Camiri-Villamontes Oil Pipeline
From Global Energy Monitor
Camiri-Villamontes Oil Pipeline (also known as OCY-2) is an operating oil pipeline in Bolivia.[1]
Location
The pipeline runs between YPFB's Chorety pumping station in Camiri, Bolivia and the company's logistics hub in Villamontes, Bolivia.
Project Details
- Operator: YPFB Transporte SA[1]
- Parent company: Yacimientos Petrolíferos Fiscales Bolivianos (YPFB) 98.55%, Others 1.44%[2]
- Capacity: 11,000 bpd[3][4]
- Length: 164 km[4]
- Diameter: 6.625 inches[4]
- Status: Operating[1]
- Start Year: 1979[4]
- Cost:
- Financing:
Articles and resources
References
- ↑ 1.0 1.1 1.2 "Sistemas de Transporte de Hidrocarburos Líquidos - YPFB Transporte". YPFB Transporte. Retrieved 2023-03-15.
- ↑ "¿Quiénes Somos? - YPFB Transporte". YPFB Transporte. Retrieved 2023-03-15.
- ↑ "Información Operativa del Sistema de Transporte de Hidrocarburos Líquidos por Ductos" (PDF). YPFB Transporte SA. April 25, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 4.2 4.3 "Bolivia Red de Oleoductos" (PDF). Oil Production. June 2005.
{{cite web}}
: CS1 maint: url-status (link)