Mossyrock hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Mossyrock hydroelectric plant is an operating hydroelectric power plant in Silver Creek, Lewis County, Washington, United States.
Project Details
Table 1: Project details for Mossyrock hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Operating[1] | 1968[1] | 300 MW[1] | 2[1] | Conventional storage[1] | Tacoma Power[2] | Tacoma Power[2] |
Location
Table 2: Location details for Mossyrock hydroelectric plant
Location | River | Complex | Coordinates (WGS 84) |
---|---|---|---|
Silver Creek, Lewis County, Washington, United States[1][3] | Cowlitz River[3] | Cowlitz River Project Complex[4] | 46.5347, -122.425 (exact)[1] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 US Energy Information Administration (December 27, 2022). "Preliminary Monthly Electric Generator Inventory - November". Retrieved January 13, 2023.
- ↑ 2.0 2.1 https://web.archive.org/web/20221017121759/https://www.mytpu.org/about-tpu/services/power/about-tacoma-power/dams-power-sources/cowlitz-river-project/mayfield-dam/. Archived from the original on 17 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 US Energy Information Administration (September 22, 2022). "Form EIA-860 detailed data with previous form data". Retrieved January 13, 2023.
- ↑ https://web.archive.org/web/20221127183852/https://www.mytpu.org/about-tpu/services/power/about-tacoma-power/dams-power-sources/cowlitz-river-project/. Archived from the original on 27 November 2022.
{{cite web}}
: Missing or empty|title=
(help)