Eastern Steel Kemaman plant, also known as ESSB plant, is a blast furnace-basic oxygen furnace (BF-BOF) and electric arc furnace (EAF) steel plant operating in Kemaman, Terengganu, Malaysia.

Location

The map below shows the exact location of the plant in Kemaman, Terengganu, Malaysia:

Loading map...
  • Location: Lot 6293 & 6294, Teluk Kalung Industrial Estate, 24000 Kemaman, Terengganu Darul Iman, Malaysia
  • Coordinates (WGS 84): 4.285062, 103.432551 (exact)

Background

The plant currently houses a sintering plant, an blast furnace, a BOF converter with a capacity of 700 ttpa and captive power plant.[1] The plant is planning to expand its capacity in two phases; to achieve 3 mtpa in first phase and 5 mtpa in second phase.[2] On 08 March 2023, the plant began installing a second blast furnace and 80 ton converter as part of its first phase expansion.[3][4] The second blast furnace commenced operations on 01 August, 2023.[5] The constriction of the third phase is expected to begin in 2025.[6]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Workforce size Power source
Main plant Operating[7] 2011-12[8] 2015[9] 2600[10] power/energy plant on site[7]
Expansion Operating[11] 2022-03[12] 2023[13][9] power/energy plant on site[7]
Expansion Announced[14] 2021[15] 2025[10] power/energy plant on site[7]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Hiap Teck Venture Bhd [50.0%]; Beijing Jianlong Investment Co Ltd [47.5%]; other [2.5%] 4295883073 [50%]; unknown [47.5%]; unknown [2.5%] E100000130720 [50%]; E100000123261 [47.5%]; E100000001753 [2.5%] Eastern Steel Sdn Bhd[16] 5000744992 E100000130938

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users Main production equipment Detailed production equipment
Main plant semi-finished[17] billet; slab; hot rolled coil[17][18] automotive; building and infrastructure; energy; steel packaging; tools and machinery; transport[17] BF, BOF, EAF[7] 1 BOF (65-tonne); sinter plant (100m2)[7]
Expansion semi-finished[17] billet; slab; hot rolled coil[17][18] automotive; building and infrastructure; energy; steel packaging; tools and machinery; transport[17] BF, BOF[13][19] BF (1380 m3); BOF (80 ton)[13][20][21]
Expansion semi-finished[17] billet; slab; hot rolled coil[17][18] automotive; building and infrastructure; energy; steel packaging; tools and machinery; transport[17] [14] [14]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 700 TTPA[16] 700 TTPA[16]
Expansion operating 2300 TTPA[7] 2300 TTPA[7]
Expansion announced 2000 TTPA[7]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
Main plant operating 700 TTPA[13] 700 TTPA[13]
Expansion operating 1700 TTPA[19][22][23] 1700 TTPA[19][22][23]
Expansion announced

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Sinter Coke
Main plant >0 TTPA[7]
Expansion >0 TTPA[24] 800 TTPA[25]
Expansion 2200 TTPA[25]

