Astara–Kazi Magomed Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Astara–Kazi Magomed Pipeline is a gas pipeline in Azerbaijan.
Location
The pipeline runs from Astara, Azerbaijan, to Hajigabul (renamed Kazi Magomed), Azerbaijan.
Project Details
- Operator:
- Parent company: SOCAR
- Current capacity:
- Length: 207 kilometers
- Status: Operating
- Start Year:
Background
The pipeline is 207 kilometers, has 1,000 and 1,200mm pipeline diameter, a pressure (MPa) of 5.4, and two threads.[1]
Articles and resources
References
- ↑ Projects of gas transport facilities VTG, accessed October 28, 2019