Celsa Barcelona Castellbisbal steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Celsa Barcelona Castellbisbal steel plant is a steel plant in Castellbisbal, Barcelona, Spain that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Castellbisbal, Barcelona, Spain:

Loading map...
  • Location: Celsa Barcelona, Carrer de la Ferralla, 12, Pol. Ind. San Vicente 08755 Castellbisbal, Barcelona, Spain
  • Coordinates (WGS 84): 41.454855, 1.980107 (exact)

Plant Details

Table 1: General Plant Details

Start date Workforce size
1957[1] 850[2]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Anchorage Capital Advisors LP; Anchorage Capital Group LLC; Attestor Services Ltd; Deutsche Bank AG; GoldenTree Asset Management LP; Midwood Holdings LLC 5087215566; 5000008410; 5061209241; 4295869482; 5000034523; 5064670557 E100002003621; E100002003627; E100002003626; E100000136992; E100002003622; E100002003624 Compania Espanola de Laminacion SL[1] 5000020443 E100000130908

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[1] square, rod, wire, sections[1] automotive, building and infrastructure, tools and machinery, transport[3] 2022-03-15[4] 2023-02-11[4] unknown[5] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 2500[6][1] 2500[6][1]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Total (all routes)
2019 2035[7] 2035[7]
2020 1724[7] 1724[7]
2021 2118[8] 2118[8]
2022 1443[9] 1443[9]
2023 1534[10] 1534[10]

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Start date Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[10][1] 1977[11] 1250[1] 140.0[1]
unknown EAF (2) operating[12] 1250[6] 140.0[13]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown EAF (1) yes[14] 100.00[15]
unknown EAF (2) yes[14] 100.00[15]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "Celsa Barcelona - Comprometidos con el medio ambiente". Celsa Barcelona. Archived from the original on 2022-01-12.
  2. https://www.elnacional.cat/oneconomia/es/empresas/850-trabajadores-celsa-barcelona-pactan-alza-salarial-57-y-prolongar-erte_980991_102.html. {{cite web}}: Missing or empty |title= (help)
  3. "Productos". Celsa Barcelona. Archived from the original on 2024-08-06.
  4. 4.0 4.1 https://www.celsabarcelona.com/certificaciones/. {{cite web}}: Missing or empty |title= (help)
  5. https://www.responsiblesteel.org/issued-certificates-and-ongoing-audits. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20221206212743/https://www.celsagroup.com/en/about-us/companies/. Archived from the original on 2022-12-06. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 (PDF) https://www.celsagroup.com/wp-content/uploads/2023/07/barna-steel-einf-2020.pdf. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 "CELSA Group recovers pre-pandemic production with more than 6.5 Mt of steel produced in its European steel mills". CELSA Group. 2022-02-25. Archived from the original on 2022-07-07.
  9. 9.0 9.1 (PDF) https://www.celsagroup.com/wp-content/uploads/2023/07/barna-steel-einf-2022.pdf. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 (PDF) https://www.celsagroup.com/wp-content/uploads/2024/10/memoria_celsa_2023_es.pdf. {{cite web}}: Missing or empty |title= (help)
  11. (PDF) https://globalsteelwire.com/wp-content/uploads/2024/11/gsw_declaracionambiental_2023_final.pdf. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20240916191555/https://www.celsabarcelona.com/conocenos/. Archived from the original on 2024-09-16. {{cite web}}: Missing or empty |title= (help)
  13. https://web.archive.org/web/20220318114832/http://www.celsabarcelona.com/Celsa.mvc/Presentacion. Archived from the original on 2022-03-18. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 (PDF). 2021-12-31 https://web.archive.org/web/20240119094459/https://www.celsagroup.com/wp-content/uploads/2023/07/sustainability-report-2021.pdf. Archived from the original (PDF) on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 https://web.archive.org/web/20240809200559/https://api.environdec.com/api/v1/EPDLibrary/Files/3dfeefb1-9eee-4322-8187-08dbb657dbae/Data. Archived from the original on 2024-08-09. {{cite web}}: Missing or empty |title= (help)

Resources