessor), Mittal Steel Ruhrort GmbH (predecessor), ArcelorMittal Ruhrort GmbH (predecessor), is a basic oxygen furnace (BOF) steel plant operating in Duisburg, North Rhine-Westphalia, Germany.
Location
The map below shows the exact location of the plant in Duisburg, North Rhine-Westphalia, Germany:
- Location: Vohwinkelstrasse 107, 47137 Duisburg, Germany
- Coordinates (WGS 84): 51.462987, 6.744612 (exact)
Background
The Duisburg steel plant originally started production in 1854 and was operating 8 blast furnaces by 1912; the last of these shut down in 1993. [1]
The company has announced plans to transition from BOF to EAF steelmaking by 2030.[2][3]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Pre-retirement announcement date | Retired date | Workforce size | Power source |
---|---|---|---|---|---|---|---|
Main plant | Operating[4] | – | 1852[5] | – | – | 884[6] | WindSeeG project[7] |
Closure | Operating pre-retirement[8] | – | –[9] | 2021-10[8] | 2030[9] | – | – |
Expansion | Announced[9] | 2021-07[9] | 2030[9] | – | – | – | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | ArcelorMittal SA [100.0%] | 5000030092 [100%] | E100001000348 [5%] | Arcelormittal Duisburg GmbH[4] | 5040949378 | E100001000496 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|---|
Main plant | semi-finished; finished rolled[10] | wire rod, reinforcing bars, steel bars, forged products & semi-finished products[10] | automotive; tools and machinery[11] | 2022[12] | 2022[12] | BOF[10] | 2 BOF (2x140-tonne)[13][6][10] |
Closure | semi-finished; finished rolled[10] | wire rod, reinforcing bars, steel bars, forged products & semi-finished products[10] | automotive; tools and machinery[11] | – | – | BOF[10] | 2 BOF (2x140-tonne)[13][6][10] |
Expansion | semi-finished; finished rolled[10] | wire rod, reinforcing bars, steel bars, forged products & semi-finished products[10] | automotive; tools and machinery[11] | – | – | EAF[14] | 1 EAF[14][8][15] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|---|
Main plant | operating | – | – | – |
Closure | operating pre-retirement | 1300 TTPA[14][14] | – | 1300 TTPA[14][14] |
Expansion | announced | – | 1300 TTPA[14] | 1300 TTPA[14] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* |
---|---|
Main plant | operating |
Closure | operating pre-retirement |
Expansion | announced |
Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | 870 TTPA[6] | 870 TTPA |
2021 | 1000 TTPA[16] | 1000 TTPA |
2022 | 1000 TTPA[17] | 1000 TTPA |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "ArcelorMittal Ruhrort, Duisburg". Viktor Macha.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "The Road to Green Steel Hamburg and Duisburg". Youtube. July 7, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "New Capacity Roundup – October 2021 | Hellenic Shipping News Worldwide". www.hellenicshippingnews.com. Retrieved 2023-10-11.
- ↑ 4.0 4.1 https://web.archive.org/web/20211223070412/https://duisburg.arcelormittal.com/Ueber-uns/. Archived from the original on 23 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211223071139/https://duisburg.arcelormittal.com/icc/arcelor-duisburg-de/broker.jsp?uMen. Archived from the original on 23 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20211223070458/https://duisburg.arcelormittal.com/Ueber-uns/ArcelorMittal-Duisburg/. Archived from the original on 23 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220929002600/https://corporate.arcelormittal.com/media/news-articles/rwe-and-arcelormittal-intend-to-jointly-build-and-operate-offshore-wind-farms-and-hydrogen-facilities-for-low-emissions-steelmaking-1/. Archived from the original on 29 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20211108124045/https://www.hellenicshippingnews.com/new-capacity-roundup-october-2021/. Archived from the original on 08 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 https://web.archive.org/web/20210712221744/https://www.youtube.com/watch?v=EwEiR5epAX8. Archived from the original on 12 July 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 https://web.archive.org/web/20220922022154/https://barsandrods.arcelormittal.com/mills/duisburg. Archived from the original on 22 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 https://web.archive.org/web/20211223070433/https://duisburg.arcelormittal.com/Produkte/. Archived from the original on 23 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20240302055331/https://duisburg.arcelormittal.com/Nachhaltigkeit/Zertifikate/. Archived from the original on 02 March 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 13.0 13.1 https://web.archive.org/web/20210411124429/https://www.viktormacha.com/galerie/arcelormittal-ruhrort-duisburg-332/. Archived from the original on 11 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 https://www.kallanish.com/en/news/steel/market-reports/article-details/arcelormittal-duisburg-to-receive-eaf-for-sponge-iron-0921/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.youtube.com/watch?v=EwEiR5epAX8&ab_channel=ArcelorMittalGermany.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://corporate.arcelormittal.com/media/3z1ozw5h/arcelor-mittal-fact-book-2021.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20231029182836/https://corporate.arcelormittal.com/media/pfwpkrrw/arcelor-mittal-fact-book-2022.pdf. Archived from the original (PDF) on 29 October 2023.
{{cite web}}
: Missing or empty|title=
(help)