ArcelorMittal Pecém steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
ArcelorMittal Pecém steel plant (CSP - Companhia Siderúrgica do Pecém (Portuguese)), also known as CSP Pecém steel plant (predecessor);, is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in São Gonçalo do Amarante, Ceará, Brazil.
Location
The map below shows the exact location of the plant in São Gonçalo do Amarante, Ceará, Brazil:
- Location: Rod CE 155, Km 11.5, Pecém, São Gonçalo do Amarante, CE 62674-000, Brazil
- Coordinates (WGS 84): -3.585917, -38.858932 (exact)
Background
Originally founded as Companhia Siderúrgica do Pecém, the CSP plant is Brazil's most modern integrated steel plant and the first in the country's Northeast region. Occupying a 571-hectare site at the Pecém Industrial and Port Complex (CIPP) in the Brazilian state of Ceará, it specializes in the production and export of high quality rolled steel products for the naval, oil & gas, automotive, and construction industries.[1]
CSP was founded in 2008 as a joint venture between Brazilian mining and logistics company Vale (NYSE: VALE) and the South Korean companies Dongkuk Steel and Posco (NYSE: PKX). Steel production at the plant started in July 2016.[1]
In March 2023, international steel giant ArcelorMittal purchased the CSP plant for approximately US $2.2 billion.[2]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size | Power source |
---|---|---|---|
Operating[3] | 2016[4] | 2600[5][6][7] | onsite 218MW gas-fired power plant[8][9] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
ArcelorMittal SA [97.1%]; other [2.9%] | 5000030092 [97.1%]; unknown [2.9%] | E100001000348 [4.9%]; E100000001753 [2.9%] | Arcelormittal Brasil SA[10][11][12] | 4295859712 | E100001000493 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
semi-finished; finished rolled[13] | slabs, plates, rolled steel[4][14][13] | automotive; building and infrastructure; energy; transport[4] | 2023[15] | BF, BOF[16][17] | 1 coking plant (240 ovens, 2016); 1 sinter plant (450m3, 2016); 2 BOF (300-tonne, 2016)[14][18] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 3000 TTPA[19][10][20][21][22][16] | 3000 TTPA[19][10][20][21][22][16] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
operating | 3191 TTPA[23] | 3191 TTPA[23] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke |
---|---|
4747 TTPA[24] | 1130 TTPA[24] |
Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | 2743 TTPA[13] | 2743 TTPA[13] |
2021 | 2811 TTPA[17] | 2811 TTPA[17] |
2022 | 2794 TTPA[25] | 2794 TTPA[25] |
Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | 2779 TTPA[26] | 2779 TTPA[26] |
2021 | 2860 TTPA[27] | 2860 TTPA[27] |
2022 | 2781 TTPA[24] | 2781 TTPA[24] |
Blast Furnace Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
1 | operating[10] | unknown | 2022-07[28] | 2016-06[22][29][23] | POSCO[28] | 3800 m³[30] | 3191[23] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Our History – CSP". CSP. Retrieved 2020-07-31.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "ArcelorMittal completes acquisition of CSP in Brazil". ArcelorMittal. March 9, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20220124211857/http://www.cspecem.com/en/. Archived from the original on 24 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20211211142440/http://www.cspecem.com/en/about-us/your-history/. Archived from the original on 11 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119083554/https://conexaomineral.com.br/noticia/2815/csp-e-vendida-para-a-arcelormittal.html. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20190929134438/http://www.oestadoce.com.br:80/cadernos/oev/csp-investe-mais-de-30-milhoes-para-minimizar-impactos-ambientais. Archived from the original on 29 September 2019.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119083415/https://diariodonordeste.verdesmares.com.br/negocios/geracao-de-vagas-tende-a-crescer-1.1709623. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220127020053/https://www.cspecem.com/pt-br/2017/07/termeletrica-da-csp-ja-gerou-1-150-000-mwh/. Archived from the original on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125145834/https://diariodonordeste.verdesmares.com.br/negocios/termeletrica-da-siderurgica-entra-em-operacao-1.1634642. