Birdsboro Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Birdsboro Pipeline is an operating gas pipeline in Pennsylvania, USA.[1]
Location
The pipeline is located in Berks County, Pennsylvania[2] and runs from Oley, Pennsylvania, USA to Birdsboro, Pennsylvania, USA.[3][4]
Project Details
- Operator: DTE Midstream Appalachia, LLC[5]
- Owner: Birdsboro Power[1]
- Parent Company: Ares Management[6]
- Capacity: 79 million cubic feet per day[7][5]
- Length: 21.2 kilometers / 13.2 miles[5]
- Diameter: 12-inches[5]
- Cost: US$47,000,000[5]
- Status: Operating[5]
- Start Year: 2018[5]
Background
The pipeline extends from the Birdsboro Facility to Oley Township, Pennsylvania. The pipeline supplies gas from an interconnection with the Texas Eastern Transmission LP mainline to a 485 MW gas-fired power generation facility in Birdsboro, Pennsylvania.[2][5][8]
The prefiling before the U.S. Federal Energy Regulatory Commission (FERC) was initiated in October 2016.[9] Construction started in May of 2018,[1] and the pipeline began operations later in 2018.[5]
Articles and resources
References
- ↑ 1.0 1.1 1.2 Planned Pipelines, Pipeline News, accessed October 2018
- ↑ 2.0 2.1 "Birdsboro Pipeline". DT Midstream. Retrieved 03 September, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ Construction Begins for 14-Mile Pipe to Feed Berks Gas-Fired Plant, Marcellus Drilling, accessed October 2018
- ↑ National Energy and Petrochemical Map , FracTracker, February 28, 2020
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 Natural Gas Data, Pipeline Projects Energy Information Agency, September 03, 2023
- ↑ "Birdsboro". NAES. Retrieved 03 September, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ Birdsboro FAQ, DTE Midstream, Feb. 2, 2019
- ↑ "DTE Energy Birdsboro Pipeline Project" (PDF). DTE Energy. Retrieved 03 September, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Birdsboro Pipeline Project Q&A" (PDF). DTE Energy. Retrieved 03 September, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link)