CSN Stahlwerk Thüringen Unterwellenborn steel plant
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
CSN Stahlwerk Thüringen Unterwellenborn steel plant, also known as CSN Stahlwerk Thueringen, is a steel plant in Unterwellenborn, Thuringia, Germany that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Unterwellenborn, Thuringia, Germany:
- Location: Kronacher Straße 6, 07333 Unterwellenborn, Germany
- Coordinates (WGS 84): 50.654574, 11.43745 (exact)
Background
The CSN Stahlwerk Thüringen Unterwellenborn steel plant started operations originally in 1878 with 2 blast furnaces and a Bessemer steel plant.[1] They have since evolved and switched to scrap-based electric steelmaking.[2] The plant was acquired by the CSN Group in February 2012 and have operated under the company since; though initially a state-owned group, CSN privatized in 1993.[3]
Worker Safety
In November 2022, workers began a strike over working hours and wages at the plant.[4] In March 2023, an employee died in an accident at the rolling mill.[5]
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
1878[6] | 700[7][8] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Companhia Siderúrgica Nacional SA | 4297320527 | E100001000652 | Stahlwerk Thueringen GmbH[9] | 4296860384 | E100000130808 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|---|---|---|
semi-finished, finished rolled[10] | billet, sections[10] | building and infrastructure[10] | 2024[11] | 2024[11] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1100[12] | 1100[12] |
Table 5: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter | Coke | Pellets |
---|---|---|---|
0[13] | 0[13] | 0[13] | 0[13] |
Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown | unknown |
2022 | unknown | unknown |
2023 | unknown | – |
Unit Details
Table 7: Electric Arc Furnace Details
Unit name | Status | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|
unknown EAF (1) | operating[13] | 1100[12] | 135.0[14] |
Table 8: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated | % other iron |
---|---|---|---|---|---|---|---|---|---|
unknown EAF (1) | yes[15] | 100.00[15] | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "History". STAHLWERK Thüringen GmbH.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Production Process". Stahlwerk Thueringen.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "CSN - Gruppe". STAHLWERK Thüringen GmbH (in Deutsch). Retrieved 2023-05-04.
- ↑ Süddeutsche.de GmbH, Munich, Germany. "Aktuelle Nachrichten, Hintergründe und Kommentare - SZ.de". Süddeutsche.de (in Deutsch). Retrieved 2023-04-26.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ Voigt, Jens (March 9, 2023). ""We are still in shock": 23-year-old dies after an accident at work in the Thuringia steel mill". Thuringische Landeszeitung.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20220529093047/https://www.stahlwerk-thueringen.com/company/swt/history/. Archived from the original on 2022-05-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220205123753/https://www.stahlwerk-thueringen.com/files/14B93364590/nachhaltigkeit_englisch.pdf?randID. Archived from the original (PDF) on 2022-02-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220529075157/https://www.stahlwerk-thueringen.com/company/. Archived from the original on 2022-05-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125060202/https://www.stahlwerk-thueringen.com/company/swt/csn_group/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 https://web.archive.org/web/20220319151744/https://www.stahlwerk-thueringen.com/products/. Archived from the original on 2022-03-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://www.stahlwerk-thueringen.com/company/responsibility/managementsystem/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 "Map of EU steel production sites" (PDF). Eurofer. Archived from the original (PDF) on 2022-03-18.
- ↑ 13.0 13.1 13.2 13.3 13.4 https://web.archive.org/web/20210122134418/https://www.stahlwerk-thueringen.com/company/production_process/productionprocess/. Archived from the original on 2021-01-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220124102936/https://www.stahlwerk-thueringen.com/company/production_process/productionprocess/?loopID. Archived from the original on 2022-01-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://web.archive.org/web/20240809182730/https://www.stahlwerk-thueringen.com/company/production_process/productionprocess/?loopID=14B93365D08. Archived from the original on 2024-08-09.
{{cite web}}
: Missing or empty|title=
(help)