Gare Palma IV 2 & 3 Coal Mine is a proposed coal mine in Raigarh, Chhattisgarh, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Gare Palma IV 2 & 3 Coal Mine Raigarh, Chhattisgarh, India 22.1199, 83.5362 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Proposed Announced

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
7 Underground & Surface Mixed 8.74507 60* *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
187.19 247 Subbituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Jindal Power Ltd[1][2] Jindal Group India

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background on Mine

The million ton-per-annum Gare Palma-IV coal mines consist of eight blocks (and possibly more that have yet to be allocated). In February 2015, following scandals about government auctions of coal blocks, all eight blocks were re-auctioned.

Block 1

Block 1 is a 6 million tonne underground mine with 141 million tonnes of reserves. In 2019-2020, it produced 0.76. After the coal auction in 2020, it was reallocated to it's previous owner Jindal Steel & Power (JSPL), a private subsidiary of the Jindal Group.[3]

Back in February 2015, JSPL had been outbid by Bharat Aluminium Company, but in March 2015 the coal ministry, arguing that this bid was too low, granted the lease to Coal India instead (along with Blocks 2 & 3).[4][5]

Blocks 2 & 3

These are a combined 6.9 MTPA surface & underground mine with 187.19 MT of mineable reserves. It was previously allocated to Jindal Steel & Power on 964.65 ha.[6] In February 2015 JSPL won renewed rights at auction, but in March 2015 the coal ministry, arguing that this bid was too low, granted the lease to Coal India instead (along with Block 1).[5] JSPL sued, and a court granted interim relief to JSPL while the lawsuit moved forward.[7] In 2022, the mines were reauctioned; the successful bidder was the Jindal Group.

Block 4

This is a 1 MTPA surface/underground mine with 39 MT of reserves. It was previously allocated to state-owned Jayaswal Neco Industries (JNIL).[8] Hindalco Industries won the block at auction in February 2015.[4]

Block 5

This is a 1 MTPA underground mine with 99 MT of reserves. It was previously allocated to Monnet Ispat & Energy, a subsidiary of the Monnet Group.[9] Hindalco Industries won the block at auction in February 2015.[4]

Block 6

This is a proposed 4 MTPA surface/underground mine with 158 MT of reserves. It was previously allocated to Jindal Steel & Power, but has not yet been mined.[10] The mine was removed from auction in February 2015 for further study.[11]

Block 7

This is a 1.2 MTPA surface mine with 60 MT of mineable reserves. After the 2020 coal auctions, it was reallocated to its previous owner Sarda Energy & Minerals (SEML).[12] Back in February 2015, Monnet Ispat & Energy won the block at auction, beating out 14 other bidders, the most of any coal block at Gare Palma-IV.[13]

In 2022, the mine was operating.[14]

Block 8

This is a proposed 1.2 million tonnes per annuam surface/underground mine with 98 million tonnes of reserves. It was previously allocated to Jayaswal Neco Industries, but has not yet been mined. [15] Ambuja Cements, a subsidiary of Swiss company Holcim, won the block at auction in February 2015. Ambuja says they plan to begin mining by 2018.[16] The project received environmental permits in 2019 and as of 2020 appears to be operating, producing 0.4 million tonnes.

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240904180848/https://www.moneycontrol.com/europe/?url=https:%252F%252Fwww.moneycontrol.com%252Fnews%252Fbusiness%252Fcompanies%252Fjindal-power-wins-most-sought-after-gare-palma-coal-block-in-ongoing-auction-10190001.html. Archived from the original on 04 September 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. (PDF) https://web.archive.org/web/20240723004151/https://www.mstcecommerce.com/auctionhome/coalblock/RenderFileCoalBlock.jsp?file=Gare-Palma-IV-2n3.pdf. Archived from the original (PDF) on 23 July 2024. {{cite web}}: Missing or empty |title= (help)
  3. Gare Palma IV/1 Mine, MSTC, accessed May 2015.
  4. 4.0 4.1 4.2 Coal auction: Balco bags one more mine in Chhattisgarh, DNA India, 21 Feb. 2015.
  5. 5.0 5.1 Cancelled JSPL, Balco mines given to Coal India, Economic Times, 23 Mar. 2015.
  6. Gare Palma IV/2 & 3 Mine, MSTC, accessed May 2015.
  7. Delhi High Court gives JSPL interim relief; restrains government from allotting coal blocks to Coal India, Economic Times, 24 Mar. 2015.
  8. Gare Palma IV/4 Mine, MSTC, accessed May 2015.
  9. Gare Palma IV/5 Mine, MSTC, accessed May 2015.
  10. Proposed Gare IV/6 Coal Mine Project: Draft EIS, Jindal Steel & Power, April 2013.
  11. Coal auction: Four Sesa bids rejected, Adani, Birla bids sail through, DNA India, 13 Feb. 2015.
  12. Gare Palma IV/7 Mine, MSTC, accessed May 2015.
  13. Monnet Ispat & Energy wins Gare Palma IV-7 mine, NewsOnProjects.com, 24 Feb. 2015.
  14. Shreya Jai,CoalMin launches largest-ever commercial coal auction of 141 mines, Business Standard, November 3, 2022
  15. Gare Palma IV/8 Mine, MSTC, accessed May 2015.
  16. Ambuja to invest Rs 370 cr for development of Gare-Palma-IV/8, Business Standard, 17 Mar. 2015.