Electrosteel Castings Srikalahasthi Steel Plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Electrosteel Castings Srikalahasthi Steel Plant is a blast furnace (BF) steel plant operating in Srikalahasthi, Andhra Pradesh, India.

Location

The map below shows the exact location of the plant in Srikalahasthi, Andhra Pradesh, India:

Loading map...
  • Location: Vill - Rachagunneri ,Mandal-Srikalahasthi, District - Tirupati, Andhra Pradesh , India, Pin - 517641
  • Coordinates (WGS 84): 13.717188, 79.630588 (exact)

Background

Srikalahasthi Works (SW) of Electrosteel is an integrated facility spread across a 242 acres. The 4,00,000 TPA Ductile Iron Pipe Plant is integrated with the 5,25,000 TPA Mini Blast Furnace capacity, 2,80,000 TPA Coke Oven Plant, 22 MW Waste Heat Recovery captive Power Plant 2,00,000 TPA Cement Plant, 16,000 TPA Ferro Silicon Plant and 5 MLD Municipal Sewage Water Recycling Plant. The Blast Furnace Gas from the Mini Blast Furnace caters to various energy requirements, thereby reducing carbon emission significantly.[1] Srikalahasthi Pipes Limited was merged into Electrosteel Castings Limited in 2022.[2]

Plant Details

Table 1: General Plant Details

Plant status Start date Power source
Operating[3] 2021[4] 22 MW Waste Heat Recovery Captive Power Plant [3]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Electrosteel Castings Ltd [100%] 4295873171 [100%] E100001012393 [8.5%]; E100001012394 [6.9%]; E100001012395 [6.6%]; E100001012398 [5.9%]; E100001012392 [5.9%]; E100001012399 [5.1%]; E100001012397 [5%] Electrosteel Castings Ltd[3] 4295873171 E100001012391

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
finished rolled[3] DI pipe[3] BF[3] 1 BF[3]

Table 4: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
operating 525 TTPA[3] 525 TTPA[3]

Table 5: Upstream Products Production Capacities (thousand tonnes per annum)

Coke
280 TTPA[3]

Blast Furnace Details

Table 6: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown operating[3] unknown unknown 2021[4] 450 m³[4] 525[3] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "Electrosteel Castings Limited (ECL) | Facilities". www.electrosteel.com. Retrieved 2024-10-16.
  2. "Electrosteel Castings Limited". www.electrosteel.com. Retrieved 2024-10-16.
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 https://www.electrosteel.com/facilities/index.php#KW. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240208202919/https://pulkittmt.in/new-office-bearers-for-cii-tirupati-zone-2023-24/. Archived from the original on 08 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Resources