DaehanSteel Noksan Steel Plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
DaehanSteel Noksan Steel Plant (대한제강 녹산) is a steel plant in Busan, South Gyeongsang, South Korea that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Busan, South Gyeongsang, South Korea:
- Location: 333, Noksan Saneop Buk-ro, Gangseo-gu, Busan, Korea
- Coordinates (WGS 84): 35.099098, 128.860339 (exact)
Background
The DaehanSteel Noksan plant became operational in 2001. The steelmaking plant was set up in 2007 and currently has a steel billet capacity of 1000 ttpa.[1][2][3]
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source |
---|---|---|
2007-12[4][5] | 253[6] | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Daehan Steel Co Ltd [100.0%] | 4295882647 [100.0%] | E100001010335 [100.0%] | Daehan Steel Co Ltd [100%][7] | 4295882647 | E100001010335 [100%] |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment |
---|---|---|---|---|
semi-finished, finished rolled[4] | billet, rebar, bar[4] | building and infrastructure[4] | 2023-04-03[8] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1000[9] | 1000[9] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Total (all routes) |
---|---|---|
2019 | 943[10] | 943[10] |
2020 | 880[10] | 880[10] |
2021 | 970[11] | 970[11] |
2022 | 894[11] | 894[11] |
2023 | 750[11] | 750[11] |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Start date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|
unknown EAF (1) | operating[9] | 2007[4] | 1000[9] | 80.0[12] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap |
---|---|---|
unknown EAF (1) | yes[13] | 100.00[13] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "DaehanSteel 대한제강". www.idaehan.com. Retrieved 2023-12-07.
- ↑ "About - History". en.dhscorp.kr. Retrieved 2025-01-06.
- ↑ "DaehanSteel". www.idaehan.com. Retrieved 2025-01-06.
- ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20170421062204/http://www.idaehan.com:80/en/aboutus/network/domestic_sub2. Archived from the original on 2017-04-21.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://en.dhscorp.kr/history.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230512023444/https://www.idaehan.com/kr/aboutus/ir/summary. Archived from the original on 2023-05-12.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240307025407/https://www.idaehan.com/kr/main. Archived from the original on 2024-03-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://en.dhscorp.kr/certificationstatus.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 https://web.archive.org/web/20240916164455/https://www.idaehan.com/kr/aboutus/network/domestic_sub2. Archived from the original on 2024-09-16.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 https://dart.fss.or.kr/dsaf001/main.do?rcpNo=20220317000844.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 https://dart.fss.or.kr/dsaf001/main.do?rcpNo=20240314001065.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF).
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 13.0 13.1 https://web.archive.org/web/20240414073153/https://www.idaehan.com/kr/business/steel/process_sub1. Archived from the original on 2024-04-14.
{{cite web}}
: Missing or empty|title=
(help)