ESL Steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
ESL Steel plant, also known as ESL; Electrosteel Steels Limited, is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Bokaro, Jharkhand, India.
Location
The map below shows the exact location of the plant in Bokaro, Jharkhand, India:
- Location: Village: Siyaljori, PO.- Jogidih, Op.- Bangeria, PS.- Chandankyari, Dist.– Bokaro 828303, Jharkhand (INDIA)
- Coordinates (WGS 84): 23.632907, 86.293671 (exact)
Background
The ESL Steel Ltd plant began operating in 2006 under ESL Steel Ltd.[1]
The plant has had a long history of encroachment allegations. Between March 2009 to 2017, the state forest department filed 53 cases against the company. In 2017, the forest department found that the plant was built on nationally-protected forest land. ESL had lied about the project site in its documents, according to the department's July 2019 inspection report. A Supreme Court-appointed centrally empowered committee had heard of the issue much earlier in 2010, but no action had been taken before.[2]
In 2020, a group of employees protested outside and plant demanding better rights and compensation.[3]
In September 2021, an accident at the plant killed three workers.[4] In December 2022, four workers were injured during a fire incident at the plant.[5]
In 2018, the plant had a planned capacity of 2.51 mtpa and a commissioned capacity of 1.5 mtpa.[6][7] In an Expression of Interest dared August 2023, the company announced that the existing two 60 ton BOF units will be replaced by two new 65 ton BOF units.[8] The company planned to expand the capacity of the plant from 1.5 mtpa to 3 mtpa in phase-I expansion within two years, and to 6 mtpa in the next phase.[7] The expansion of hot metal capacity to 3 mtpa was expected to be completed in 2023 at an investment of US$ 348 million.[9] In December 2018, the company announced that it will add a capacity of 4.5 mtpa at a cost of US$ 3-4 billion on top of the 2.51 mtpa.[10][11][12] On 28 March 2022, Vendanta approved expansion of ESL Steel plant to 3 mtpa which will involve addition of a 1050 m3 blast furnace, 500 ttpa coke ovens, a 1800 ttpa pellet plant and an 800 tpd oxygen plant. The expansion also involves debottlenecking of blast furnace #3.[13]
In July 2023, Vendanta announced its plans to sell the ESL Steel plant.[14] In October 2023, it was reported that JSW Steel, ArcelorMittal and a few private equity funds were interested in acquiring the steel plant along with the iron ore mines, both subsidiaries of Vedanta Ltd.[15]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Iron ore source |
---|---|---|---|---|---|
Main plant | Operating[16] | – | – | 2006[17] | Koira, Barbil mines[18] |
Expansion | Construction[19] | 2018[20] | 2023[19] | –[21][22] | – |
Expansion | Announced[23] | 2018-12-25[23] | – | – | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | Vedanta Ltd [100.0%] | 4295872982 [100%] | E100001010756 [68.1%] | ESL Steel Ltd[17] | 4298544502 | E100000130900 |
Table 3: Process and Products
Phase | Steel product category | Steel products | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
Main plant | crude; semi-finished; finished rolled[24] | billets; TMT bars; wire rods; ductile iron pipes; pig iron[24][25] | 2021-06-03 00:00:00[26] | BF, BOF[24] | 2 BF; BOF; sinter plant; coke oven[27] |
Expansion | crude; semi-finished; finished rolled[24] | billets; TMT bars; wire rods; ductile iron pipes; pig iron[24][25] | 2021-06-03 00:00:00[26] | BF[28][29] | BF (1050 m3)[28][29] |
Expansion | – | – | – | –[23] | –[23] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | 1500 TTPA[30][31][32][30][31][32] | 1500 TTPA[30][31][32][30][31][32] |
Expansion | announced | – | – |
Expansion | announced | – | 4500 TTPA[23] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 1500 TTPA[33][19][33] | 1500 TTPA[33][19][33] |
Expansion | announced | 1100 TTPA[29] | 1100 TTPA[29] |
Expansion | announced | – | – |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Sinter | Coke | Pellets |
---|---|---|---|
Main plant | 2900 TTPA[34] | >0 TTPA[24] | –[24] |
Expansion | – | 500 TTPA[29] | 1800 TTPA[29] |
Expansion | – | – | – |
Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | – | – |
2021 | 1190 TTPA[29] | 1190 TTPA |
2022 | – | – |
Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | – | – |
2021 | 1355 TTPA[35] | 1355 TTPA |
2022 | 1367 TTPA[22] | 1367 TTPA |
Blast Furnace Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
1 | operating[33] | unknown | unknown | 2012[36] | – | 350 m³[37] | 400[33][19] | unknown | unknown |
2 | operating[33] | unknown | unknown | 2012[38] | China Metallurgical International[39] | 1050 m³[37] | 1100[33] | unknown | unknown |
unknown | announced[29] | 2018[20] | unknown | unknown | – | 1050 m³[29] | 1100[29] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "Annual Report 2020-2021" (PDF). Ministry of Steel, Government of India. Archived (PDF) from the original on January 27, 2022. Retrieved January 27, 2022.
