ESF Elbe Stahlwerke Feralpi Riesa plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

ESF Elbe Stahlwerke Feralpi Riesa plant is an electric arc furnace (EAF) steel plant operating in Riesa, Saxony, Germany.

Location

The map below shows the exact location of the plant in Riesa, Saxony, Germany:

Loading map...
  • Location: Gröbaer Strasse 3, 01591 - Riesa, Germany
  • Coordinates (WGS 84): 51.312800, 13.280386 (exact)

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size
Operating[1] 1992[2] 313[3]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Feralpi Holding SpA [100.0%] 4298452820 [100%] E100000130894 [100%] ESF Elbe-Stahlwerke Feralpi GmbH[4] 4298429125 E100000130892

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment Detailed production equipment
semi-finished; finished rolled[4] billet; stick; rods; wire rods; rings; wire mesh; shaped products; links; spacers; fences; gratings[4][1] automotive; building and infrastructure[4] 2023[5] 2021[5] EAF[6][7] 1 EAF[6][7]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1400 TTPA[8] 1400 TTPA[8]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20220626074401/https://www.feralpigroup.com/en/group/global-feralpi. Archived from the original on 26 June 2022. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://www.feralpigroup.com/sites/default/files/media/documents/2021-02/BILANCIO%20CONSOLIDATO%202019%20CON%20GRAFICA%20ING.pdf. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://www.feralpigroup.com/sites/default/files/media/documents/2021-01/CS_gruppo_feralpi_Germany-print-ENG1.pdf. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240125061024/https://www.feralpigroup.com/de/gruppe/geschaeftsbereiche. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20220727120225/https://www.feralpigroup.com/en/products/certification/system-certificates. Archived from the original on 27 July 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20220320131835/https://www.feralpigroup.com/de/gruppe/identitaet/profil-der-gruppe. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 (PDF) https://web.archive.org/web/20220318115528/https://www.eurofer.eu/assets/Uploads/Map-20191113_Eurofer_SteelIndustry_Rev3-has-stainless.pdf. Archived from the original (PDF) on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20221203095852/https://feralpi-stahl.com/en/feralpi-stahl/history. Archived from the original on 03 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Resources