Ege Steel Aliaga plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Ege Steel Aliaga plant (Ege Çelik Endüstrisi Sanayi ve Ticaret A.Ş.), also known as Ege Celik, is a steel plant in Aliağa, İzmir, Türkiye that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Aliağa, İzmir, Türkiye:
- Location: Horozgigi Mah. 15. Cad. No. 3 Aliaga, Izmir, Türkiye
- Coordinates (WGS 84): 38.728005, 26.940095 (exact)
Background
Ege Steel operates a port in Nemrut Bay with an annual capacity of 7 MTPA.[1]
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|
2001[2] | 999[3] | İzdemir Enerji power station[4] | unknown | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Ege Celik Endustrisi Sanayi ve Ticaret AŞ [100.0%] | 4298247985 [100.0%] | E100000130876 [100.0%] | Ege Celik Endustrisi Sanayi ve Ticaret AŞ [100%][5] | 4298247985 | E100000130876 [100%] |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
---|---|---|---|---|---|---|
semi-finished, finished rolled[6] | wire rod, rebar, square cross billets[2][6] | unknown | Expired[7] | Expired[8] | unknown | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
mothballed | 800[9][6] | 800[9][6] |
operating | 1200[10] | 1200[10] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF production | Other/unknown steel production |
---|---|---|
2019 | unknown | unknown |
2020 | unknown | unknown |
2021 | unknown[11] | unknown[11] |
2022 | unknown | unknown |
2023 | unknown | unknown |
Unit Details
Table 6: Electric Arc Furnace Details
Unit name | Status | Current capacity (ttpa) |
---|---|---|
unknown EAF (1) | operating[6] | 1200[10] |
unknown EAF (2) | mothballed[12] | 400[9][6] |
unknown EAF (3) | mothballed[12] | 400[9][6] |
Table 7: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated | % other iron |
---|---|---|---|---|---|---|---|---|---|
unknown EAF (1) | yes[9] | >0[9] | unknown | >0[9] | unknown | unknown | unknown | >0[9] | unknown |
unknown EAF (2) | yes[9] | >0[9] | unknown | >0[9] | unknown | unknown | unknown | >0[9] | unknown |
unknown EAF (3) | yes[9] | >0[9] | unknown | >0[9] | unknown | unknown | unknown | >0[9] | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ A safe harbor in Nemrut Bay with an annual capacity of 7 million tons, Ege Celik Endustrisi Sanayi ve Ticaret A.S., Retrieved on: Jul. 27, 2020
- ↑ 2.0 2.1 https://web.archive.org/web/20220114122158/https://www.egecelik.com.tr/en. Archived from the original on 2022-01-14.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220120215021/https://www.kariyer.net/firma-profil/ege-celik-endustrisi-sanayi-ve-ticaret-a-s-13401-3724. Archived from the original on 2022-01-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220124110734/https://www.gem.wiki/%C4%B0zdemir_Enerji_power_station. Archived from the original on 2022-01-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125060814/https://www.egecelik.com.tr/tr/genel-bakis. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 https://web.archive.org/web/20220126150654/https://www.egecelik.com.tr/. Archived from the original on 2022-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220529082443/https://www.egecelik.com.tr/en/quality-policy. Archived from the original on 2022-05-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220319214709/https://www.egecelik.com.tr/uploads/editor/Ege-Celik-EnerjiYonetimSistemi50001-2011.pdf. Archived from the original (PDF) on 2022-03-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 9.13 9.14 9.15 (PDF) https://web.archive.org/web/20240927181329/https://www.egecelik.com.tr/uploads/EgeCelik-Brochure.pdf. Archived from the original (PDF) on 2024-09-27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 https://web.archive.org/web/20221006153531/https://one.oecd.org/document/DSTI/SC(2018)2/FINAL/en/pdf. Archived from the original on 2022-10-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://www.steelorbis.com/steel-news/latest-news/new-investment-of-turkeys-ege-celik-to-be-commissioned-in-2023-1239479.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20220525192816/https://www.steelorbis.com/steel-news/interviews/ege-celik-domestic-and-international-wire-rod-demand-is-promising-despite-negativity-1120854.htm. Archived from the original on 2022-05-25.
{{cite web}}
: Missing or empty|title=
(help)