Finarvedi Acciai Speciali Terni steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Finarvedi Acciai Speciali Terni steel plant, also known as AST, Thyssenkrupp Acciai Speciali Terni, is a steel plant in Terni, Province of Terni, Italy that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Terni, Province of Terni, Italy:

Loading map...
  • Location: V.le B.Brin, 218 05100 Terni, Italy
  • Coordinates (WGS 84): 42.564752, 12.66936 (exact)

Plant Details

Table 1: General Plant Details

Start date Workforce size
1884[1] 2300[2]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Finarvedi SpA; thyssenkrupp AG 4296502705; 4295869754 E100000000614; E100000004212 Acciai Speciali Terni SpA[2] 5001127948 E100001010325

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[3] sheet, stainless, strip, cold rolled, coil, hot rolled, forged[3] building and infrastructure, energy, steel packaging, transport[3] 2024-10-03[4] 2022-11-25[4] 2024-04-29[5] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1450[6][7] 1450[6][7]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[8] 725[7][6] 180.0[9][7]
unknown EAF (2) operating[8] 725[7][6] 180.0[8][7]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI % sponge iron (unknown if DRI or HBI) % basic/merchant pig iron % granulated pig iron % pig iron (unknown if basic/merchant or granulated % other iron
unknown EAF (1) yes[10] 89.00[10] unknown unknown unknown unknown unknown unknown 11.00[10]
unknown EAF (2) yes[10] 89.00[10] unknown unknown unknown unknown unknown unknown 11.00[10]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20220110065359/https://www.acciaiterni.it/en/about-us/history/. Archived from the original on 2022-01-10. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240125054233/https://www.acciaiterni.it/en/about-us/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20230402015103/https://www.acciaiterni.it/en/market-and-products/forging-department/applications/. Archived from the original on 2023-04-02. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20230402022950/https://www.acciaiterni.it/en/services-and-solutions/quality-system/. Archived from the original on 2023-04-02. {{cite web}}: Missing or empty |title= (help)
  5. https://www.responsiblesteel.org/issued-certificates-and-ongoing-audits. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://web.archive.org/web/20211230223203/https://www.acciaiterni.it/en/. Archived from the original on 2021-12-30. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 "Map of EU steel production sites" (PDF). Eurofer. Archived from the original (PDF) on 2022-03-18.
  8. 8.0 8.1 8.2 https://web.archive.org/web/20230207041849/https://www.acciaiterni.it/en/market-and-products/forging-department/plants/. Archived from the original on 2023-02-07. {{cite web}}: Missing or empty |title= (help)
  9. (PDF) https://web.archive.org/web/20201023084856/https://www.stainless-steel-world.net/pdf/SSWAPR_acciai.pdf. Archived from the original (PDF) on 2020-10-23. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 (PDF) https://web.archive.org/web/20240517175827/https://www.acciaiterni.it/wp-content/uploads/2020/11/dichiaraz-Leed-v4-eng.pdf. Archived from the original (PDF) on 2024-05-17. {{cite web}}: Missing or empty |title= (help)

Resources