Daye Huaxin Industrial Co Ltd (大冶华鑫实业有限公司) is a basic oxygen furnace (BOF) steel plant operating in Huangshi, Hubei, China.
Location
The map below shows the exact location of the plant in Huangshi, Hubei, China:
- Location: Majiao Village, Jinhu Street, Daye City, Huangshi City, Hubei Province
- Coordinates (WGS 84): 30.070219, 114.926251 (exact)
Background
The company plans to build a 130-ton BOF with a production capacity of 1.4333 million tons to replace the existing two 35-ton BOFs and two 35-ton electric furnaces of Hubei Dazhan Iron and Steel Co., Ltd. The project is expected to start construction in May 2023 and start production in May 2024. [1]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Retired date | Workforce size |
---|---|---|---|---|---|---|---|
Main plant | Operating[2] | – | – | 2003[2] | – | – | 2402[3] |
Expansion | Construction[4][5] | 2022-09[5] | 2023-10[4] | 2024[5] | – | – | – |
Closure | Operating pre-retirement[5] | – | – | – | 2022-09[5] | 2024[5] | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | persons [56.3%]; Hubei Xinxin Steel Group Co Ltd [21.1%]; Jin Jun'an Investment Group Co Ltd [18.9%]; other [3.7%] | E100000123261 [95.4%]; E100000001753 [4.6%] | Daye Huaxin Industrial Co., Ltd.[2] | E100000126198 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|---|
Main plant | finished rolled[6] | Hot rolled steel bar[6] | building and infrastructure[6] | 2020-07-09 00:00:00[7] | 2022-04-28 00:00:00[7] | BF, BOF[8] | 2 BOF (2x35-tonne), sinter plant(1x120㎡)[8] |
Expansion | finished rolled[6] | Hot rolled steel bar[6] | building and infrastructure | –[7] | –[7] | BOF[5] | 1 BOF (1x130-tonne)[5] |
Closure | finished rolled[6] | Hot rolled steel bar[6] | building and infrastructure | –[7] | –[7] | BOF[5] | 2 BOF (2x35-tonne)[5] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Expansion | construction | 1433 TTPA[5] | 1433 TTPA[5] |
Closure | operating pre-retirement | 1150 TTPA[5][8][5][8] | 1150 TTPA[5][8][5][8] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 1200 TTPA[8][8] | 1200 TTPA[8][8] |
Expansion | construction | – | – |
Closure | operating pre-retirement | – | – |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Sinter | Pellets |
---|---|---|
Main plant | 1320 TTPA[8] | 1000 TTPA[8] |
Expansion | – | – |
Closure | – | – |
Blast Furnace Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
#1 | operating[8] | unknown | unknown | 1970[9] | 520 m³[8] | 600[8] | unknown | 2023-02-05[10] |
#2 | operating[8] | unknown | unknown | 1970[9] | 520 m³[8] | 600[8] | unknown | 2023-02-05[10] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "大冶华鑫实业130吨转炉技改项目产能(减量)置换方案公告", 湖北省经济和信息化厅,2022-9-1
- ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220318083201/https://www.qcc.com/weblogin?back. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119081928/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://dayeyun.cjyun.org/p/140943.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 https://m.mysteel.com/22/0905/11/A5C09229C71BE0E4_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 http://www.dayehuaxin.cn/intro/1.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 https://web.archive.org/web/20220319024143/http://www.dayehuaxin.cn/intro/5.html. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 8.16 8.17 (PDF) https://web.archive.org/web/20220319094531/http://sthjj.huangshi.gov.cn/hjgl/jsxmhpxx/jsxmspslgs/201905/P020190513378842795676.pdf. Archived from the original (PDF) on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 http://www.d1ea.com/front/eia/30993.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://wuhan.cdgtw.net/news/2697728.html.
{{cite web}}
: Missing or empty|title=
(help)