Celsa Nordic Mo i Rana steel plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Celsa Nordic Mo i Rana steel plant, also known as Celsa Armeringsstål, is an electric arc furnace (EAF) steel plant operating in Verkstedløypa, Mo i Rana, Norway.

Location

The map below shows the exact location of the plant in Verkstedløypa, Mo i Rana, Norway:

Loading map...
  • Location: Mo Industrial Park, Verkstedløypa, 8626 Mo i Rana, Norway
  • Coordinates (WGS 84): 66.311519, 14.167557 (exact)

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size Power source
Operating[1] 1946[2] 344[3] Primarily hydropower[1]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Compania Espanola de Laminacion SL [100.0%] 5000020443 [100%] E100000130908 [100%] Celsa Nordic AS[4] 5044708038 E100000131023

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
semi-finished; finished rolled[5] billet; reinforcement steel; wire rod[5][6] building and infrastructure; energy; transport[7] yes[8] EAF[8] EAF (125-tonne Tenova Consteel built in 2007; unknown if other units)[8][9]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 770 TTPA[2] 770 TTPA[2]

Table 5: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year EAF Production Total (all routes)
2020
2021 538 TTPA[10] 538 TTPA
2022 700 TTPA[2] 700 TTPA

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20220119175222/https://celsanordic.com/. Archived from the original on 19 January 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://celsanordic.com/facts-figures/. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20231202081923/http://www.statkraft.com/newsroom/news-and-stories/2022/green-steel/. Archived from the original on 02 December 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://celsanordic.com/celsa-nordic/. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20230609113434/https://celsanordic.com/products/. Archived from the original on 09 June 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20220205095840/https://celsa-steelservice.no/. Archived from the original on 05 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. https://web.archive.org/web/20230320092141/https://celsanordic.com/sectors/. Archived from the original on 20 March 2023. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 (PDF) https://web.archive.org/web/20231208134500/https://celsanordic.com/wp-content/uploads/2023/10/celsa-nordic-sustainability-report-2022.pdf. Archived from the original (PDF) on 08 December 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. https://abmproceedings.com.br/en/article/download-pdf/os-recentes-projetos-consteel-e-as-perspectivas-de-carregamento-contnuo-de-sucata-e-gusa-lquido-no-fea-para-a-siderurgia-brasileira. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20220707041138/https://www.celsagroup.com/en/news-posts/celsa-group-recovers-pre-pandemic-production-with-more-than-6-5-mt-of-steel-produced-in-its-european-steel-mills/. Archived from the original on 07 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Resources