Daye Special Steel Co Ltd (大冶特殊钢有限公司(湖北新冶钢有限公司)), also known as Hubei Daye Special Steel Co., Ltd., is a blast furnace-basic oxygen furnace (BF-BOF) and electric arc furnace (EAF) steel plant operating in Huangshi, Hubei, China.
Location
The map below shows the exact location of the plant in Huangshi, Hubei, China:
- Location: No. 316 Huangshi Avenue, Xisai District, Huangshi City, Hubei Province
- Coordinates (WGS 84): 30.204603, 115.125838 (exact)
Background
According to the announcement of the capacity replacement plan published in 2019, the company plans to build a 1280m3 blast furnace to eliminate 520m3 blast furnace.[1] The company will also build a new 50-ton electric furnace to eliminate two 20-ton electric furnaces, which are expected to be put into operation in 2024.[2]
However, when the blast furnace was commissioned in August 2020, its actual volume was approximately 1,840m³ instead of the intended 1,280m³, necessitating rectification and optimization. On July 30, 2024, the company completed the optimization and renovation work, reducing the furnace volume to 1,780m³.[3]
According to the project acceptance announcement issued by the Hubei Provincial Department of Economy and Information Technology in December 2023, the company’s 50-ton alloy steel electric furnace project has been completed. The two 20-ton electric furnaces designated for replacement have been dismantled in accordance with regulations.[4]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Pre-retirement announcement date | Retired date | Workforce size | Power source |
---|---|---|---|---|---|---|---|
Main plant | Operating[5] | – | 2007[6] | – | – | 5015[7] | 25 MW Distributed Photovoltaic Power Generation[8] |
Closure | Retired[9][10] | – | – | 2021-11[10] | 2023[10] | – | – |
Expansion | Operating[9][10] | 2021-11[10] | 2023[10] | – | – | – | 25 MW Distributed Photovoltaic Power Generation[8] |
Expansion | Operating[11] | 2017[12] | 2020[11] | – | – | – | 25 MW Distributed Photovoltaic Power Generation[8] |
Closure | Retired[11] | – | – | 2017[12] | 2021-06[11] | – | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Main plant | Citic Pacific Special Steel Group Co Ltd [100.0%] | E100000128047 [100%] | Daye Special Steel Co., Ltd.[5] | 5036397450 | E100000126188 |
Table 3: Process and Products
Phase | Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
Main plant | finished rolled[6] | bearing steel, automotive steel, energy steel, advanced manufacturing steel, defense equipment steel[6] | 2018-03-20 00:00:00[13] | 2015-04-27 00:00:00[13] | BF, BOF, EAF[14] | 4 EAF (2x20-tonne High Alloy Electric Furnace,2x70-tonne) 2 BOF (2x120-tonne);[15] |
Closure | finished rolled[6] | bearing steel, automotive steel, energy steel, advanced manufacturing steel, defense equipment steel[6] | – | – | EAF[12] | 2 EAF (2x20-tonne)[12] |
Expansion | finished rolled[6] | bearing steel, automotive steel, energy steel, advanced manufacturing steel, defense equipment steel[6] | – | – | EAF[12] | 1 EAF (1x50-tonne)[12] |
Expansion | finished rolled[6] | bearing steel, automotive steel, energy steel, advanced manufacturing steel, defense equipment steel[6] | – | – | BF[12] | –[12] |
Closure | finished rolled[6] | bearing steel, automotive steel, energy steel, advanced manufacturing steel, defense equipment steel[6] | – | – | BF[12] | –[12] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|---|
Main plant | operating | 2700 TTPA[16][16] | 360 TTPA[10][10] | 3060 TTPA[16][16][10][10] |
Closure | retired | – | 360 TTPA[10][10] | 360 TTPA[10][10] |
Expansion | operating | – | 360 TTPA[10] | 360 TTPA[10] |
Expansion | operating | – | – | – |
Closure | retired | – | – | – |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 1268 TTPA[17] | 1268 TTPA[17] |
Closure | retired | – | – |
Expansion | operating | – | – |
Expansion | operating | 1180 TTPA[12] | 1180 TTPA[12] |
Closure | retired | 1220 TTPA[11][11] | 1220 TTPA[11][11] |
Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | Total (all routes) |
---|---|
2020 | 3875 TTPA[18] |
2021 | –[19] |
2022 | – |
Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | 3080 TTPA[18] | 3080 TTPA[18] |
2021 | – | –[19] |
2022 | – | – |
Blast Furnace Details
Table 8: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
unknown | operating[20] | 2017[12] | unknown | 2020-08[11] | – | 1280 m³[12] | 1180[12] | unknown | unknown |
unknown | operating[5] | unknown | unknown | 2011-08-16 00:00:00[21] | – | 1780 m³[15] | 1268[17] | unknown | unknown |
unknown | retired[11] | unknown | unknown | unknown | 2021-06[11] | 520 m³[11] | 610[11] | unknown | unknown |
unknown | retired[11] | unknown | unknown | unknown | 2021-06[11] | 520 m³[11] | 610[11] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "大冶特钢2号炼铁高炉产能置换项目整改方案公示". 我的钢铁. 2023-09-15.
- ↑ 大冶特钢50吨合金钢电炉建设项目产能置换方案公告,湖北省经济和信息化厅,November 22, 2021
- ↑ "大冶特钢2号炼铁高炉批小建大问题整改完成情况公示". 新浪财经. 2024-10-23.
- ↑ "大冶特殊钢有限公司50吨合金钢电炉产能置换项目验收公告(〔2023〕年第18号)". 湖北省经济和信息化厅. 2023-012-07.
{{cite news}}
: Check date values in:|date=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20220112123511/https://www.qcc.com/firm/01284f0745768aa633ce6ff410e9a14e.html. Archived from the original on 12 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 https://web.archive.org/web/20220113204913/https://dytg.citicsteel.com/index.php/Index/index.html. Archived from the original on 13 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://aiqicha.baidu.com/company_detail_29845402337322.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20231116201147/https://xcfz.org.cn/cms/show-143235.html. Archived from the original on 16 November 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20240124202022/https://www.zgltw.cn/m/view.php?aid=44665. Archived from the original on 24 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 10.14 10.15 https://m.mysteel.com/21/1123/10/B5635F022877F9EC_abc.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.16 https://web.archive.org/web/20240119031141/https://m.mysteel.com/a/23091516/7FF6EC623E1AA370_abc.html. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 https://web.archive.org/web/20220319184008/http://www.q345qjc.com/xingyedongtai/75.html. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 https://web.archive.org/web/20231002155721/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%AE%9C%E6%98%8C%E5%B8%82%E7%A6%8F%E9%BE%99%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 02 October 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ http://www.cslpc.org/News/Details/4/8859.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml;http://www.cslpc.org/News/Details/4/8859.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 (PDF) https://web.archive.org/web/20220224072927/http://www.gov.cn/zhengce/zhengceku/2021-05/07/5605092/files/4362a77483354513be0fc81be53a4a64.pdf. Archived from the original (PDF) on 24 February 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 https://web.archive.org/web/20220722183713/https://www.sciencedirect.com/topics/chemistry/blast-furnace. Archived from the original on 22 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 https://web.archive.org/web/20240110023118/https://www.chyxx.com/shuju/202103/939658.html. Archived from the original on 10 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 https://web.archive.org/web/20231212225012/https://www.chyxx.com/shuju/202107/964433.html. Archived from the original on 12 December 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220319212057/http://www.gxyxm.com/zijingongyou/42888.html. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://comelan.com/B/201109/380279.asp.
{{cite web}}
: Missing or empty|title=
(help)