Cowlitz River Project Complex
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Cowlitz River Project Complex is a complex of operating hydroelectric power plants in United States.
The complex consists of the following projects:
Complex Details
Table 1: Project-level details for Cowlitz River Project Complex
Project name | Status | Commissioning year | Nameplate capacity | Technology type | Owner |
---|---|---|---|---|---|
Mayfield hydroelectric plant | operating[1] | 1963[1] | 162 MW[1] | Run-of-river[2] | Tacoma Power[3] |
Mossyrock hydroelectric plant | operating[1] | 1968[1] | 300 MW[1] | Conventional storage[1] | Tacoma Power[3] |
Location
Table 2: Location details for Cowlitz River Project Complex
Project name | Location | River | Coordinates (WGS 84) |
---|---|---|---|
Mayfield hydroelectric plant | Silver Creek, Lewis County, Washington, United States[1][4] | Cowlitz River[4] | 46.5035, -122.589 (exact)[1] |
Mossyrock hydroelectric plant | Silver Creek, Lewis County, Washington, United States[1][4] | Cowlitz River[4] | 46.5347, -122.425 (exact)[1] |
The map below shows the exact locations of the projects in the complex:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 US Energy Information Administration (December 27, 2022). "Preliminary Monthly Electric Generator Inventory - November". Retrieved January 13, 2023.
- ↑ https://web.archive.org/web/20221130104712/https://hydroreform.org/hydro-project/mayfield-p-2016/. Archived from the original on 30 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20221017121759/https://www.mytpu.org/about-tpu/services/power/about-tacoma-power/dams-power-sources/cowlitz-river-project/mayfield-dam/. Archived from the original on 17 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 US Energy Information Administration (September 22, 2022). "Form EIA-860 detailed data with previous form data". Retrieved January 13, 2023.