Chizhou Guichi Guihang Metal Products Co Ltd (池州市贵池区贵航金属制品有限公司) is an electric arc furnace (EAF) steel plant operating in Chizhou, Anhui, China.
Location
The map below shows the exact location of the plant in Chizhou, Anhui, China:
- Location: Guichi Qianjiang Industrial Park, Chizhou City, Anhui Province
- Coordinates (WGS 84): 30.532786, 117.251660 (exact)
Background
Chizhou Guichi District Guihang Metal Products Co., Ltd., as a steel factory, has a 90t electric furnace.[1] The company has an annual production capacity of 1 million tons of steelmaking, 1 million tons of steel rolling and 0.15 million tons of deep-processing special steel.[2]
In March 2014, the Anhui Environmental Protection Department announced the illegal production and excessive sewage discharge of Chizhou Guichi District Guihang Metal Products Co., Ltd., and asked the local environmental protection department to order it to stop production and rectify.[3]
According to the project capacity replacement plan announcement in January 2023, a 1×130ton electric arc furnace and 2×130ton ladle furnace are planned to be constructed, with a scheduled start date in 2023, and 1×90t electric arc furnaces and 1×90t ladle furnace will be retired before the start of production.[4]
The company completed its pre-commissioning assessment at the end of May 2024, and the public announcement showed that one 90-ton electric furnace that should be withdrawn had been dismantled, which did not involve the addition of new steelmaking capacity. The new main smelting equipment is a 130-ton electric furnace. The construction location, quantity and specification model of the electric furnace are consistent with the capacity replacement program and the content of the project filing.[5]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Retired date | Workforce size | Power source |
---|---|---|---|---|---|---|---|---|
Main plant | Operating[6] | – | – | 2000[7] | – | – | 247[8][9] | State Grid Chizhou City Guichi District Power Supply Company[10] |
Expansion | Announced[11] | 2023-01-18[11] | 2023-06[11] | 2024[11] | – | – | – | State Grid Chizhou City Guichi District Power Supply Company[10] |
Closure | Operating pre-retirement[6] | – | – | – | 2023-01[12] | 2024-06[12] | – | State Grid Chizhou City Guichi District Power Supply Company[10] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | Chizhou Guichi Guihang Metal Products Co Ltd [100%] | E100000123261 [100%] | Chizhou Guichi Guihang Metal Products Co., Ltd.[13] | E100000127077 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|---|
Main plant | finished rolled[14] | Special Steel, High Strength Seismic Construction Steel[14] | building and infrastructure[14] | 2014-04-11 00:00:00[15] | 2022-04-22 00:00:00[15] | EAF[16] | 1 EAF (1x90-tonne) 1LF(1x90-tonne)[16] |
Expansion | finished rolled[14] | Special Steel, High Strength Seismic Construction Steel[14] | building and infrastructure[14] | – | – | EAF[17] | 1 EAF (1x130-tonne) 2LF(2x130-tonne)[17] |
Closure | finished rolled[14] | Special Steel, High Strength Seismic Construction Steel[14] | building and infrastructure[14] | – | – | EAF[16] | 1 EAF (1x90-tonne) 1LF(1x90-tonne)[16] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Expansion | announced | 1000 TTPA[11] | 1000 TTPA[11] |
Closure | operating pre-retirement | 1000 TTPA[14] | 1000 TTPA[14] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* |
---|---|
Main plant | operating |
Expansion | announced |
Closure | operating pre-retirement |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 工信部:符合《钢铁行业规范条件》企业名单(第六批)公告, 工业和信息化部, 2022-12-01
- ↑ 产业发展,在奔跑中转型, 安青网, 2019-08-09
- ↑ 安徽省环保厅叫停淮化等三个“带污”项目, 安徽日报, 2014-03-28
- ↑ "关于池州市贵池区贵航金属制品有限公司130吨电炉项目产能置换方案的公示". 安徽省经济和信息化厅. 2023-01-18.
- ↑ Sina (2024-05-30). "Chizhou Guihang Metal Short Process Electric Furnace Steel Capacity Replacement Project Equipment Pre-commissioning Assessment Public Notice". Sina.
- ↑ 6.0 6.1 https://www.miit.gov.cn/jgsj/ycls/wjfb/art/2022/art_b2ede18dc38a46fe950d64f2bc2a64e2.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.qcc.com/crun/1bcdddca3222a88f053b2d2ffef15943.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://cx.cnca.cn/CertECloud/result/skipDetail?rzjgId=CNCA-R-2002-044&certNumber=04422EN0037R0M&showtemp=1&etlId=&lot_number=00fd969acb1c494e943a3a4437661bb7&pass_token=3939b0329f57b40d2517f6474214a5a218436c96ad5d41003de640effcedce80&gen_time=1696427532&captcha_output=-ztsyUCh5RpsD_D66f6bCpXnDcvt1g4ezg4BeUnpmzMCiTTVd2GqM4hKHlUFlQyhOI0v_Nbkalr79gm-6L8exs7roAzzITo-2Y3CGaPpF9yR9hRi-3J4mpfQcU_-cjRRavJmj1krIbVHcoZlm5V27RpxhoXj1fb1FVzgEpJsXAuOlVxj0m1zdagdJFW67z98ddoMiNpE5ET6v2VlrXlcFfelKYcdhNgl2twiTHloIUyvOIv1rH-7lVC701iWIL3ostudBJKrRua_bh3NPVZq0A==.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.qcc.com/creport/1bcdddca3222a88f053b2d2ffef15943.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 https://web.archive.org/web/20231127173505/https://www.ahgc.gov.cn/News/show/638930.html. Archived from the original on 27 November 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 https://web.archive.org/web/20230202142912/http://jx.ah.gov.cn/sy/wjgg/147567391.html. Archived from the original on 02 February 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20240119045101/https://jx.ah.gov.cn/sy/wjgg/148032781.html. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.qcc.com/firm/1bcdddca3222a88f053b2d2ffef15943.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.00 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10 https://www.toutiao.com/article/6723096680964555275/?channel=&source=search_tab.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://web.archive.org/web/20231004135245/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E6%B1%A0%E5%B7%9E%E5%B8%82%E8%B4%B5%E6%B1%A0%E5%8C%BA%E8%B4%B5%E8%88%AA%E9%87%91%E5%B1%9E%E5%88%B6%E5%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 04 October 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 https://news.mysteel.com/22/1207/08/4864AF649A1FA698.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 (PDF) http://jx.ah.gov.cn/group6/M00/07/1F/wKg8BmPIurSAUqXvAAIKg87bD18648.pdf.
{{cite web}}
: Missing or empty|title=
(help)