Blast Furnace Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 operating[26] unknown unknown unknown 670 m³[22] 700[13] unknown unknown
2 operating[20][23] unknown 2022-03-20[12][12] 2023-08-01[20][23] MCC Jingcheng[27] 1380 m³[12][19] 1700[19][22][23] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "Project Development - Eastern Steel Sdn Bhd". www.easternsteel.com.my. Retrieved 2023-11-29.
  2. "Project Development - Eastern Steel Sdn Bhd". www.easternsteel.com.my. Retrieved 2023-11-29.
  3. "Media - Eastern Steel Sdn Bhd". www.easternsteel.com.my. Retrieved 2023-11-29.
  4. "Eastern Steel starts blast furnace construction in Malaysia". www.kallanish.com. Retrieved 2023-11-29.
  5. "Eastern Steel ignites new blast furnace | SEAISI". www.seaisi.org. Retrieved 2023-11-29.
  6. "Hiap Teck's Eastern Steel to shift product focus to hot rolled coils next year". KLSE Screener. Retrieved 2023-11-29.
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 https://web.archive.org/web/20220125155837/https://www.easternsteel.com.my/en/project-development.html. Archived from the original on 25 January 2022. {{cite web}}: Missing or empty |title= (help)
  8. https://news.metal.com/newscontent/100027130/Chinese-Steel-Maker-Shougang-Starts-Venture-Project-in-Malaysia/. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20220925200535/https://htgrp.com.my/hiap-tecks-rm3-bil-expansion-plans-for-eastern-steel/. Archived from the original on 25 September 2022. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://www.klsescreener.com/v2/news/view/1230105/hiap-teck-s-eastern-steel-to-shift-product-focus-to-hot-rolled-coils-next-year. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20240119030328/https://www.steelorbis.com/steel-news/latest-news/malaysia-based-eastern-steel-commissions-new-bf-to-increase-capacity-1300987.htm. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 https://web.archive.org/web/20220529022150/https://www.steelguru.com/steel/eastern-steel-breaks-ground-for-blast-furnace-project-in-malaysia. Archived from the original on 29 May 2022. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 https://web.archive.org/web/20220113191146/https://www.metalbulletin.com/Article/3957903/FOCUS-New-Chinese-steel-mega-plants-in-SE-Asia-one-step-closer-to-completion.html. Archived from the original on 13 January 2022. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 https://web.archive.org/web/20220125155950/https://www.easternsteel.com.my/en/project-development3.html. Archived from the original on 25 January 2022. {{cite web}}: Missing or empty |title= (help)
  15. https://web.archive.org/web/20240309062925/https://theedgemalaysia.com/article/cover-story-hiap-tecks-rm3-bil-expansion-plans-eastern-steel. Archived from the original on 09 March 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  16. 16.0 16.1 16.2 https://web.archive.org/web/20220111152534/https://www.easternsteel.com.my/en/about.html. Archived from the original on 11 January 2022. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 17.2 17.3 17.4 17.5 17.6 17.7 17.8 https://web.archive.org/web/20220204140219/https://www.easternsteel.com.my/en/about3.html. Archived from the original on 04 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  18. 18.0 18.1 18.2 https://web.archive.org/web/20240111032036/https://www.seaisi.org/details/23806?type=news-rooms. Archived from the original on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 19.3 19.4 https://www.kallanish.com/en/news/steel/market-reports/article-details/eastern-steel-starts-blast-furnace-construction-in-malaysia-0323/. {{cite web}}: Missing or empty |title= (help)
  20. 20.0 20.1 20.2 https://www.seaisi.org/details/23286?type=news-rooms. {{cite web}}: Missing or empty |title= (help)
  21. https://www.kallanish.com/en/news/steel/market-reports/article-details/eastern-steel-starts-blast-furnace-construction-in-malaysia-0323/#:~:text=Malaysia's%20Eastern%20Steel%20started%20thequarter%20of%202023%2C%20Kallanish%20notes. {{cite web}}: Missing or empty |title= (help)
  22. 22.0 22.1 22.2 22.3 https://www.steelorbis.com/steel-news/latest-news/malaysias-eastern-steel-works-on-installing-new-bf-hrc-production-to-start-in-h2-1281870.htm. {{cite web}}: Missing or empty |title= (help)
  23. 23.0 23.1 23.2 23.3 23.4 https://web.archive.org/web/20231014005813/https://gmk.center/en/news/malaysias-eastern-steel-launches-second-blast-furnace/. Archived from the original on 14 October 2023. {{cite web}}: Missing or empty |title= (help)
  24. https://www.linkedin.com/posts/gmk-center_malaysias-eastern-steel-launches-second-activity-7118864784866840577-0N6X/. {{cite web}}: Missing or empty |title= (help)
  25. 25.0 25.1 (PDF) https://web.archive.org/web/20220216061018/https://enviro2.doe.gov.my/ekmc/wp-content/uploads/2019/11/12.-ESSB-EIA-Chap-5-Project-Description.pdf. Archived from the original (PDF) on 16 February 2022. {{cite web}}: Missing or empty |title= (help)
  26. https://web.archive.org/web/20220812113448/https://www.fastmarkets.com/insights/focus-new-chinese-steel-mega-plants-in-se-asia-one-step-closer-to-completion. Archived from the original on 12 August 2022. {{cite web}}: Missing or empty |title= (help)
  27. https://www.steelradar.com/en/haber/malaysian-eastern-steel-to-start-blast-furnace-project/. {{cite web}}: Missing or empty |title= (help)

Resources