Bafgh Mineral Complex Iron & Steel Yazd plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Bafgh Mineral Complex Iron & Steel Yazd plant, also known as B-MISCO; Bafaq Steel, is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in Bafgh, Yazd, Iran.

Location

The map below shows the exact location of the plant in Bafgh, Yazd, Iran:

Loading map...
  • Location: MCXR+V27, Bafq, Yazd Province, Iran
  • Coordinates (WGS 84): 31.699307, 55.440187 (exact)

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size
Operating[1] 2013[2] 1000[1]

Table 2: Ownership and Parent Company Information

Owner Owner company GEM ID
Bafgh Mineral Complex Iron & Steel Company (B-MISCO)[3] E100000131106

Table 3: Process and Products

Steel product category Steel products ISO 14001 Main production equipment Detailed production equipment
crude; semi-finished; finished rolled[4] billet; rebar; sections; coil; DRI; pellet[4] 2022[5] DRI, EAF[6] pelletizing unit; 1 EAF; 1 DRI plant, rebar rolling unit[6]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1200 TTPA[7] 1200 TTPA[7]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
operating 800 TTPA[7] 800 TTPA[7]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Pellets
5000 TTPA[1]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20220602001300/http://www.bmisco.com/. Archived from the original on 02 June 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240302073959/https://bmisco.com/our-story/. Archived from the original on 02 March 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20220111173338/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf. Archived from the original (PDF) on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240119052942/https://bmisco.com/%D9%85%D8%AD%D8%B5%D9%88%D9%84%D8%A7%D8%AA-%D9%81%D9%88%D9%84%D8%A7%D8%AF-%D8%A8%D8%A7%D9%81%D9%82-%DB%8C%D8%B2%D8%AF-3/. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20230113094458/https://bmisco.com/%d9%85%d9%88%d9%81%d9%82%db%8c%d8%aa-%d9%85%d9%85%db%8c%d8%b2%db%8c-%d9%85%d8%b1%d8%a7%d9%82%d8%a8%d8%aa%db%8c-%d9%81%d9%88%d9%84%d8%a7%d8%af-%d8%a8%d8%a7%d9%81%d9%82/. Archived from the original on 13 January 2023. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20230201195502/https://bmisco.com/%D9%88%D8%A7%D8%AD%D8%AF%D9%87%D8%A7%DB%8C-%D8%AA%D9%88%D9%84%DB%8C%D8%AF%DB%8C/. Archived from the original on 01 February 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 https://bmisco.com/about-us-2/. {{cite web}}: Missing or empty |title= (help)

Resources