Fushun New Steel Co Ltd (抚顺新钢铁有限责任公司) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Fushun, Liaoning, China.
Location
The map below shows the exact location of the plant in Fushun, Liaoning, China:
- Location: No. 18 Shenfu South Line, Wanghua District, Fushun City, Liaoning Province
- Coordinates (WGS 84): 41.841223, 123.753895 (exact)
Background
According to the announcement of capacity replacement in July 2019, the company plans to replace existing BOFs with two 120-tonne BOFs. [1] #1 BOF was put into operation in April 2022.[2] Another 120-tonne BOF was put into operation in January 2023.[3]
According to the announcement of the capacity replacement plan in November 2021, the company planned to build two 1200m3 blast furnaces and one HIsmelt smelting reduction furnace. One blast furnace is expected to be put into operation in 2024, and the other is expected to be put into operation in 2025. The smelting reduction furnace is expected to be put into operation in 2025. [4] The capacity swap plan changed to build two 1400m3 blast furnaces in May 2024.[5]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Workforce size |
---|---|---|---|---|---|---|
Main plant | Operating[6] | – | – | 1958[7] | – | 5123[6] |
Closure | Operating pre-retirement[8] | – | – | – | 2019[9] | – |
Expansion | Operating[10] | 2019[9] | 2021[11] | 2022-04-16[10] | – | – |
Expansion | Operating[10] | 2019[9] | 2021[11] | 2022-04-16[10] | – | – |
Closure | Operating pre-retirement[12] | – | – | – | 2023-11-17[12] | – |
Expansion | Announced[12] | 2023-11-17[12] | – | 2024[12] | – | – |
Table 2: Ownership and Parent Company Information
Phase | State-owned entity status | Parent company | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | Partial | Beijing Jianlong Investment Co Ltd [63.2%]; Fushun State-Owned Assets Management Co Ltd [29.3%]; other [7.5%] | E100000123261 [63.2%]; E100000125773 [29.3%]; E100000001753 [7.5%] | Fushun New Steel Co., Ltd.[6] | 4298345075 | E100000124695 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|---|
Main plant | finished rolled[13] | low-alloy construction steel bars, hot-rolled ultra-thin precision strip steel, spring steel, alloy structural steel, high-quality carbon structural steel, carbon structural steel, carbon tool steel, tool steel and heat-resistant steel, electric welded pipe[13] | automotive; building and infrastructure; tools and machinery[14] | 2022[14] | 2023[14] | BF, BOF[15] | 5 BOF (3x35-tonne, 2x40-tonne)[15] |
Closure | finished rolled[13] | low-alloy construction steel bars, hot-rolled ultra-thin precision strip steel, spring steel, alloy structural steel, high-quality carbon structural steel, carbon structural steel, carbon tool steel, tool steel and heat-resistant steel, electric welded pipe[13] | automotive; building and infrastructure; tools and machinery[14] | – | – | BOF[9] | 5 BOF (3x35-tonne, 2x40-tonne)[9] |
Expansion | finished rolled[13] | low-alloy construction steel bars, hot-rolled ultra-thin precision strip steel, spring steel, alloy structural steel, high-quality carbon structural steel, carbon structural steel, carbon tool steel, tool steel and heat-resistant steel, electric welded pipe[13] | automotive; building and infrastructure; tools and machinery[14] | – | – | BOF[9] | 2 BOF (2x120-tonne)[9] |
Expansion | finished rolled[13] | low-alloy construction steel bars, hot-rolled ultra-thin precision strip steel, spring steel, alloy structural steel, high-quality carbon structural steel, carbon structural steel, carbon tool steel, tool steel and heat-resistant steel, electric welded pipe[13] | automotive; building and infrastructure; tools and machinery[14] | – | – | BOF[9] | 2 BOF (2x120-tonne)[9] |
Closure | finished rolled[13] | low-alloy construction steel bars, hot-rolled ultra-thin precision strip steel, spring steel, alloy structural steel, high-quality carbon structural steel, carbon structural steel, carbon tool steel, tool steel and heat-resistant steel, electric welded pipe[13] | automotive; building and infrastructure; tools and machinery[14] | – | – | BF[12] | –[12] |
Expansion | finished rolled[13] | low-alloy construction steel bars, hot-rolled ultra-thin precision strip steel, spring steel, alloy structural steel, high-quality carbon structural steel, carbon structural steel, carbon tool steel, tool steel and heat-resistant steel, electric welded pipe[13] | automotive; building and infrastructure; tools and machinery[14] | – | – | BF[12] | –[12] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Closure | operating pre-retirement | 2850 TTPA[16][16][16][16][16] | 2850 TTPA[16][16][16][16][16] |
Expansion | operating | 1350 TTPA[16][16] | 1350 TTPA[16][16] |
Expansion | announced | 1350 TTPA[16][16] | 1350 TTPA[16][16] |
