Arvand Kaveh Steel Khoramshahr plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Arvand Kaveh Steel Khoramshahr plant, also known as Arvand Kaveh Steel Company, is a direct reduced iron-electric arc furnace (DRI-EAF) announced steel plant in Khorramshahr, Khuzestan, Iran.

Location

The map below shows the exact location of the plant in Khorramshahr, Khuzestan, Iran:

Loading map...
  • Location: Khorramshar, Khuzestan, Iran
  • Coordinates (WGS 84): 30.505458, 48.272024 (exact)

Plant Details

Table 1: Ownership and Parent Company Information

Owner Owner company GEM ID
Arvand Kaveh Steel[1] E100000131103

Table 2: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
crude; semi-finished; finished rolled[2] billets; rolled products; DRI[2] DRI, EAF[2] DRI plant; EAF (# unknown)[3]

Table 3: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
announced 2500 TTPA[4] 2500 TTPA[4]

Table 4: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
announced 1700 TTPA[2] 1700 TTPA[2]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://web.archive.org/web/20220111173338/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf. Archived from the original (PDF) on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240125062845/https://www.middleeastmetals.ir/en/news/1662/arvand-kaveh-steel%E2%80%99s-1st-phase-to-go-on-stream. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://www.middleeastmetals.ir/en/news/1662/arvand-kaveh-steel%E2%80%99s-1st-phase-to-go-on-streamm. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2023.pdf. {{cite web}}: Missing or empty |title= (help)

Resources