Donalam Targoviste plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Donalam Targoviste plant, also known as AFV Beltrame; Mechel COS Targoviste (predecessor); Combinatul de Oțeluri Speciale , is an electric arc furnace (EAF) steel plant operating in Târgoviște, Județul Dâmbovița, Romania.

Location

The map below shows the exact location of the plant in Târgoviște, Județul Dâmbovița, Romania:

Loading map...
  • Location: Târgoviște, Județul Dâmbovița, Romania
  • Coordinates (WGS 84): 44.904569, 25.458124 (exact)

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Workforce size Power source
Main plant Operating[1] 1973[2] 730[3]
Expansion Construction[4][1] 2022[4][1] 2023[1] 2024[5] 270[4] 75MW PV park[5]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant AFV Acciaierie Beltrame SpA [93.7%] E100001012892 [93.7%] SC Donalam SRL[1][6] 5057480714 E100001012891

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
Main plant finished rolled[1] rebar; wire rod[1][7] building and infrastructure[5] yes[8] EAF[5] 1 EAF (75-tonne)[5][9]
Expansion finished rolled[1] rebar; wire rod[1][7] building and infrastructure[5] EAF[5] 1 EAF[5]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 300 TTPA[7] 300 TTPA[7]
Expansion construction 500 TTPA[7] 500 TTPA[7]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status*
Main plant operating
Expansion construction

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://web.archive.org/web/20240402061905/https://gruppobeltrame.com/en/donalam-srl/. Archived from the original on 02 April 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240312023402/https://www.emis.com/php/company-profile/RO/Cos_Targoviste_SA_en_1475345.html. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240312023926/https://www.thediplomat.ro/2022/10/06/donalam-aims-to-recruit-250-new-employees-for-its-steel-plant-in-targoviste/. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240312022544/https://www.thediplomat.ro/2022/02/15/beltrame-group-gets-green-light-for-cos-targoviste-acquisition/. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://web.archive.org/web/20240312023551/https://eurometal.net/beltrame-launches-carbon-neutral-steel/. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240312021955/https://www.romania-insider.com/beltrame-takeover-cos-targoviste-nov-2021. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 https://web.archive.org/web/20240312023708/https://renewablesnow.com/news/italys-beltrame-to-invest-200-mln-euro-in-romanias-cos-targoviste-build-pv-park-789194/. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240312024044/https://gruppobeltrame.com/importanti-certificazioni-per-lo-stabilimento-di-targoviste/. Archived from the original on 12 March 2024. {{cite web}}: Missing or empty |title= (help)
  9. https://www.recyclingtoday.com/news/mechel-operations-suspended-romania-ukraine/. {{cite web}}: Missing or empty |title= (help)

Resources