Closure | operating pre-retirement | – | – |
Expansion | announced | – | – |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Closure | operating pre-retirement | – | – |
Expansion | operating | – | – |
Expansion | announced | – | – |
Closure | operating pre-retirement | 3150 TTPA[12][12][12][12][12] | 3150 TTPA[12][12][12][12][12] |
Expansion | announced | 2260 TTPA[12][12] | 2585 TTPA[12][12] |
Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | 3902 TTPA[17] | 3902 TTPA |
2021 | – | – |
2022 | – | – |
Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | 3563 TTPA[17] | 3563 TTPA |
2021 | – | – |
2022 | – | – |
Blast Furnace Details
Table 8: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
3 | operating pre-retirement[12] | unknown | unknown | unknown | unknown | 580 m³[12] | 675[12] | unknown | 2021-09-23[18] |
unknown | announced[12] | 2023-11-17[12] | unknown | 2024[12] | – | 1200 m³[12] | 1130[12] | unknown | unknown |
unknown | announced[12] | 2023-11-17[12] | unknown | 2026[12] | – | 1200 m³[12] | 1130[12] | unknown | unknown |
unknown | operating pre-retirement[12] | unknown | unknown | unknown | unknown | 420 m³[12] | 572[12] | unknown | unknown |
unknown | operating pre-retirement[12] | unknown | unknown | unknown | unknown | 450 m³[12] | 613[12] | unknown | unknown |
unknown | operating pre-retirement[12] | unknown | unknown | unknown | unknown | 450 m³[12] | 613[12] | unknown | 2022-07[19] |
unknown | operating pre-retirement[12] | unknown | unknown | unknown | unknown | 580 m³[12] | 675[12] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 抚顺新钢铁有限责任公司炼钢建设项目产能置换方案公告,辽宁省工业和信息化厅,2019-8-7
- ↑ 抚顺新钢铁1#转炉顺利投产,龙文钢材网,2022-04-19
- ↑ "抚顺新钢铁转炉节能环保升级改造项目二期工程热试成功". mp.weixin.qq.com. Retrieved 2024-12-05.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 抚顺新钢铁有限责任公司炼铁高炉升级改造项目产能置换方案公告,辽宁省工业和信息化厅,November 26, 2021
- ↑ "抚顺新钢铁:两座1400m?高炉投产前淘汰4座较小高炉,退出炼铁产能达315万吨-期货频道". 和讯网. Retrieved 2024-12-05.
- ↑ 6.0 6.1 6.2 https://www.qcc.com/firm/4575accaf7aa276269d463e663641ce6.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211217062029/http://www.ejianlong.com/d/jl001/steel/fssteel.jsp. Archived from the original on 17 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240119003409/https://wenku.baidu.com/view/f5cb044f8d9951e79b89680203d8ce2f006665a0.html?_wkts_=1705277518748&bdQuery=%E6%8A%9A%E9%A1%BA%E6%96%B0%E9%92%A2%E9%93%81%E7%82%BC%E9%92%A2%E4%BA%A7%E8%83%BD%E7%BD%AE%E6%8D%A2&needWelcomeRecommand=1. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 https://web.archive.org/web/20240119003744/http://www.ferro-alloys.cn/Hand/Details/921. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 https://web.archive.org/web/20240119010622/http://ydyl.china.com.cn/2022-04/18/content_85023142.htm. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://web.archive.org/web/20240119003504/https://wappass.baidu.com/static/captcha/tuxing.html?ak=572be823e2f50ea759a616c060d6b9f1&backurl=https%3A%2F%2Fmbd.baidu.com%2Fnewspage%2Fdata%2Flandingsuper%3Fid%3D1695013334095995091%26wfr%3Dspider%26for%3Dpc%26third%3Dbaijiahao%26baijiahao_id%3D1695013334095995091%26c_source%3Dkunlun%26c_score%3D0.999000×tamp=1705624503&signature=48ffe8997908246653a4378c746d540f. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 12.15 12.16 12.17 12.18 12.19 12.20 12.21 12.22 12.23 12.24 12.25 12.26 12.27 12.28 12.29 12.30 12.31 12.32 12.33 12.34 12.35 12.36 12.37 12.38 12.39 12.40 12.41 12.42 12.43 12.44 12.45 12.46 12.47 https://web.archive.org/web/20240119003141/https://mp.weixin.qq.com/s?__biz=MzA3Mjk1OTM1NA==&mid=2655069334&idx=2&sn=5d8c604bfe3b06588ca309266211e52c&chksm=84a3d083b3d45995c8b1aeded0a10be788a8cd192d95041142ba41210b64381cdf371f7d52d9&scene=27. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 13.11 https://web.archive.org/web/20201204111449/http://4871.fm086.com/Synopsis. Archived from the original on 04 December 2020.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E6%8A%9A%E9%A1%BA%E6%96%B0%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E8%B4%A3%E4%BB%BB%E5%85%AC%E5%8F%B8&fromIndex=true.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 16.00 16.01 16.02 16.03 16.04 16.05 16.06 16.07 16.08 16.09 16.10 16.11 16.12 16.13 16.14 16.15 16.16 16.17 https://wenku.baidu.com/view/f5cb044f8d9951e79b89680203d8ce2f006665a0.html?_wkts_=1694475809141&bdQuery=%E6%8A%9A%E9%A1%BA%E6%96%B0%E9%92%A2%E9%93%81%E7%82%BC%E9%92%A2%E4%BA%A7%E8%83%BD%E7%BD%AE%E6%8D%A2.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 https://www.chyxx.com/shuju/202107/963895.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://baijiahao.baidu.com/s?id=1709756489896939826&wfr=spider&for=pc.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://baijiahao.baidu.com/s?id=1737482753403682938&wfr=spider&for=pc.
{{cite web}}
: Missing or empty|title=
(help)