- ↑ "Go-ahead for Vedanta's Jharkhand steel plant despite forest encroachment". Down to Earth. 2020-03-05. Retrieved 2022-03-06.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Trouble brews for Bokaro steel plant and Electrosteel Steels". Telegraph India. 2020-12-16. Retrieved 2022-03-06.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Three workers dead in accident at ESL Steel Plant in Bokaro". Telegraph India. 2021-09-28. Retrieved 2022-03-06.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Standard, Business. "4 workers injured in fire incident at Vedanta ESL Steel plant in Jharkhand". www.business-standard.com. Retrieved 2024-01-03.
{{cite web}}
:|first=
has generic name (help) - ↑ "Vedanta to sell Electrosteel Steels Limited 4 years after acquiring it". TimesNow. 2022-11-15. Retrieved 2024-01-03.
- ↑ 7.0 7.1 "Performance analysis of Electrosteel Steels Limited" (PDF). IPAICMAI. Retrieved 04 January, 2024.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Expression of Interest" (PDF). ESL Steel. August 2023. Retrieved 03 January, 2024.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Why Vedanta wants to sell Electrosteel and exit the steel business". 5paisa. Retrieved 2024-01-03.
- ↑ "Vedanta to set up 4.5 million tonne steel plant in Jharkhand". The Economic Times. 2018-12-25. ISSN 0013-0389. Retrieved 2024-01-03.
- ↑ PTI (2018-12-26). "Vedanta to Set up New Steel Plant in Jharkhand's Bokaro". TheQuint. Retrieved 2024-01-03.
- ↑ "After buying out the bankrupt Electrosteel, Vedanta is spending billions on a new steel plant in the Indian state of Jharkhand". Business Insider. Retrieved 2024-01-03.
- ↑ "India's Vedanta to expand steel capacity to 3mn t/yr | Argus Media". www.argusmedia.com. 2022-03-28. Retrieved 2024-01-03.
- ↑ "Past environmental issues: Vedanta's plans to sell ESL Steel may get tepid response". Financialexpress. 2023-07-05. Retrieved 2024-01-03.
- ↑ "JSW Steel, ArcelorMittal keen on acquiring Vedanta's mines, steel business in East: Report". Business Today. 2023-10-12. Retrieved 2024-01-03.
