Celsa Global Steel Wire Santander plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Celsa Global Steel Wire Santander plant is a steel plant in Santander, Cantabria, Spain that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Santander, Cantabria, Spain:
- Location: Poligono Industrial Nueva Montana S/N, 39011 Santander, Cantabria, Spain
- Coordinates (WGS 84): 43.445344, -3.839228 (exact)
Plant Details
Table 1: General Plant Details
Start date | Workforce size |
---|---|
1899[1] | 650[2] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Anchorage Capital Advisors LP; Anchorage Capital Group LLC; Attestor Services Ltd; Deutsche Bank AG; GoldenTree Asset Management LP; Midwood Holdings LLC | 5087215566; 5000008410; 5061209241; 4295869482; 5000034523; 5064670557 | E100002003621; E100002003627; E100002003626; E100000136992; E100002003622; E100002003624 | Global Steel Wire SA [100%][3] | 4295889463 | E100000130742 [100%] |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
---|---|---|---|---|---|---|
finished rolled[2] | wire rod, sections, bar[4] | automotive, building and infrastructure, energy, tools and machinery, transport[5] | 2022-12-23[6] | 2022-11-18[6] | unknown[7] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 750[8] | 750[8] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Total (all routes) |
---|---|---|
2019 | 611[9] | 611[9] |
2020 | 517[9] | 517[9] |
2021 | 635[10] | 635[10] |
2022 | 433[11] | 433[11] |
2023 | 460[12] | 460[12] |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Current capacity (ttpa) |
---|---|---|
unknown EAF (1) | operating[12][3] | 750[8] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[13][14] | 100.00[15] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240115060925/https://www.eldiariomontanes.es/economia/evolucion-siderurgia-20221115184650-nt.html?ref=https:%2F%2Fwww.google.com%2F. Archived from the original on 2024-01-15.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 "Global Steel Wire" (PDF). Celsa Group. 2021-06-30. Archived from the original (PDF) on 2022-05-18.
- ↑ 3.0 3.1 "Web oficial de Global Steel Wire". Global Steel Wire. Archived from the original on 2022-10-16. Retrieved 2024-05-22.
- ↑ "Proceso de fabricación GSW™". Global Steel WireGSW™. Archived from the original on 2024-08-06.
- ↑ "Sectors". GSW™ - Global Steel Wire™. Archived from the original on 2022-10-03.
- ↑ 6.0 6.1 "GSW™ Certifications". Global Steel Wire™. Archived from the original on 2022-10-03.
- ↑ "Issued and Ongoing Certifications". Responsible Steel. Archived from the original on 2022-03-19.
- ↑ 8.0 8.1 8.2 "Map of EU steel production sites" (PDF). Eurofer. Archived from the original (PDF) on 2022-03-18.
- ↑ 9.0 9.1 9.2 9.3 (PDF) https://www.celsagroup.com/wp-content/uploads/2023/07/barna-steel-einf-2020.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 "CELSA Group recovers pre-pandemic production with more than 6.5 Mt of steel produced in its European steel mills". CELSA Group. 2022-02-25. Archived from the original on 2022-07-07.
- ↑ 11.0 11.1 (PDF) https://www.celsagroup.com/wp-content/uploads/2023/07/barna-steel-einf-2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 (PDF) https://www.celsagroup.com/wp-content/uploads/2024/10/memoria_celsa_2023_es.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF). 2021-12-31 https://web.archive.org/web/20240119094459/https://www.celsagroup.com/wp-content/uploads/2023/07/sustainability-report-2021.pdf. Archived from the original (PDF) on 2024-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://globalsteelwire.com/wp-content/uploads/2024/11/gsw_declaracionambiental_2023_final.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240809200559/https://api.environdec.com/api/v1/EPDLibrary/Files/3dfeefb1-9eee-4322-8187-08dbb657dbae/Data. Archived from the original on 2024-08-09.
{{cite web}}
: Missing or empty|title=
(help)
Resources