Daye Huaxin Industrial Co Ltd

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Daye Huaxin Industrial Co Ltd (大冶华鑫实业有限公司) is a basic oxygen furnace (BOF) steel plant operating in Huangshi, Hubei, China.

Location

The map below shows the exact location of the plant in Huangshi, Hubei, China:

Loading map...
  • Location: Majiao Village, Jinhu Street, Daye City, Huangshi City, Hubei Province
  • Coordinates (WGS 84): 30.070219, 114.926251 (exact)

Background

The company plans to build a 130-ton BOF with a production capacity of 1.4333 million tons to replace the existing two 35-ton BOFs and two 35-ton electric furnaces of Hubei Dazhan Iron and Steel Co., Ltd. The project is expected to start construction in May 2023 and start production in May 2024. [1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Pre-retirement announcement date Retired date Workforce size
Main plant Operating[2] 2003[2] 2402[3]
Expansion Construction[4][5] 2022-09[5] 2023-10[4] 2024[5]
Closure Operating pre-retirement[5] 2022-09[5] 2024[5]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company GEM ID
Main plant persons [56.3%]; Hubei Xinxin Steel Group Co Ltd [21.1%]; Jin Jun'an Investment Group Co Ltd [18.9%]; other [3.7%] E100000123261 [95.4%]; E100000001753 [4.6%] Daye Huaxin Industrial Co., Ltd.[2] E100000126198

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment Detailed production equipment
Main plant finished rolled[6] Hot rolled steel bar[6] building and infrastructure[6] 2020-07-09 00:00:00[7] 2022-04-28 00:00:00[7] BF, BOF[8] 2 BOF (2x35-tonne), sinter plant(1x120㎡)[8]
Expansion finished rolled[6] Hot rolled steel bar[6] building and infrastructure [7] [7] BOF[5] 1 BOF (1x130-tonne)[5]
Closure finished rolled[6] Hot rolled steel bar[6] building and infrastructure [7] [7] BOF[5] 2 BOF (2x35-tonne)[5]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating
Expansion construction 1433 TTPA[5] 1433 TTPA[5]
Closure operating pre-retirement 1150 TTPA[5][8][5][8] 1150 TTPA[5][8][5][8]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
Main plant operating 1200 TTPA[8][8] 1200 TTPA[8][8]
Expansion construction
Closure operating pre-retirement

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Sinter Pellets
Main plant 1320 TTPA[8] 1000 TTPA[8]
Expansion
Closure

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
#1 operating[8] unknown unknown 1970[9] 520 m³[8] 600[8] unknown 2023-02-05[10]
#2 operating[8] unknown unknown 1970[9] 520 m³[8] 600[8] unknown 2023-02-05[10]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "大冶华鑫实业130吨转炉技改项目产能(减量)置换方案公告", 湖北省经济和信息化厅,2022-9-1
  2. 2.0 2.1 2.2 https://web.archive.org/web/20220318083201/https://www.qcc.com/weblogin?back. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240119081928/https://aiqicha.baidu.com/acount/accessrestriction. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://dayeyun.cjyun.org/p/140943.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 https://m.mysteel.com/22/0905/11/A5C09229C71BE0E4_abc.html. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 http://www.dayehuaxin.cn/intro/1.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 https://web.archive.org/web/20220319024143/http://www.dayehuaxin.cn/intro/5.html. Archived from the original on 19 March 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 8.16 8.17 (PDF) https://web.archive.org/web/20220319094531/http://sthjj.huangshi.gov.cn/hjgl/jsxmhpxx/jsxmspslgs/201905/P020190513378842795676.pdf. Archived from the original (PDF) on 19 March 2022. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 http://www.d1ea.com/front/eia/30993.html. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://wuhan.cdgtw.net/news/2697728.html. {{cite web}}: Missing or empty |title= (help)