ArcelorMittal Duisburg steel plant, also known as ArcelorMittal Ruhrort, ArcelorMittal Hochfeld GmbH, ISPAT Stahlwerk Ruhrort GmbH (predecessor), Mittal Steel Ruhrort GmbH (predecessor), ArcelorMittal Ruhrort GmbH (predecessor), is a steel plant in Duisburg, North Rhine-Westphalia, Germany that operates basic oxygen furnace (BOF) and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Duisburg, North Rhine-Westphalia, Germany:
- Location: Vohwinkelstrasse 107, 47137 Duisburg, Germany
- Coordinates (WGS 84): 51.462987, 6.744612 (exact)
Background
The Duisburg steel plant originally started production in 1854 and was operating 8 blast furnaces by 1912; the last of these shut down in 1993. [1]
The company has announced plans to transition from BOF to EAF steelmaking by 2030.[2][3]
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source |
---|---|---|
1852[4] | 884[5] | WindSeeG project[6] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
ArcelorMittal SA | 5000030092 | E100000000687 | ArcelorMittal Duisburg GmbH[7] | 5040949378 | E100001000496 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
---|---|---|---|---|---|---|
semi-finished, finished rolled[8] | wire rod, forged, rebar, bar[8] | automotive, building and infrastructure, energy, tools and machinery[9] | 2022[10] | 2022[10] | 2024-03-15[11] | BOF; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
announced | – | 1300[12] | 1300[12] |
operating pre-retirement | 1300[12] | – | 1300[12] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF production | Total (all routes) |
---|---|---|
2019 | 860[5] | 860[5] |
2020 | 870[5] | 870[5] |
2021 | 1000[13] | 1000[13] |
2022 | 1000[14] | 1000[14] |
2023 | 1000[15] | 1000[15] |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Announced date | Start date | Current capacity (ttpa) |
---|---|---|---|---|
unknown EAF (1) | announced[16] | 2021-07 | 2030 | 1300[12] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI |
---|---|---|---|
unknown EAF (1) | yes[16] | >0[16] | >0[16] |
Table 8: Basic Oxygen Furnace Details
Unit name | Status | Current capacity (ttpa) | Current size |
---|---|---|---|
unknown BOF (1) | operating pre-retirement[12] | 650[12] | 140.0 tonnes[17][8][5] |
unknown BOF (2) | operating pre-retirement[12] | 650[12] | 140.0 tonnes[17][8][5] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "ArcelorMittal Ruhrort, Duisburg". Viktor Macha.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "The Road to Green Steel Hamburg and Duisburg". Youtube. July 7, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "New Capacity Roundup – October 2021 | Hellenic Shipping News Worldwide". www.hellenicshippingnews.com. Retrieved 2023-10-11.
- ↑ https://web.archive.org/web/20211223071139/https://duisburg.arcelormittal.com/icc/arcelor-duisburg-de/broker.jsp?uMen. Archived from the original on 2021-12-23.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 https://web.archive.org/web/20211223070458/https://duisburg.arcelormittal.com/Ueber-uns/ArcelorMittal-Duisburg/. Archived from the original on 2021-12-23.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220929002600/https://corporate.arcelormittal.com/media/news-articles/rwe-and-arcelormittal-intend-to-jointly-build-and-operate-offshore-wind-farms-and-hydrogen-facilities-for-low-emissions-steelmaking-1/. Archived from the original on 2022-09-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211223070412/https://duisburg.arcelormittal.com/Ueber-uns/. Archived from the original on 2021-12-23.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 https://web.archive.org/web/20220922022154/https://barsandrods.arcelormittal.com/mills/duisburg. Archived from the original on 2022-09-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://barsandrods.arcelormittal.com/mill-duisburg.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://web.archive.org/web/20240302055331/https://duisburg.arcelormittal.com/Nachhaltigkeit/Zertifikate/. Archived from the original on 2024-03-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.responsiblesteel.org/issued-certificates-and-ongoing-audits.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 https://www.kallanish.com/en/news/steel/market-reports/article-details/arcelormittal-duisburg-to-receive-eaf-for-sponge-iron-0921/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 (PDF) https://corporate.arcelormittal.com/media/3z1ozw5h/arcelor-mittal-fact-book-2021.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 "Fact Book 2022" (PDF). ArcelorMittal. 2023-04-25. Archived from the original (PDF) on 2023-10-29.
- ↑ 15.0 15.1 "Fact Book 2023" (PDF). ArcelorMittal. 2024-04-22. Archived from the original (PDF) on 2024-06-10.
- ↑ 16.0 16.1 16.2 16.3 https://web.archive.org/web/20240906190540/https://accounts.google.com/v3/signin/identifier?continue=https%253A%252F%252Fwww.youtube.com%252Fsignin%253Faction_handle_signin%253Dtrue%2526app%253Ddesktop%2526hl%253Den%2526next%253D%25252Fsignin_passive%2526feature%253Dpassive&hl=en&ifkv=Ab5oB3q8F8wHzMXDdtg1KXkv69eU4VO1a11OTjMzLZr_9yEYGaT2t0uR0apHyXLJkG9-CXfcD4eG&passive=true&service=youtube&uilel=3&flowName=GlifWebSignIn&flowEntry=ServiceLogin&dsh=S-536572537%253A1725649540217394&ddm=0. Archived from the original on 2024-09-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 https://web.archive.org/web/20210411124429/https://www.viktormacha.com/galerie/arcelormittal-ruhrort-duisburg-332/. Archived from the original on 2021-04-11.
{{cite web}}
: Missing or empty|title=
(help)