Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd (甘肃酒钢集团宏兴钢铁股份有限公司) is a blast furnace-basic oxygen furnace (BF-BOF) and electric arc furnace (EAF) steel plant operating in Jiayuguan, Gansu, China.
Location
The map below shows the exact location of the plant in Jiayuguan, Gansu, China:
- Location: No. 12, Xiongguan East Road, Jiayuguan City, Gansu Province
- Coordinates (WGS 84): 39.812121, 98.295555 (exact)
Background
This plant is the headquarters production base of Jiuquan Steel (Group) Co., Ltd., which also goes by JISCO.
The company plans to build a 2070m3 BF in 2022 to replace four 450m3 blast furnace. It is planned to be completed and put into operation in 2024.[1]
June 25, 2024 the company's 2070m3 BF hot blast furnace successful ignition, marking the new BF put into operation officially into the countdown.[2]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Retired date | Workforce size | Power source |
---|---|---|---|---|---|---|---|---|
Main plant | Operating[3] | – | – | 1999[3] | – | – | 13717[3] | JISCO power stations 1 and 2[4][5][6] |
Expansion | Construction[7][8] | 2021-10[8] | 2022[9] | 2024[8] | – | – | – | JISCO power stations 1 and 2[4][5][6] |
Closure | Operating pre-retirement[8] | – | – | – | 2021[8] | 2024[8] | – | JISCO power stations 1 and 2[4][5][6] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd [100%] | 4295865032 [100%] | E100000127239 | Gansu Jiu Steel Group Hongxing Iron & Steel Co Ltd[3] | 4295865032 | E100000127239 |
Table 3: Process and Products
Phase | Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
Main plant | finished rolled[10] | carbon steel, high-speed wire rod, high-speed bar, medium-thick plate, hot-rolled coil, cold-rolled sheet, stainless steel, hot-rolled coil and cold-rolled sheet[10] | 2014-01-16 00:00:00[11][12] | 2019-01-10 00:00:00[11][12] | BF, BOF, EAF[13] | 6 BOF (3x60-tonne, 3x120-tonne); 1 EAF (100-tonne)[13] |
Expansion | finished rolled[10] | carbon steel, high-speed wire rod, high-speed bar, medium-thick plate, hot-rolled coil, cold-rolled sheet, stainless steel, hot-rolled coil and cold-rolled sheet[10] | Yes[11] | – | BF[13] | –[8] |
Closure | finished rolled[10] | carbon steel, high-speed wire rod, high-speed bar, medium-thick plate, hot-rolled coil, cold-rolled sheet, stainless steel, hot-rolled coil and cold-rolled sheet[10] | Yes[11] | – | BF[13] | –[8] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|---|
Main plant | operating | 5301 TTPA[14][14][14][14][14][14] | 1200 TTPA[14] | 6501 TTPA[14][14][14][14][14][14][14] |
Expansion | construction | – | – | – |
Closure | operating pre-retirement | – | – | – |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 3800 TTPA[15][15][14] | 3800 TTPA[15][15][14] |
Expansion | construction | 1760 TTPA[8] | 1760 TTPA[8] |
Closure | operating pre-retirement | 2200 TTPA[8][8][8][8] | 2200 TTPA[8][8][8][8] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Sinter |
---|---|
Main plant | 9500 TTPA[14] |
Expansion | – |
Closure | – |
Blast Furnace Details
Table 7: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
1 | operating[16] | unknown | unknown | 1970-10-01 00:00:00[17] | – | 1800 m³[13] | 1487[15] | unknown | 2013-04-17[17] |
2 | operating[18] | unknown | unknown | 1989[17] | – | 1000 m³[13] | 826[15] | unknown | 2013-08-12[17] |
unknown | operating pre-retirement[3] | unknown | unknown | unknown | 2024[8] | 450 m³[13] | 550[8] | unknown | unknown |
unknown | operating pre-retirement[3] | unknown | unknown | unknown | 2024[8] | 450 m³[13] | 550[8] | unknown | unknown |
unknown | operating pre-retirement[3] | unknown | unknown | unknown | 2024[8] | 450 m³[13] | 550[8] | unknown | unknown |
unknown | operating pre-retirement[3] | unknown | unknown | unknown | 2024[8] | 450 m³[13] | 550[8] | unknown | unknown |
unknown | construction[9] | 2021-10[8] | 2022[9] | 2024[8] | – | 2070 m³[8] | 1760[8] | unknown | unknown |
unknown | operating[3] | unknown | unknown | unknown | – | 1800 m³[13] | 1487[14] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 酒钢宏兴建设项目产能置换方案公告,甘肃省工业和信息化厅,October 9, 2021
- ↑ "甘肃酒钢高炉新3号高炉热风炉点火成功". 武汉星宇建设咨询有限公司. 2024-07-02.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 https://web.archive.org/web/20211205150843/https://www.qcc.com/firm/84a3af06640763b1142a8e0eccf21929.html. Archived from the original on 05 December 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20220127020335/https://www.jiugang.com/article/business/electricity/. Archived from the original on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20220127020431/https://www.gem.wiki/Jisco-1_power_station. Archived from the original on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://web.archive.org/web/20210506221340/https://www.gem.wiki/Jisco-2_power_station. Archived from the original on 06 May 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ http://www.csteelnews.com/xwzx/yjgg/202310/t20231010_80152.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 8.16 8.17 8.18 8.19 8.20 8.21 8.22 8.23 8.24 8.25 8.26 8.27 8.28 8.29 https://web.archive.org/web/20220318104222/https://m.mysteel.com/21/1011/17/8A978E1C2AE62F91_abc.html. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 https://mp.weixin.qq.com/s?__biz=Mzg5MTc3NzY5MQ==&mid=2247505959&idx=3&sn=5df7ba29635aee5b33895eb2ebd0a5be&chksm=cfcabfd3f8bd36c54e5a0fd01fbad10e50a04a12670a42bdb7473637558af2f91ee852ef7870&scene=27.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 https://web.archive.org/web/20210506073621/https://www.jiugang.com/article/show/. Archived from the original on 06 May 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 https://web.archive.org/web/20220318214335/https://www.jiugang.com/article/about/jisco/. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20240115062514/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E7%94%98%E8%82%83%E9%85%92%E9%92%A2%E9%9B%86%E5%9B%A2%E5%AE%8F%E5%85%B4%E9%92%A2%E9%93%81%E8%82%A1%E4%BB%BD%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 14.00 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10 14.11 14.12 14.13 14.14 14.15 14.16 14.17 https://web.archive.org/web/20201030082846/https://www.jiugang.com/article/business/steel/. Archived from the original on 30 October 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 15.3 15.4 15.5 http://jgrb.jiugang.com/szb/pc/con/202011/24/content_18455.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://finance.sina.com.cn/money/future/indu/2023-01-13/doc-imxzyzcq2256699.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 https://www.doc88.com/p-0149690756175.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.toutiao.com/article/7201294697661317688/?channel=&source=news.
{{cite web}}
: Missing or empty|title=
(help)