Baicheng Fuda Bar Rolling Co Ltd
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Baicheng Fuda Bar Rolling Co Ltd (白城市富达棒材轧制有限公司) is an electric arc furnace (EAF) steel plant operating in Baicheng, Jilin, China.
Location
The map below shows the exact location of the plant in Baicheng, Jilin, China:
- Location: Zhujiang Road, Baicheng Industrial Park, Jilin Province
- Coordinates (WGS 84): 45.593303, 122.895588 (exact)
Background
According to the announcement of capacity replacement, the company plans to build a 105-ton electric furnace, which is expected to be put into operation in December 2022, and two 40-ton electric furnaces will be eliminated at the same time.[1]
The company was fined 50,000 RMB for failing to promptly disclose information related to solid waste pollution prevention and environmental protection concerning the solid waste it generated.[2]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Retired date | Workforce size | Power source |
---|---|---|---|---|---|---|---|---|
Main plant | Operating[3] | – | – | 2009[3] | – | – | 32[3] | State Power Investment Corporation Jilin Longhua Baicheng Combined Heat and Power Plant.[4] |
Closure | Retired[5] | – | – | – | 2021-12[6] | 2022-10[5] | – | State Power Investment Corporation Jilin Longhua Baicheng Combined Heat and Power Plant.[4] |
Expansion | Construction[5] | 2021-12[6] | 2022-10[5] | – | – | – | – | State Power Investment Corporation Jilin Longhua Baicheng Combined Heat and Power Plant.[4] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | Baicheng Fuda Bar Rolling Co Ltd [100%] | E100000123261 [100%] | Baicheng Fuda Bar Rolling Co., Ltd.[3] | E100000127199 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|---|
Main plant | finished rolled[3] | bar[3] | EAF[6] | 2 EAF (2x40-tonne)[6] |
Closure | finished rolled[3] | bar[3] | EAF[6] | 2 EAF (2x40-tonne)[6] |
Expansion | finished rolled[3] | bar[3] | EAF[6] | 1 EAF (1x105-tonne)[6] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Closure | retired | 800 TTPA[6][6] | 800 TTPA[6][6] |
Expansion | construction | 788 TTPA[6] | 788 TTPA[6] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* |
---|---|
Main plant | operating |
Closure | retired |
Expansion | construction |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 白城市富达棒材轧制有限公司钢铁产能置换方案公告,吉林省工业信息化厅,December 3, 2021
- ↑ "白城市生态环境局行政处罚决定书(白环罚字〔2022〕1号)". 白城市生态环境局. 2022-07-29.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 https://www.qcc.com/firm/87f40239ca1fac04192706cf350a5908.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20231127202951/https://news.bjx.com.cn/html/20170623/832911.shtml. Archived from the original on 27 November 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://mp.weixin.qq.com/s?__biz=MzI1MzM1MDcwMQ==&mid=2247712853&idx=1&sn=253b2b5e174b01bb6986b6062eed1697&chksm=e9d80617deaf8f01b744c1d1852b584be6c60af6f4845221110741077db080c93383793ed322&scene=27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 https://factory.mysteel.com/21/1203/13/326B7411A0FAF1A6.html.
{{cite web}}
: Missing or empty|title=
(help)