- ↑ https://web.archive.org/web/20211228204542/https://www.eslsteel.com/. Archived from the original on 28 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 (PDF) https://web.archive.org/web/20240125061008/https://steel.gov.in/sites/default/files/Annual%20Report-Ministry%20of%20Steel%202020-21.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240207181353/https://www.eslsteel.com/wp-content/uploads/2023/08/EOI-IOM-07dec21.pdf. Archived from the original (PDF) on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 (PDF) https://web.archive.org/web/20240111021456/https://www.vedantaresources.com/InvestorReports/VRL%20Results%20Presentation%201HFY24_Final.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 (PDF) https://web.archive.org/web/20240111021013/https://www.ipaicmai.in/IPANEW/UploadFiles/Casestudy/Electrosteel.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111024113/https://www.notifyvisitors.com/ext/v1/settings?bid_e=49BCFE3EB31EC4AC6E6F59280327C085&bid=9036&t=420&iFrame=false&trafficSource=&link_referrer=&pageUrl=https%3A%2F%2Fwww.5paisa.com%2Fblog%2Fq3-fy24-result-analysis-of-reliance-home-finance-ltd&path=%2Fblog%2Fwhy-vedanta-wants-to-sell-electrosteel-and-exit-the-steel-business&domain=https%3A%2F%2Fwww.5paisa.com&gmOffset=0&screenWidth=1400&screenHeight=900&isPwa=0&storage=%7B%22session%22%3A%7B%22_nv_location%22%3A%22%7B%5C%22country%5C%22%3A%5C%22United%20States%20of%20America%5C%22%2C%5C%22city%5C%22%3A%5C%22San%20Francisco%5C%22%2C%5C%22region%5C%22%3A%5C%22California%5C%22%2C%5C%22code%5C%22%3A%5C%22US%5C%22%2C%5C%22dial_code%5C%22%3A%5C%22%2B1%5C%22%2C%5C%22long%5C%22%3A%5C%22-122.459432%5C%22%2C%5C%22lat%5C%22%3A%5C%2237.781735%5C%22%2C%5C%22region_code%5C%22%3A%5C%2206%5C%22%2C%5C%22lang%5C%22%3A%5C%22english%5C%22%2C%5C%22continent_code%5C%22%3A%5C%22NA%5C%22%2C%5C%22continent_name%5C%22%3A%5C%22North%20America%5C%22%7D%22%7D%2C%22local%22%3A%7B%7D%7D&cookieData=%20_nv_sess%3D94086082.1704940865.mayzJ6QUUzwdvuaIymQniUqw3bjzw6Zc9amkPPCd2wWrY5zPat%3B%20_nv_uid%3D94086082.1704940865.1962d50f-266c-4770-bc95-63b9d0e02eb4.1704940865.1704940865.1.0%3B%20_nv_utm%3D94086082.1704940865.1.1.dXRtc3JjPShkaXJlY3QpfHV0bWNjbj0oZGlyZWN0KXx1dG1jbWQ9KG5vbmUpfHV0bWN0cj0obm90IHNldCl8dXRtY2N0PShub3Qgc2V0KXxnY2xpZD0obm90IHNldCk%3D%3B%20_nv_did%3D94086082.1704940865.207241232186zztsu%3B%20_nv_form_x_3764%3D3770%3B%20_nv_form_x_3989%3D3989%3B%20_nv_form_x_4144%3D4144%3B%20_nv_form_x_3957%3D3957%3B%20_nv_form_x_3955%3D3955%3B%20_nv_form_x_4146%3D4146%3B%20_nv_form_x_3891%3D3891%3B%20_nv_form_x_4142%3D4142%3B%20_nv_form_x_3791%3D3791%3B%20_nv_form_x_4140%3D4140%3B%20_nv_form_x_3765%3D3771%3B%20_nv_form_x_3962%3D3962%3B%20_nv_form_x_3991%3D3993%3B%20_nv_ab_ver_9036_5298%3D6422%3B%20_nv_ab_cid%3D%5B%225298%22%5D%3B%20_nv_ab_app_9036_5298%3D1%3B%20_nv_form_shw_2604%3D1%3B%20_nv_banner_x%3D20809%3B%20_nv_hit%3D94086082.1704940865.cHZpZXc9MXxidmlldz1bIjIwODA5Il0%3D&spa=%7B%22heatmaps%22%3A1%2C%22abtest%22%3A1%2C%22anal%22%3A1%2C%22banner%22%3A1%2C%22push%22%3A1%2C%22leadform%22%3A1%7D&session=function(a)%7Bif(a%26%26%22object%22%3D%3D%3Dtypeof%20a%26%26a.cookies%26%26%22object%22%3D%3D%3Dtypeof%20a.cookies%26%260%3CObject.keys(a.cookies).length%26%26a.domain)%7Bvar%20d%3DArray.isArray(a.cookies._nv_hit)%26%26a.cookies._nv_hit%5B2%5D%26%261%3D%3Da.cookies._nv_hit%5B2%5D%3F1%3A0%3BArray.isArray(a.cookies._nv_hit)%26%26a.cookies._nv_hit%5B0%5D%26%261!