Celsa France Boucau steel plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Celsa France Boucau steel plant, also known as Acierie de l'Atlantique, Celsa France Bayonne, is a steel plant in Boucau, Nouvelle-Aquitaine, France that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Boucau, Nouvelle-Aquitaine, France:
- Location: Celsa France, Rond Point Claudius Magnin, F-64340, Boucau, France
- Coordinates (WGS 84): 43.529693, -1.500971 (exact)
Background
Steel production at Celsa France is scrap-based.[1]
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
1965[2] | 265[3] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Anchorage Capital Advisors LP; Anchorage Capital Group LLC; Attestor Services Ltd; Deutsche Bank AG; GoldenTree Asset Management LP; Midwood Holdings LLC | 5087215566; 5000008410; 5061209241; 4295869482; 5000034523; 5064670557 | E100002003621; E100002003627; E100002003626; E100000136992; E100002003622; E100002003624 | Celsa France SAS[4] | 4296807624 | E100001010273 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment |
---|---|---|---|---|
semi-finished, finished rolled[5] | billet, rolled[6] | automotive, building and infrastructure, energy, transport[7] | unknown[8] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1200[9] | 1200[9] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production | Total (all routes) |
---|---|---|---|
2019 | unknown | unknown | – |
2020 | unknown | unknown | – |
2021 | 625[10] | –[10] | 625[10] |
2022 | unknown | unknown | – |
2023 | 549[11] | –[11] | 549[11] |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Start date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|
unknown EAF (1) | operating[3] | 1996[12] | 1200[9] | 150.0[13][14] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[15] | 100.00[16] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ Preamble, Celsa Group, Retrieved on: Jul. 16, 2020
- ↑ https://web.archive.org/web/20211219211718/http://celsafrance.com/Celsa.mvc/Historique. Archived from the original on 2021-12-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240111012658/https://www.celsagroup.com/en/executive-report-interactive/. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220318121654/http://www.celsafrance.com/. Archived from the original on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://www.celsafrance.com/?appIdioma=en.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111031811/https://www.celsafrance.com/. Archived from the original on 2024-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220118064725/https://www.celsagroup.com/en/about-us/figures/. Archived from the original on 2022-01-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20211202212140/http://celsafrance.com/Pdf/fr/Certificat%2014001_2019.pdf. Archived from the original (PDF) on 2021-12-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 "Map of EU steel production sites" (PDF). Eurofer. Archived from the original (PDF) on 2022-03-18.
- ↑ 10.0 10.1 10.2 "CELSA Group recovers pre-pandemic production with more than 6.5 Mt of steel produced in its European steel mills". CELSA Group. 2022-02-25. Archived from the original on 2022-07-07.
- ↑ 11.0 11.1 11.2 (PDF) https://celsanordic.com/wp-content/uploads/2024/10/memoria_celsa_2023_completa-01102024-final_en-eg.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.a3ms.fr/en/adherent/celsa-france.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220930165028/https://eurometal.net/celsa-invests-further-into-french-plant/. Archived from the original on 2022-09-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220318100437/http://www.celsafrance.com/Productos.mvc/Modedefabrication?. Archived from the original on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF). 2021-12-31 https://web.archive.org/web/20240119094459/https://www.celsagroup.com/wp-content/uploads/2023/07/sustainability-report-2021.pdf. Archived from the original (PDF) on 2024-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240809200559/https://api.environdec.com/api/v1/EPDLibrary/Files/3dfeefb1-9eee-4322-8187-08dbb657dbae/Data. Archived from the original on 2024-08-09.
{{cite web}}
: Missing or empty|title=
(help)