Celsa Barcelona Castellbisbal steel plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Celsa Barcelona Castellbisbal steel plant is a steel plant in Castellbisbal, Barcelona, Spain that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Castellbisbal, Barcelona, Spain:
- Location: Celsa Barcelona, Carrer de la Ferralla, 12, Pol. Ind. San Vicente 08755 Castellbisbal, Barcelona, Spain
- Coordinates (WGS 84): 41.454855, 1.980107 (exact)
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
1957[1] | 850[2] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Anchorage Capital Advisors LP; Anchorage Capital Group LLC; Attestor Services Ltd; Deutsche Bank AG; GoldenTree Asset Management LP; Midwood Holdings LLC | 5087215566; 5000008410; 5061209241; 4295869482; 5000034523; 5064670557 | E100002003621; E100002003627; E100002003626; E100000136992; E100002003622; E100002003624 | Compania Espanola de Laminacion SL[1] | 5000020443 | E100000130908 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
---|---|---|---|---|---|---|
semi-finished, finished rolled[1] | square, rod, wire, sections[1] | automotive, building and infrastructure, tools and machinery, transport[3] | 2022-03-15[4] | 2023-02-11[4] | unknown[5] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 2500[6][1] | 2500[6][1] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Total (all routes) |
---|---|---|
2019 | 2035[7] | 2035[7] |
2020 | 1724[7] | 1724[7] |
2021 | 2118[8] | 2118[8] |
2022 | 1443[9] | 1443[9] |
2023 | 1534[10] | 1534[10] |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Start date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|
unknown EAF (1) | operating[10][1] | 1977[11] | 1250[1] | 140.0[1] |
unknown EAF (2) | operating[12] | – | 1250[6] | 140.0[13] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[14] | 100.00[15] |
unknown EAF (2) | yes[14] | 100.00[15] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "Celsa Barcelona - Comprometidos con el medio ambiente". Celsa Barcelona. Archived from the original on 2022-01-12.
- ↑ https://www.elnacional.cat/oneconomia/es/empresas/850-trabajadores-celsa-barcelona-pactan-alza-salarial-57-y-prolongar-erte_980991_102.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Productos". Celsa Barcelona. Archived from the original on 2024-08-06.
- ↑ 4.0 4.1 https://www.celsabarcelona.com/certificaciones/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.responsiblesteel.org/issued-certificates-and-ongoing-audits.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://web.archive.org/web/20221206212743/https://www.celsagroup.com/en/about-us/companies/. Archived from the original on 2022-12-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 (PDF) https://www.celsagroup.com/wp-content/uploads/2023/07/barna-steel-einf-2020.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 "CELSA Group recovers pre-pandemic production with more than 6.5 Mt of steel produced in its European steel mills". CELSA Group. 2022-02-25. Archived from the original on 2022-07-07.
- ↑ 9.0 9.1 (PDF) https://www.celsagroup.com/wp-content/uploads/2023/07/barna-steel-einf-2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 (PDF) https://www.celsagroup.com/wp-content/uploads/2024/10/memoria_celsa_2023_es.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://globalsteelwire.com/wp-content/uploads/2024/11/gsw_declaracionambiental_2023_final.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240916191555/https://www.celsabarcelona.com/conocenos/. Archived from the original on 2024-09-16.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220318114832/http://www.celsabarcelona.com/Celsa.mvc/Presentacion. Archived from the original on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 (PDF). 2021-12-31 https://web.archive.org/web/20240119094459/https://www.celsagroup.com/wp-content/uploads/2023/07/sustainability-report-2021.pdf. Archived from the original (PDF) on 2024-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://web.archive.org/web/20240809200559/https://api.environdec.com/api/v1/EPDLibrary/Files/3dfeefb1-9eee-4322-8187-08dbb657dbae/Data. Archived from the original on 2024-08-09.
{{cite web}}
: Missing or empty|title=
(help)
Resources