%3Dd%26%26(a.cookies._nv_hit%5B0%5D%3Dnotify_visitors.data.modifyHitCookie(a.cookies._nv_hit%5B0%5D))%3Bd%3D%22none%22!%3D%3Da.domain%3F%22domain%3D%22%2Ba.domain%2B%22%3B%22%3A%22%22%3Bfor(var%20b%20in%20a.cookies)%7Bvar%20f%3D%0D%0Anew%20Date%3Bif(%22_nv_sess%22%3D%3Da.cookies%5Bb%5D)%7Bif(document.cookie%3D%22_nv_sess%3D%22%2Ba.cookies%5Bb%5D%5B0%5D%2B%22%3Bexpires%3D%22%2B(new%20Date(f.getTime()%2B6E4*a.cookies%5Bb%5D%5B1%5D)).toUTCString()%2B%22%3B%22%2Bd%2B%22path%3D%2F%3B%20secure%22%2Ca.newSess%26%26a.callback_data)%7Bvar%20g%3Dnull%3Bg%3Dc.setInterval(function()%7Bc%26%26c.nvpack%26%26c.nvpack.callbackNotifyEvent%26%26(c.clearInterval(g)%2Cc.nvpack.callbackNotifyEvent.send(a.callback_data%2C%22userSession%22))%7D%2C100)%7D%7Delse%20document.cookie%3Db%2B%22%3D%22%2Ba.cookies%5Bb%5D%5B0%5D%2B%22%3B%22%2B(a.cookies%5Bb%5D%5B1%5D%3F%22expires%3D%22%2B(new%20Date(f.getTime()%2B6E4*a.cookies%5Bb%5D%5B1%5D)).toUTCString()%2B%0D%0A%22%3B%22%3A%22%22)%2Bd%2B%22%20path%3D%2F%3B%20secure%22%7D%7D%7D&modifyHitCookie=function(a)%7Bif(a)%7Bvar%20d%3Da.split(%22.%22)%2Cb%3Dnotify_visitors.data.getCookie(%22_nv_hit%22)%3Bif(b%26%26a)%7Bb%3Dc.atob(b.split(%22.%22)%5B2%5D)%3Bvar%20f%3Dc.atob(d%5B2%5D)%3Bif(b!%3D%3Df)%7Bb%3Db.split(%22%7C%22)%3Bf%3Df.split(%22%7C%22)%3Bvar%20g%3D%7B%7D%2Ck%3D%7B%7D%2Cr%3D%22%22%2Cu%3Dfunction(e)%7Bfor(var%20m%3D0%3Bm%3Ce.length%3B%2B%2Bm)for(var%20n%3Dm%2B1%3Bn%3Ce.length%3B%2B%2Bn)e%5Bm%5D%3D%3D%3De%5Bn%5D%26%26e.splice(n--%2C1)%3Breturn%20e%7D%3Bb.forEach(function(e)%7Be%3De.split(%22%3D%22)%3Bg%5Be%5B0%5D%5D%3DJSON.parse(e%5B1%5D)%7D)%3Bf.forEach(function(e)%7Be%3De.split(%22%3D%22)%3Bk%5Be%5B0%5D%5D%3DJSON.parse(e%5B1%5D)%7D)%3Bif(0%3CObject.keys(g).length%26%26%0D%0A0%3CObject.keys(k).length)%7Bfor(var%20h%20in%20k)k.hasOwnProperty(h)%26%26g.hasOwnProperty(h)%3FJSON.stringify(k%5Bh%5D)!%3D%3DJSON.stringify(g%5Bh%5D)%26%26(g%5Bh%5D%3D%22pview%22%3D%3Dh%3Fk%5Bh%5D%3Au(g%5Bh%5D.concat(k%5Bh%5D)))%3Ag%5Bh%5D%3Dk%5Bh%5D%3Bfor(var%20p%20in%20g)r%2B%3Dr%3F%22%7C%22%2Bp%2B%22%3D%22%2BJSON.stringify(g%5Bp%5D)%3A%22%22%2Bp%2B%22%3D%22%2BJSON.stringify(g%5Bp%5D)%3Breturn%20d%5B0%5D%2B%22.%22%2Bd%5B1%5D%2B%22.%22%2Bc.btoa(r)%7D%7D%7Dreturn%20a%7D%7D&getCookie=function(a)%7Ba%2B%3D%22%3D%22%3Bfor(var%20d%3DdecodeURIComponent(document.cookie).split(%22%3B%22)%2Cb%3D0%3Bb%3Cd.length%3Bb%2B%2B)%7Bfor(var%20f%3Dd%5Bb%5D%3B%22%20%22%3D%3Df.charAt(0)%3B)f%3Df.substring(1)%3Bif(0%3D%3Df.indexOf(a))return%20f.substring(a.length%2C%0D%0Af.length)%7Dreturn%22%22%7D&set_NV_UID=function(a)%7Bnotify_visitors.data.NV_UID%3Da%7D&NV_UID=1962d50f-266c-4770-bc95-63b9d0e02eb4&. Archived from the original on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 (PDF) https://web.archive.org/web/20240111024123/https://www.eslsteel.com/wp-content/uploads/2023/09/esl-annual-report-22-23.