Bangkok Steel Industry Samut Prakan plant, also known as BSI steel plant, is a steel plant in Bangyapraek, Samut Prakan, Thailand that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Bangyapraek, Samut Prakan, Thailand:

Loading map...
  • Location: 27 Moo 10 Soi Klubcharoen, Poochaosamingprai Road, Bangyapraek, Phrapradaeng, Samut Prakan 10130, Thailand
  • Coordinates (WGS 84): 13.647672, 100.553882 (exact)

Background

Bangkok Steel Industry Company Limited was established on December 17, 1964, and started operations with manufacture of round and deformed concrete steel bars. The first electric arc furnace was installed in 1973.[1]

Plant Details

Table 1: General Plant Details

Start date Power source
1973[2] unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Bangkok Steel Industry PCL 4295892729 E100000130747 Bangkok Steel Industry PCL[2] 4295892729 E100000130747

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
finished rolled[3] galvanized, bar, nails, galvanized wire[3] building and infrastructure[3] no[4] no[4] unknown EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 600[5] 600[5]

Table 5: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown

Unit Details

Table 7: Electric Arc Furnace Details

Unit name Status Start date Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[5] 1973[2] 300[5] 25.0[5][2]
unknown EAF (2) operating[5] 300[5] 25.0[5][2]

Table 8: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown EAF (1) yes[5] 100.00[5]
unknown EAF (2) yes[5] 100.00[5]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "About". Bangkok Steel. Retrieved 15 November, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240125055307/http://www.bangkoksteel.co.th/global/en/about.html. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240111031116/http://www.bangkoksteel.co.th/global/en/index.html. Archived from the original on 2024-01-11. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20220318222525/http://www.bangkoksteel.co.th/global/en/src/roundsteel/roundsteel_standards_iso.html. Archived from the original on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 https://web.archive.org/web/20241008163223/http://www.bangkoksteel.co.th/global/en/src/roundsteel/roundsteel_process_BSI&RSM.html. Archived from the original on 2024-10-08. {{cite web}}: Missing or empty |title= (help)

Resources