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 https://web.archive.org/web/20220929175059/https://corporate.arcelormittal.com/media/press-releases/arcelormittal-agrees-acquisition-of-csp-in-brazil/. Archived from the original on 29 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230120045745/https://www.steelorbis.com/steel-news/latest-news/brazil-approves-arcelormittals-acquisition-of-csp-for-22-billion-1275005.htm. Archived from the original on 20 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125145846/https://corporate.arcelormittal.com/media/press-releases/arcelormittal-completes-acquisition-of-csp-in-brazil. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 (PDF) https://web.archive.org/web/20220120225956/https://acobrasil.org.br/site/wp-content/uploads/2021/06/Mini_anuario_2021_AcoBrasil-1.pdf. Archived from the original (PDF) on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 (PDF) https://web.archive.org/web/20220119142707/https://www.alacero.org/sites/default/files/revista/pagina/al562_nuevas_plantas_latinoamericanas.pdf. Archived from the original (PDF) on 19 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211228200937/https://brasil.arcelormittal.com/certificados-politicas/. Archived from the original on 28 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 https://web.archive.org/web/20221126120359/https://www.cspecem.com/pt-br/sobre-a-csp/processo-de-producao-do-aco/. Archived from the original on 26 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 (PDF) https://web.archive.org/web/20220625100836/https://acobrasil.org.br/site/wp-content/uploads/2022/05/AcoBrasil_Mini_anuario_2022.pdf. Archived from the original (PDF) on 25 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220319200315/http://www.cspecem.com/en/about-us/steel-productive-process/. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 https://web.archive.org/web/20240110014039/http://www.aecipp.com.br/pt-br/associados/arcelormittal-pecem. Archived from the original on 10 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 https://web.archive.org/web/20220813190714/https://www.cspecem.com/en/about-us/steel-productive-process/.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 21.0 21.1 https://web.archive.org/web/20240110013934/https://www.primetals.com/press-media/news/brazilian-customer-csp-to-improve-safety-and-plant-performance-with-new-relining-machine-from-primetals-technologies?setLang=1&cHash=4558261501e8eb846a46751abbcb473d. Archived from the original on 10 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 22.2 https://web.archive.org/web/20220811030808/https://www.cspecem.com/pt-br/sobre-a-csp/nossa-historia/. Archived from the original on 11 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 23.2 23.3 https://web.archive.org/web/20180605105217/https://abmproceedings.com.br/ptbr/article/inicio-e-estabilizacao-da-operacao-do-alto-forno-1-da-csp. Archived from the original on 05 June 2018.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 24.0 24.1 24.2 24.3 (PDF) https://web.archive.org/web/20230810145552/https://acobrasil.org.br/site/wp-content/uploads/2023/07/AcoBrasil_Anuario_2023.pdf. Archived from the original (PDF) on 10 August 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 25.0 25.1 (PDF) https://web.archive.org/web/20240119051040/https://acobrasil.org.br/site/wp-content/uploads/2023/06/AcoBrasil_Minianuario_2023.pdf. Archived from the original (PDF) on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 26.0 26.1 (PDF) https://web.archive.org/web/20220120203349/https://acobrasil.org.br/site/wp-content/uploads/2021/07/Anuario_Completo_2021.pdf. Archived from the original (PDF) on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 27.0 27.1 (PDF) https://web.archive.org/web/20220722190457/https://acobrasil.org.br/site/wp-content/uploads/2022/07/AcoBrasil_Anuario_2022.pdf. Archived from the original (PDF) on 22 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 28.0 28.1 https://www.yumpu.com/en/document/read/13753841/steel-plant.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210727110107/https://g1.globo.com/ceara/noticia/siderurgica-do-pecem-celebra-inicio-oficial-das-operacoes-no-ceara.ghtml. Archived from the original on 27 July 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.noticiasdemineracao.com/produ%C3%A7%C3%A3o/news/1133929/sider%C3%BArgica-da-vale-cear%C3%A1-come%C3%A7a-opera%C3%A7%C3%B5es-alto-forno.
{{cite web}}
: Missing or empty|title=
(help)