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 23.2 23.3 23.4 https://web.archive.org/web/20240111014619/https://www.theweek.in/news/biz-tech/2018/12/25/Vedanta-to-set-up-4-5MT-steel-plant-in-Jharkhand.html. Archived from the original on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 24.0 24.1 24.2 24.3 24.4 24.5 24.6 https://web.archive.org/web/20220120003831/https://www.eslsteel.com/facilities/steel-making-process.aspx. Archived from the original on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 25.0 25.1 https://web.archive.org/web/20220320171642/https://www.bloomberg.com/tosv2.html?vid. Archived from the original on 20 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 26.0 26.1 (PDF) https://www.eslsteel.com/quality/pdf/iso-14001-ems-25mar22.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220124103704/https://indsteel.org/electrosteel-steels.php. Archived from the original on 24 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 28.0 28.1 (PDF) https://web.archive.org/web/20240111042104/https://environmentclearance.nic.in/writereaddata/Online/TOR/20_Jun_2018_151101387GQHSRK91PFR.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 29.0 29.1 29.2 29.3 29.4 29.5 29.6 29.7 29.8 29.9 https://web.archive.org/web/20220329022611/https://www.argusmedia.com/en/news/2316074-indias-vedanta-to-expand-steel-capacity-to-3mn-tyr. Archived from the original on 29 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 30.0 30.1 30.2 30.3 https://web.archive.org/web/20211128153202/https://www.vedantaresources.com/Pages/ESL.aspx. Archived from the original on 28 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 31.0 31.1 31.2 31.3 (PDF) https://web.archive.org/web/20220126133822/https://www.eslsteel.com/pdf/esl-annual-report-20-21.pdf. Archived from the original (PDF) on 26 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 32.0 32.1 32.2 32.3 (PDF) https://web.archive.org/web/20220108035637/https://www.teriin.org/sites/default/files/2020-03/Towards%20a%20Low%20Carbon%20Steel%20Sector%20Report.pdf. Archived from the original (PDF) on 08 January 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 33.0 33.1 33.2 33.3 33.4 33.5 33.6 33.7 https://web.archive.org/web/20220516073622/https://www.steelmint.com/intel/india-esl-steel-undertakes-planned-maintenance-shutdown-of-one-blast-furnace-14387. Archived from the original on 16 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20210303203724/https://www.eslsteel.com/pdf/eoi-scope-work.pdf. Archived from the original (PDF) on 03 March 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240111053745/https://drive.google.com/file/d/1xVhdc0w_X5oW5XD0QX7LDRy5YW52JXgo/view. Archived from the original on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240205205830/https://economictimes.indiatimes.com/industry/indl-goods/svs/steel/bokaro-plant-ready-for-commissioning-will-auger-well-for-esl-in-future/articleshow/16576469.cms. Archived from the original on 05 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 37.0 37.1 (PDF) https://web.archive.org/web/20240205210113/https://www.eslsteel.com/wp-content/uploads/2023/08/EOI-16apr22.pdf. Archived from the original (PDF) on 05 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240218090922/https://www.constructionworld.in/steel-news/ESL-to-commission-Bokaro-plant-/5485. Archived from the original on 18 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.seetao.com/details/23711.html.
{{cite web}}
: Missing or empty|title=
(help)