Century Steel Khyber plant is a steel plant in Nowshera, Khyber Pakhtunkhwa, Pakistan that operates steelmaking and ironmaking technology.

Location

The map below shows the approximate location of the plant in Nowshera, Khyber Pakhtunkhwa, Pakistan:

Loading map...
  • Location: Plot No 07-A, Rashakai, Special Economic Zone, Nowshera, Pakistan
  • Coordinates (WGS 84): 34.124213, 72.019181 (approximate)

Background

Fuzhou Julitaihe International Company of China is building the Century Steel Ltd plant in the Rashakai Special Economic Zone, Pakistan. The plant is expected to have a capacity of 1.5 mtpa and is being constructed in three phases with with the first phase expected to be operational in 2023 with an initial capacity of 500 ttpa.[1] The first phase was inaugurated in July 2023.[2] Over US $30 million out of the US $82 million invested in the project's first phase was already underway, but the project was facing multiple hurdles and delays.[3]

In November 2024, in a letter, Century Steel Group CEO Li Chunjian stated the company had reached the decision to wrap up its business and withdraw investment from the country as the government departments, responsible for handling foreign direct investment (FDI) in the China Pakistan Economic Corridor (CPEC) Rashakai Special Economic Zone (RSEZ) in Khyber Pakhtunkhwa, failed to resolve multitude of their problems.[4][5]

Plant Details

Table 1: General Plant Details

Announced date Construction date Workforce size Power source
2021[6] 2023-07[7][8] 1000[9] 160 MW captive power plant[8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Jincheng Industry Development Pte Ltd unknown E100000131200 Century Steel Pte Ltd[10] 5073704634 E100000131188

Table 3: Process and Products

Steel product category Steel products Main production equipment
finished rolled[11] tube, beam, plate, bar[12] Iron other/unspecified; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
announced 1000[8] 1000[8]
construction 500[13][8] 500[13][8]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Other/unspecified iron capacity Nominal iron capacity (total)
construction 0[12] 0[12]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Unit Details

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Century Steel Plant construction at RSEZ in full swing". www.gwadarpro.pk. Retrieved 2023-10-30.
  2. "Chinese steel company awarded for remarkable achievement in Rashakai Special Economic Zone - Gwadar Today". web.archive.org. 2024-07-18. Retrieved 2025-01-14.
  3. "China's Century Steel Group warns to dismantle plant, withdraw investment". www.geo.tv. Retrieved 2025-01-14.
  4. "Chinese steel giant sends "last notice" to Pakistan to address concerns, threatens to shut down operations". ANI. 2024-11-23. Retrieved 2025-01-14.
  5. "China's Century Steel Group warns to dismantle plant, withdraw investment". www.geo.tv. Retrieved 2025-01-14.
  6. https://www.dawn.com/news/1601766. {{cite web}}: Missing or empty |title= (help)
  7. https://www.gwadartoday.pk/chinese-steel-company-awarded-for-remarkable-achievement-in-rashakai-special-economic-zone/. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 https://web.archive.org/web/20220925041730/https://gwadarpro.pk/1566234038289035266/century-steel-plant-construction-at-rsez-in-full-swing. Archived from the original on 2022-09-25. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20211118183653/http://cpecinfo.com/chinese-company-century-steel-to-provide-pakistan-with-15mn-tons-of-steel/. Archived from the original on 2021-11-18. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20240125063350/http://centurysteel.pk/about-us. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20220123041440/https://tribune.com.pk/story/2340026/steel-unit-to-start-production-at-rashakai-sez-soon. Archived from the original on 2022-01-23. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 https://web.archive.org/web/20221002091557/http://centurysteel.pk/steel-services. Archived from the original on 2022-10-02. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)

Resources