Daye Huaxin Industrial Co Ltd (大冶华鑫实业有限公司) is a basic oxygen furnace (BOF) steel plant operating in Huangshi, Hubei, China.
Location
The map below shows the exact location of the plant in Huangshi, Hubei, China:
- Location: Majiao Village, Jinhu Street, Daye City, Huangshi City, Hubei Province
- Coordinates (WGS 84): 30.070219, 114.926251 (exact)
Background
The company plans to construct a 1,280m³ blast furnace and a 130-ton BOF to replace the existing two 35-ton BOFs and two 35-ton electric furnaces of Hubei Dazhan Iron and Steel Co., Ltd. The 130-ton BOF project is expected to start construction in May 2023 and start production in May 2024. [1][2]
As of September 11, 2024, the project is in the approval stage and is expected to commence in Q2 of 2025.[3]
The infrastructure construction of the Jinhu Industrial Zone in the Daye Green Circular Industrial Park began in October 2023.[4]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Retired date | Workforce size |
---|---|---|---|---|---|---|---|
Main plant | Operating[5] | – | – | 2003[5] | – | – | 2402[6] |
Expansion | Construction[7][8] | 2022-09[8] | 2023-10[7] | 2024[8] | – | – | – |
Closure | Operating pre-retirement[8] | – | – | – | 2022-09[8] | 2024[8] | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | persons [56.3%]; Hubei Xinxin Steel Group Co Ltd [21.1%]; Jin Jun'an Investment Group Co Ltd [18.9%]; other [3.7%] | E100000123261 [95.4%]; E100000001753 [4.6%] | Daye Huaxin Industrial Co., Ltd.[5] | E100000126198 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|---|
Main plant | finished rolled[9] | Hot rolled steel bar[9] | building and infrastructure[9] | 2020-07-09 00:00:00[10] | 2022-04-28 00:00:00[10] | BF, BOF[11] | 2 BOF (2x35-tonne), sinter plant(1x120㎡)[11] |
Expansion | finished rolled[9] | Hot rolled steel bar[9] | building and infrastructure | –[10] | –[10] | BOF[8] | 1 BOF (1x130-tonne)[8] |
Closure | finished rolled[9] | Hot rolled steel bar[9] | building and infrastructure | –[10] | –[10] | BOF[8] | 2 BOF (2x35-tonne)[8] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Expansion | construction | 1433 TTPA[8] | 1433 TTPA[8] |
Closure | operating pre-retirement | 1150 TTPA[8][11][8][11] | 1150 TTPA[8][11][8][11] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 1200 TTPA[11][11] | 1200 TTPA[11][11] |
Expansion | construction | – | – |
Closure | operating pre-retirement | – | – |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Sinter | Pellets |
---|---|---|
Main plant | 1320 TTPA[11] | 1000 TTPA[11] |
Expansion | – | – |
Closure | – | – |
Blast Furnace Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
#1 | operating[11] | unknown | unknown | 1970[12] | 520 m³[11] | 600[11] | unknown | 2023-02-05[13] |
#2 | operating[11] | unknown | unknown | 1970[12] | 520 m³[11] | 600[11] | unknown | 2023-02-05[13] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "大冶华鑫实业130吨转炉技改项目产能(减量)置换方案公告", 湖北省经济和信息化厅,2022-9-1
- ↑ "大冶华鑫总经理受邀参加第二十二届华创会出席重点项目签约仪式". 我的钢铁网. 2022-11-17.
- ↑ "产品结构优化升级精品板材技改项目(大冶华鑫实业有限公司)". 盯工程. 2024-09-11.
- ↑ "【贯彻落实市委七届七次全会精神 当好主力军 建成节点城 奋进五十强】发力招商引资 积蓄发展动能 ——大冶绿色循环产业园金湖产业区基础设施开工建设暨2023年10月份招商引资项目集中签约活动侧记". 大冶市融媒体中心. 2023-10-30.
- ↑ 5.0 5.1 5.2 https://web.archive.org/web/20220318083201/https://www.qcc.com/weblogin?back. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119081928/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://dayeyun.cjyun.org/p/140943.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 https://m.mysteel.com/22/0905/11/A5C09229C71BE0E4_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 http://www.dayehuaxin.cn/intro/1.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 https://web.archive.org/web/20220319024143/http://www.dayehuaxin.cn/intro/5.html. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17 (PDF) https://web.archive.org/web/20220319094531/http://sthjj.huangshi.gov.cn/hjgl/jsxmhpxx/jsxmspslgs/201905/P020190513378842795676.pdf. Archived from the original (PDF) on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 http://www.d1ea.com/front/eia/30993.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 https://wuhan.cdgtw.net/news/2697728.html.
{{cite web}}
: Missing or empty|title=
(help)